Skip to content
Fiscal Receipts

Paladin Integrated Management (PIM)

AProcurementPartial Reconciliation2073GZ0410
What it is
Paladin Integrated Management (PIM) — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$742.3M
FY25 Total
FY26 Request
$250.2M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $742.3MFY26: $250.2MFY24FY26
FY24
$742.3M
FY26
$250.2M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$662.9M$1.01B$742.3M
Enacted$680.1M$469.2M$568.6M
Request$469.2M$417.7M$250.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $469.2M for FY2024; the PB2026 book reports $742.3M actually spent — $273.2M above the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description Paladin Integrated Management (PIM)

This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. Paladin Integrated Management (PIM) is an Acquisition Category (ACAT) level IC Major Defense Acquisition Program (MDAP). The program will replace the current fleet of M109 Family of Vehicles (FOV) which consists of the M109A6 Self-Propelled Howitzer (SPH) and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV). Paladin Integrated Management (PIM) is an Army Modernization Program that addresses a critical capability gap created by the Non-Line of Sight Cannon termination in June of 2009, as well as obsolescence and size/weight and power (SWaP) issues in the M109 Family of Vehicles (FOV) current fleet. The Paladin Integrated Management (PIM) system integrates the current Bradley Fighting Vehicle suspension and drivetrain items, Future Combat Systems (FCS) developed Electric Gun Drive systems and current fleet armament systems into a new chassis that provides better force protection, survivability and mobility over the antecedent vehicles (M109A6 and M992A2). Paladin Integrated Management (PIM) is a two-vehicle system: The M109A7 Self-Propelled Howitzer (SPH) and the M992A3 Carrier Ammunition Tracked (CAT). The M109A7 Self-Propelled Howitzer (SPH) has all characteristics listed above. The Carrier Ammunition Tracked (CAT) utilizes all these same components and traits less those that relate directly to the cannon system. The Paladin Integrated Management (PIM) system replaces the current M109 Family of Vehicles (FOV) on a one for one basis, in the cannon fires battalions in the Armored Brigade Combat Team Formations and in the Echelons Above Brigade (EAB). The Paladin Integrated Management (PIM) system will continue fielding until the Army Acquisition Objective (AAO) is complete. The overall intent is to increase Soldier force protection, vehicle survivability, provide an appropriate amount of Space, Weight, and Power (SWaP) capacity to add future capabilities, reduce life cycle costs and extend the life of the M109 FOV.

Justification

Justification Paladin Integrated Management (PIM)

FY 2026 Base Procurement dollars in the amount of $250.238 million support all aspects of the Paladin Integrated Management (PIM) Full Rate Production (FRP) program. Funding also supports the Government Program Management support required to provide oversight on contractor production operations that include Quality Process Management, Program Management Reviews (weekly, monthly, and quarterly), Government Furnished Property and Material Management, and engineering activities resulting from waivers/deviations/problem resolution and supplier/vendor industrial base. Funding also supports work being completed to provide Government Furnished Material (GFM) such as cannon assemblies to the vehicle prime production contractor as well as the contractor operations needed to sustain production operations for the acquisition of materials/components/end items, manufacturing and assembly of subsystems, and the integration, test, and checkout operations required to produce 10 vehicle sets funded with FY 2026 Base Procurement funding. The unit cost represents a cost per vehicle set (1 Self Propelled Howitzer (SPH) and 1 Carrier Ammunition Tracked (CAT)). This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Army Acquisition Objective (AAO): 689 sets

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$742.3M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$568.6M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$250.2M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$250.2M

Exhibit P-1R

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$274.5M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY 2026 request$250.2M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$5.28B$742.3M$568.6M$250.2M$250.2M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →