Printed from https://fiscalreceipts.com/program/2292-PMC/ — data as of September 1, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Naval Strike Missile (NSM) — Procurement, Marine Corps
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
| Fiscal year | Amount |
|---|---|
| FY24 | $209.0M |
| FY25 | $174.8M |
| FY26 | $164.6M |
All series figures: P-1 TOA · PB2026
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $0 | $174.4M | $209.0M | ||
| Enacted | – | $174.4M | $209.0M | $174.8M | |
| Request | – | – | $209.0M | $174.8M | $164.6M |
blank = series not published for this year; – = absent from that edition.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Naval Strike Missile (NSM)
The Naval Strike Missile (NSM) provides the Littoral Combat Ship (LCS) and Frigate, Guided Missile (FFG) ships with long range offensive strike capability against surface combatants. The OTH Weapon Systems (WS) consists of a Missile Launch System (MLS) and a complement of missiles. Missile Launch System components include: a Launch Mechanism, Operator Interface, and Fire Control System which are procured with Other Procurement, Navy (OPN) Funds. Missile components include a missile encased in a firing canister (encanistered missile). An encanistered missile consists of a flight vehicle that is mechanically and electrically connected within a weapon canister. The flight vehicle's major components are operationally joined, consisting of a warhead (explosive), propulsion system, guidance system, initiation system, and other components. The weapon canister is a mechanical structure with electrical interconnections that is used to support and restrain the flight vehicle during loading and unloading operations. The weapon canister allows the flight vehicle to mechanically and electrically connect to the Missile Launch System without being exposed to the environment. The funding profile reflects a five-year Multiyear Procurement that begins in FY 2024 and completes in FY 2028. Advance Procurement information for this program is provided in the P-10 exhibit. Line item previously referred to as Littoral Combat Ship (LCS) Over the Horizon (OTH) Missile. Other Related Budgets: PMC LI 2292 and 2292C Advance Procurement OPN LI 5231 RDTEN PE 0604756N PROJ 2070 OMN PE 0204228N LI 1D4D/14D90 [P5 / Production Engineering Support - OEM]: FY 2024 through FY 2028 price per missile and quantities have been updated to actual negotiated unit costs and amounts. Along with actual price per missile/quantity costs and amounts, the engineering support costs were updated to actual cost amounts. [P5 / Engineering Support Government and Contractor]: FY 2024 through FY 2028 price per missile and quantities have been updated to actual negotiated unit costs and amounts. Along with actual price per missile/quantity costs and amounts, the engineering support costs were updated to actual cost amounts.
Description — Naval Strike Missile (NSM)
The Naval Strike Missile (NSM) provides the Marine Corps' Navy/Marine Corps Expeditionary Ship Interdiction System (NMESIS) with a ground-based, anti-ship capability. The Marine Corps will procure the same NSM configuration as the Navy. NMESIS will be employed by Medium Range Missile (MMSL) batteries. MMSL batteries will be the predominant ground fires units in the fully implemented Marine Corps artillery modernization plan. MMSL batteries will be assigned to each Marine Littoral Regiment (MLR) and will deploy with Marine Expeditionary Units. Missile components include a missile encased in a firing canister (encanistered missile). An encanistered missile consists of a flight vehicle that is mechanically and electrically connected within a weapon canister. The flight vehicle's major components are operationally joined, consisting of a warhead (explosive), propulsion system, guidance system, initiation system, and other components. The weapon canister is a mechanical structure with electrical interconnections that is used to support and restrain the flight vehicle during loading and unloading operations. The weapon canister allows the flight vehicle to mechanically and electrically connect to the Missile Launch System (MLS) or NMESIS without being exposed to the environment. Other Related Budgets: WPN 2292 [P5 / Production Engineering Support - OEM]: FY 2024 through FY 2028 price per missile and quantities have been updated to actual negotiated unit costs and amounts. Along with actual price per missile/quantity costs and amounts, the engineering support costs were updated to actual cost amounts. [P5 / Engineering Support Government and Contractor]: FY 2024 through FY 2028 price per missile and quantities have been updated to actual negotiated unit costs and amounts. Along with actual price per missile/quantity costs and amounts, the engineering support costs were updated to actual cost amounts.
Justification
Justification — Naval Strike Missile (NSM)
Naval Strike Missile (NSM) funding is required to support Over The Horizon Weapon System program for Littoral Combat Ship (LCS) and Frigate, Guided Missile (FFG) Ships. The program provides a long-range anti-surface offensive capability to improve the ship's ability to defend against enemy surface ships. Production Engineering Support - Original Equipment Manufacturer (OEM) funding supports: development of processes to ensure equipment quality and procedures to effectively operate and maintain its reliability; acquisition and cataloging of spare parts to maintain required system availability; managing the configuration baseline (hardware and software) and addressing parts obsolesce issues; acquisition and maintenance of production test equipment; participation in Configuration Control Boards (CCB); implementation of Engineering Change Proposals (ECPs) as needed; collection and analysis of production test metrics; implementation of a Quality Program Plan (QPP); maintenance of a Failure Analysis and Corrective Action Report Database (FRACAS). This is a time-based support element that represents production engineering support over the procurement buy and not tied to quantity. Engineering Support Government and Contractor funding supports: Computer Resources used to identify, plan, resource, and acquire facilities, hardware, software, documentation, manpower and personnel necessary for planning and management of mission critical systems. Government Product Support Management in compliance with the critical acquisition of Product Support Manager (PSM) in accordance with Section 805 of Public Law 111-84. Assist with Demilitarization (DEMIL)/disposal plans, Command Pass Coordinator (CPC), review of ECPs, Milestone Decision Authority (MDA) requirements, risk assessment, Curriculum Design, performance improvement, cost, manage Material Potentially Presenting an Explosive Hazards (MPPEH). Contract Program Management Office (PMO) Subject Management Experts(s) (SME(s)) provide direct support to the PMO by assisting the program manager with day-to-day acquisition and technical requirements. Develop Technical Manuals (revision of contractor provided manuals) and alignment with USN standards. Support OTH WS Integrated Product Teams, Program Management Reviews and Critical Reviews. System Engineering & Safety Block 1A review and approval. Participate in Production Readiness Reviews. Conduct assessment of production test data. Major adjustments: FY 2025 to FY 2026 increase of $7.356 million due to the procurement of four additional missiles. FY 2025 to FY 2026 AP/EOQ funding decrease from $4.412M to $3.059 million due to MYP AP/EOQ phasing. FY 2024 and FY 2025 quantities of 9 and 10, respectively, are properly displayed on the P-5. FY 2026 figures for P-40 and P-5 quantities and unit costs are incorrect. Based on current multi-year procurement (MYP) negotiated pricing, the program anticipates procuring 11 missiles at a unit cost of $2,204K to support Navy Fleet deployments. The Navy and Marine Corps collaborate on NSM procurements to optimize cost savings. Prior years (FY2024-FY2025) data for both P-40 and P-5 is undergoing reconciliation and the P-40 quantities and unit costs need to be updated in subsequent budget submissions to match P-5 actuals. 1.1.1) The funding profile reflects a five-year Multiyear Procurement that begins in FY 2024 and completes in FY 2028. Advance Procurement information for this program is provided in the P-10 exhibit. FY 2026 is the third year of a five-year Multi-Year Procurement (MYP) contract. NSM Minimum Sustaining Rate (MSR) is 32 based on the minimum lot size for the Booster. 2.1) Production Engineering Support provides for both DON and USMC. 2.2) Engineering Support Government and Contractor provides for both the DON and USMC.
Justification — Naval Strike Missile (NSM)
The FY 2026 price per missile reflects the current Navy MYP cost model in anticipation of a follow-on contract. Unit cost and quantity may fluctuate during the year of execution. NSM Minimum Sustaining Rate (MSR) is 32 based on the minimum lot size for the Booster. FY 2024 and FY 2025 quantities of 76 and 77, respectively, are properly displayed on the P-5. FY 2026 figures for P-40 and P-5 quantities and unit costs are incorrect. Based on current multi-year procurement (MYP) negotiated pricing, the program anticipates procuring 76 missiles at a unit cost of $2,204K, building capacity towards the 774 Total Munitions Requirement (TMR) in accordance with the artillery modernization plan. The Navy and Marine Corps collaborate on NSM procurements to optimize cost savings. Prior years (FY 2024-FY 2025) data for both P-40 and P-5 is undergoing reconciliation and the P-40 quantities and unit costs need to be updated in subsequent budget submissions to match P-5 actuals. FY 2026 P-40 quantities will be updated in subsequent budget exhibits after finalization of contract award. FY 2026 will procure 76 NSM for load and re-load requirements to continue building capacity for additional MMSL batteries activating in accordance with the artillery modernization plan. The 24-month lead time necessitates procurement in FY 2026 and is critical to delivering a minimal viable capability. FY 2026 is the third year of a five-year Multi-Year Procurement (MYP) contract.
Budget Line Items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $209.0M |
| Procurement, Marine Corps | N | FY25 Enacted | $174.8M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $164.6M |
| Procurement, Marine Corps | N | FY26 Total | $164.6M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget Figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element — line 1 | $205.7M | $31.3M | $29.3M | $35.3M | $35.3M |
| Program Element — line 2 | $174.4M | $209.0M | $174.8M | $164.6M | $164.6M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 149 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
18 mentions from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
P.L. 119-60 - National Defense Authorization Act FY26, National Defense Authorization Act FY27 (bills pending)…
H.R. 8800/S. 4784 - National Defense Authorization Act FY27, H.R. 9495 - Department of Defense Appropriations Act FY27…
Department of Defense Appropriations Act, 2026 (HR 4016/ S 2572); provisions regarding R&D - Navy, Air Force, Space…
National Defense Authorization Act FY26, Department of Defense Appropriations Act FY26, Intelligence Authorization Act…
H.R. 3838/S. 2296 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations…
P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…
H.R. 3838 - National Defense Authorization Act FY26 (Senate bill pending), H.R. 4016 - Department of Defense…
P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…
Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…
Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…
Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…
Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…
P.L. 118-31 - National Defense Authorization Act FY24, P.L. 118-47 Div. A - Department of Defense Appropriations Act…
P.L. 118-159 - Servicemember Quality of Life Improvement and National Defense Authorization Act FY25, H.R. 8774/S.…
H.R. 8070/S. 4638 - National Defense Authorization Act FY25, H.R. 8774/S. 4921 - Department of Defense Appropriations…
H.R. 8774 - Department of Defense Appropriations Act FY25 (Senate bill pending), H.R. 8512/S. 4443 - Intelligence…
P.L. 118-31 - National Defense Authorization Act FY24, P.L. 118-47 Div. A - Department of Defense Appropriations Act…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Naval Strike Missile (NSM) — Procurement, Marine Corps. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →