DDG 1000

NavyProcurementReconciledBLI2119
What it is
DDG 1000 (2119) is a Navy procurement line funded in the Shipbuilding and Conversion, Navy account.
What changed
-$8.74M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 18 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$392.9MP-1 TOA · PB2026
FY25 Enacted
$61.1MP-1 TOA · PB2026
FY26 Request
$52.4MP-1 TOA · PB2026
FY25→26 Change
-$8.74MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $392.9MFY25: $61.1MFY26: $52.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$392.9M
FY25$61.1M
FY26$52.4M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$56.6M$73.0M$392.9M
Enacted–$73.0M$410.4M$61.1M
Request––$410.4M$61.1M$52.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $410.4M for FY2024; the PB2026 book reported $392.9M as actual total obligation authority — $17.5M below the request. 392.9 − 410.4 = -17.5 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — DDG 1000

DDG 1000, a multi-mission surface combatant, will serve as a versatile asset in the context of future Naval Strategy. Armed with an array of weapons, DDG 1000 will provide the Joint Force Commander with precision strike and volume fires. Designed with sustainable payload, multi-spectral stealth and optimal manning, DDG 1000 will take the fight to the enemy with unprecedented striking power. The program continues to integrate the Conventional Prompt Strike (CPS) weapons system on the DDG 1000 Class. CPS installation on the lead ship by Q1 FY25 and all three ships in the class by Q4 FY28. DDG 1000 will be the first maritime platform to integrate the CPS weapons system. This naval surface hypersonic strike capability will conduct independent forward deployed operations and prosecute deep-inland, time-critical, soft and medium-hardened targets in a contested environment. The CPS capability, combined with the low observable characteristics of the ZUMWALT platform, creates a uniquely lethal and survivable naval surface platform. ZUMWALT Class enhances U.S. conventional power projection by providing an independent forward deployed strike platform, with longer range, shorter time of flight, and higher survivability against enemy defenses compared to current capabilities. CPS integration on Lyndon B. Johnson (DDG 1002) will occur during new construction, prior to the ship's arrival in homeport and prior to installation of CPS on DDG 1001. Full CPS operational capability on ZUMWALT Class is achieved when CPS is installed on all three ships and they are turned over for Fleet operations. DDG 1000 and DDG 1001 are delivered/commissioned ships. The CPS installations for these ships is budgeted with Other Procurement, Navy (OPN LI 0947) funding. DDG 1002 CPS installation is budgeted in Shipbuilding and Conversion, Navy funding.

Justification

Justification — DDG 1000

FY26 funding supports DDG 1002. - Continues efforts to integrate CPS into DDG 1002 and incorporates CS, C4I, and HM&E design improvements - Properly phases the management, testing, trials, and services for the continuation of the Combat System and Mission System Activation period. - Procurement of Universal Canister Electrical Units (1 shipset) (P-35 Item).

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Shipbuilding and Conversion, NavyNFY24 Actuals$392.9M
Shipbuilding and Conversion, NavyNFY25 Enacted$61.1M
Shipbuilding and Conversion, NavyNFY26 Disc. Request$52.4M
Shipbuilding and Conversion, NavyNFY26 Total$52.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$13.4B$392.9M$61.1M$52.4M$52.4M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N0002418F23A1medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N0002419F23A1medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278619F0044medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278619F0051medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278620F0007medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278620F0010medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278621F0002medium
BAE SYSTEMS MARITIME SOLUTIONS SAN DIEGO INC.N6278621F0003medium
BATH IRON WORKS CORPORATIONN0002406C2303medium
BATH IRON WORKS CORPORATIONN0002411C2306medium
BATH IRON WORKS CORPORATIONN0002419C2322medium
FORETHOUGHT, INC.N0002413F2320medium
FORETHOUGHT, INC.N0002420F2323medium
GE ENERGY POWER CONVERSION USA INC.N0002409C4203medium
HUNTINGTON INGALLS INCORPORATEDN0002406C2304medium
HUNTINGTON INGALLS INCORPORATEDN0002416C2311medium
RAYTHEON COMPANYN0002410C5126medium
RAYTHEON COMPANYN0002417C5145medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not DDG 1000. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.