Printed from https://fiscalreceipts.com/program/2410/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
First Destination Transportation
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $5.81M |
| FY25 | $5.67M |
| FY26 | $5.35M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $4.02M | $5.50M | $5.81M | ||
| Enacted | – | $5.32M | $5.81M | $5.67M | |
| Request | – | – | $5.81M | $5.67M | $5.35M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — First Destination Transportation
First Destination Transportation (FDT) delivers material from a procurement source to the first point of use or storage which may be in the Continental United States or overseas. The procurement source may be a supplier outside of the Department of Defense (DoD) supply system or a DoD activity which fabricates new material. FDT also includes transportation from point of origin to point of use or storage when Navy-owned material or equipment is provided to a contractor incident to a Research and Development project or a system/equipment acquisition or modification.
Justification
Justification — First Destination Transportation
FY 2026 funds are required for transportation costs for shipments of WPN-procured weapons related equipment and material to the first point of use or storage, or as Government Furnished Equipment/Government Furnished Material (GFE/GFM) provided to a contractor incident to a WPN-funded system/equipment acquisition or modification.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Weapons Procurement, Navy | N | FY24 Actuals | $5.81M |
| Weapons Procurement, Navy | N | FY25 Enacted | $5.67M |
| Weapons Procurement, Navy | N | FY26 Disc. Request | $5.35M |
| Weapons Procurement, Navy | N | FY26 Total | $5.35M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $51.3M | $5.81M | $5.67M | $5.35M | $5.35M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
Support Reinstatement of NLRB Member Gwynne Wilcox (No Bill Number) Support Richard Trumka Protecting the Right to…
S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building American Energy Security Act; S. 1521, Community…
S. 4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…
S.4753 - Energy Permitting Reform Act of 2024; S. 2651, the SITE Act; S. 1456, the SPUR Act; S. 1399, the Building…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not First Destination Transportation. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O444
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O443
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O453
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.