Skip to content
Fiscal Receipts

Weapons Industrial Facilities

NavyProcurementReconciledBLI2420
What it is
Weapons Industrial Facilities (2420) is a Navy procurement line funded in the Weapons Procurement, Navy account.
What changed
+$45.7M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$179.0MP-1 TOA · PB2026
FY25 Enacted
$81.5MP-1 TOA · PB2026
FY26 Request
$127.2MP-1 TOA · PB2026
FY25→26 Change
+$45.7MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $179.0MFY25: $81.5MFY26: $127.2MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$179.0M
FY25$81.5M
FY26$127.2M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$11.4M$72.3M$179.0M
Enacted–$6.98M$2.04M$81.5M
Request––$2.04M$1.49M$127.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $2.04M for FY2024; the PB2026 book reported $179.0M as actual total obligation authority — $177.0M above the request. 179.0 − 2.0 = 177.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Weapons Industrial Facilities

The Weapons Industrial Facility (WIF) program supports the following NAVSEA and NAVAIR facilities within the Navy's Organic Industrial Base (OIB) for weapons: the active Naval Industrial Reserve Ordnance Plant (NIROP) Allegany Ballistics Laboratory (ABL) in Rocket Center, WV; the active Naval Surface Warfare Center Indian Head Division (NSWC IHD) in Indian Head, MD; the active Naval Air Warfare Center Weapons Division (NAWC WD China Lake) in China Lake, CA; and the inactive Naval Weapons Industrial Reserve Plant (NWIRP) in Bedford, MA. The budget provides funding for the Navy's weapons OIB to recapitalize and modernize aging plant infrastructure; enable process improvement to accelerate development, production, and support of weapon systems; resolve life, safety, and environmental issues; and enact immediate operational support of National Security needs. Capital rehabilitation projects within the Navy's weapons OIB support weapon systems such as Standard Missile (SM-2/6/3), Tomahawk Land Attack Missile (TLAM), Torpedoes, Mines, One-Way-Attack (OWA) systems, 2.75-inch rockets, Rolling Airframe Missile (RAM), Evolved Sea Sparrow Missile (ESSM), AIM-9X Sidewinder Missile, AIM-9M Sidewinder Missile, FMU-143 Penetrating Bomb Fuze System, Hellfire Missile, Guided Multiple-Launch Rocket System (GMLRS), Tomahawk, and Trident Gas Generators. FY 2024 includes supplemental funding from Israel Security Supplemental Appropriations Act, 2024 (Division A of Public Law 118-50) or Ukraine Security Supplemental Appropriations Act, 2024 (Division B of Public Law 118-50). DON has received $157.974 million for the expansion of organic energetic facilities at ABL and NSWC IHD. ABL is key provider of GMRLS solid rocket motors and other munition components. This funding was provided to add a new Plant 5 at the ABL site, adding three new mixer complexes. At NSWC IHD, this funding supported infrastructure and equipment projects aligned to the Navy's OIB modernization plan, to improve munition production and increase ongoing fleet support. [P5 / FU002 Capital Type Rehabilitation]: This program funds projects that eliminate environmental and safety deficiencies in compliance with local, state, and federal OSHA regulations. These regulations mandate requirements, which must be met if plant shuts down in order to avoid criminal liability, and severe financial penalties. The program also includes critical upgrades to maintain high liability areas such as fire and security systems, roofs, boilers, electrical distribution systems, bridge crane systems, and other structural repairs essential to maintain the industrial integrity of the plant. The funding will alleviate sub-tier component bottlenecks including safe and arm devices/igniters, propulsion systems, thermal batteries, airframes, control/motion/guidance systems, as well as plan and design for future surge capacity by integrating overlapping demand at component suppliers. The increase in funding from FY 2025 to FY 2026 of $45.7 million addresses supply chain bottlenecks for Navy Munitions Organic Industrial Base (OIB).

Justification

Justification — Weapons Industrial Facilities

The FY25 $80 million Congressional Add supports the establishment of additional solid rocket motor and related energetic infrastructure, associated components, materials, and equipment related to the manufacturing, production, test, logistics and analysis requirements at the Navy's Organic Industrial Base facilities. Investments include safety and readiness repairs, grinding/mixing facilities and equipment, power and fire protection upgrades, as well as support infrastructure and products. Funding for FY 2026 will support a project to procure industrial manufacturing equipment at Plant 5. This project will include requirement and specification development, procurement, and installation. Expected growth in production will increase the need for rocket motor and warhead manufacturing equipment. This equipment will increase capacity for energetics production and manufacturing for various product lines. FY 2026 includes $125 million specifically to alleviate sub-tier component bottlenecks including safe and arm devices/igniters, propulsion systems, thermal batteries, airframes, control/motion/guidance systems, as well as plan and design for future surge capacity by integrating overlapping demand at component suppliers. The increase in funding from FY 2025 to FY 2026 of $45.7 million addresses supply chain bottlenecks for Navy Munitions Organic Industrial Base (OIB).

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Weapons Procurement, NavyNFY24 Actuals$179.0M
Weapons Procurement, NavyNFY25 Enacted$81.5M
Weapons Procurement, NavyNFY26 Disc. Request$127.2M
Weapons Procurement, NavyNFY26 Total$127.2M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$461.3M$179.0M$81.5M$127.2M$127.2M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

Showing 25 of 43 from the Senate LDA disclosure database.

BOEING COMPANYWeapons|Industrial2026matched 2+ title words

H.R.4016 & S.2572 Department of Defense Appropriations Act, 2026. H.R.5342 & 2354 - Commerce, Justice, Science and…

BOEING COMPANYWeapons|Industrial2026matched 2+ title words

H.R.8800 & S.4784 National Defense Authorization Act for Fiscal Year 2027. H.R.6222 & S.2503 - Rotorcraft Operations…

KONGSBERG DEFENSE & AEROSPACE, INC.Weapons|Industrial2026matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

KONGSBERG DEFENSE & AEROSPACE, INC.Weapons|Industrial2026matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2026matched 2+ title words

P.L. 119-60 - National Defense Authorization Act FY26, National Defense Authorization Act FY27 (bills pending)…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2026matched 2+ title words

H.R. 8800/S. 4784 - National Defense Authorization Act FY27, H.R. 9495 - Department of Defense Appropriations Act FY27…

SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONWeapons|Industrial2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2027 JADC2 Cybersecurity. Cloud Acquisition policy/funding; DoD…

BAE SYSTEMS INCWeapons|Industrial2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

BOEING COMPANYWeapons|Industrial2025matched 2+ title words

H.R.1 - One Big Beautiful Bill Act and implementation (P.L.119-21). H.R.3838 - Streamlining Procurement for Effective…

BOEING COMPANYWeapons|Industrial2025matched 2+ title words

H.R.1 - One Big Beautiful Bill Act. H.Con.Res.14 & S.Con.Res.7 - Concurrent Resolution on the Budget for Fiscal Year…

BOEING COMPANYWeapons|Industrial2025matched 2+ title words

H.R.1968 - Full-Year Continuing Appropriations and Extension Act, 2025. H.Con.Res.14 & S.Con.Res.7 - Concurrent…

BOEING COMPANYWeapons|Industrial2025matched 2+ title words

H.R.3838 - Streamlining Procurement for Effective Execution and Delivery and National Defense Authorization Act for…

KONGSBERG DEFENSE & AEROSPACE, INC.Weapons|Industrial2025matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

KONGSBERG DEFENSE & AEROSPACE, INC.Weapons|Industrial2025matched 2+ title words

Issues relating to industrial base resilience, missiles, missile defense, counter-unmanned aerial systems, remote…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2025matched 2+ title words

H.R. 3838/S. 2296 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2025matched 2+ title words

P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2025matched 2+ title words

H.R. 3838 - National Defense Authorization Act FY26 (Senate bill pending), H.R. 4016 - Department of Defense…

RTX CORPORATION AND AFFILIATESWeapons|Industrial2025matched 2+ title words

P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…

SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONWeapons|Industrial2025matched 2+ title words

S.5618 - FoRGED Act (FOSTERING REFORM AND GOVERNMENT EFFICIENCY IN DEFENSE) National Defense Authorization Act JADC2…

SCIENCE APPLICATIONS INTERNATIONAL CORPORATIONWeapons|Industrial2025matched 2+ title words

Cybersecurity Border security technology Artificial Intelligence Countering Weapons of Mass Destruction Counter…

BAE SYSTEMS INCWeapons|Industrial2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCWeapons|Industrial2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCWeapons|Industrial2024matched 2+ title words

Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…

BAE SYSTEMS INCWeapons|Industrial2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…

BOEING COMPANYWeapons|Industrial2024matched 2+ title words

H.R.8774 & S.4921 - Department of Defense Appropriations Act, 2025. H.R.8771 & S. 4797 - Department of State, Foreign…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Weapons Industrial Facilities. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.