Printed from https://fiscalreceipts.com/program/2290/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Other Missile Support
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $3.69M |
| FY25 | $3.41M |
| FY26 | $3.49M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $3.47M | $3.52M | $3.69M | ||
| Enacted | – | $3.52M | $3.69M | $3.41M | |
| Request | – | – | $3.69M | $3.41M | $3.49M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Other Missile Support
The MK-41 Vertical Launching System (VLS) is a surface combatant missile launching system designed to store, select, and launch various Standard Missile configurations, Tomahawk, Tactical Tomahawk (TACTOM), Evolved SeaSparrow (ESSM) and Vertical Launch Anti-Submarine Rocket (ASROC) (VLA) missiles. The MK-41 VLS significantly improves missile capacity, flexibility, multi-mission capability, reaction time, rate of fire, and is designed to be adaptable to present and future weapon systems. Current configurations are: two 61 cell launchers (forward and aft) for 22 TICONDEROGA (CG 47) Class Cruisers beginning with CG-52, one 61-cell aft and one 29-cell launcher forward for 28 ARLEIGH BURKE (DDG 51) Class Destroyers, one 64-cell launcher aft and one 32-cell launcher forward for 34 DDG 51 FLT IIA ships.
Justification
Justification — Other Missile Support
FY 2026 funds are required for production support and Integrated Logistics Support (ILS) including: supply support, provisioning and technical documentation in support of weapon stations, All Up Round (AUR) facilities, and the fleet. Funds also provide for development and procurement of critical Engineering Change Proposals (ECP) and Ordnance Alterations (ORDALT) that improve reliability and implement safety upgrades for MK-41 VLS canisters and gas management hardware. Availability of upgraded canisters, canister hardware, and gas management hardware directly impacts fleet loadouts, operational availability, and safety.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Weapons Procurement, Navy | N | FY24 Actuals | $3.69M |
| Weapons Procurement, Navy | N | FY25 Enacted | $3.41M |
| Weapons Procurement, Navy | N | FY26 Disc. Request | $3.49M |
| Weapons Procurement, Navy | N | FY26 Total | $3.49M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $74.5M | $3.69M | $3.41M | $3.49M | $3.49M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Other Missile Support. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O412
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O419
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O422
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.