Paladin Integrated Management (PIM)
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $742.3M |
| FY25 | $568.6M |
| FY26 | $250.2M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $662.9M | $1.01B | $742.3M | ||
| Enacted | – | $680.1M | $469.2M | $568.6M | |
| Request | – | – | $469.2M | $417.7M | $250.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $469.2M for FY2024; the PB2026 book reported $742.3M as actual total obligation authority — $273.2M above the request. 742.35 − 469.15 = 273.20 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Paladin Integrated Management (PIM)
This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. Paladin Integrated Management (PIM) is an Acquisition Category (ACAT) level IC Major Defense Acquisition Program (MDAP). The program will replace the current fleet of M109 Family of Vehicles (FOV) which consists of the M109A6 Self-Propelled Howitzer (SPH) and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV). Paladin Integrated Management (PIM) is an Army Modernization Program that addresses a critical capability gap created by the Non-Line of Sight Cannon termination in June of 2009, as well as obsolescence and size/weight and power (SWaP) issues in the M109 Family of Vehicles (FOV) current fleet. The Paladin Integrated Management (PIM) system integrates the current Bradley Fighting Vehicle suspension and drivetrain items, Future Combat Systems (FCS) developed Electric Gun Drive systems and current fleet armament systems into a new chassis that provides better force protection, survivability and mobility over the antecedent vehicles (M109A6 and M992A2). Paladin Integrated Management (PIM) is a two-vehicle system: The M109A7 Self-Propelled Howitzer (SPH) and the M992A3 Carrier Ammunition Tracked (CAT). The M109A7 Self-Propelled Howitzer (SPH) has all characteristics listed above. The Carrier Ammunition Tracked (CAT) utilizes all these same components and traits less those that relate directly to the cannon system. The Paladin Integrated Management (PIM) system replaces the current M109 Family of Vehicles (FOV) on a one for one basis, in the cannon fires battalions in the Armored Brigade Combat Team Formations and in the Echelons Above Brigade (EAB). The Paladin Integrated Management (PIM) system will continue fielding until the Army Acquisition Objective (AAO) is complete. The overall intent is to increase Soldier force protection, vehicle survivability, provide an appropriate amount of Space, Weight, and Power (SWaP) capacity to add future capabilities, reduce life cycle costs and extend the life of the M109 FOV.
Justification
Justification — Paladin Integrated Management (PIM)
FY 2026 Base Procurement dollars in the amount of $250.238 million support all aspects of the Paladin Integrated Management (PIM) Full Rate Production (FRP) program. Funding also supports the Government Program Management support required to provide oversight on contractor production operations that include Quality Process Management, Program Management Reviews (weekly, monthly, and quarterly), Government Furnished Property and Material Management, and engineering activities resulting from waivers/deviations/problem resolution and supplier/vendor industrial base. Funding also supports work being completed to provide Government Furnished Material (GFM) such as cannon assemblies to the vehicle prime production contractor as well as the contractor operations needed to sustain production operations for the acquisition of materials/components/end items, manufacturing and assembly of subsystems, and the integration, test, and checkout operations required to produce 10 vehicle sets funded with FY 2026 Base Procurement funding. The unit cost represents a cost per vehicle set (1 Self Propelled Howitzer (SPH) and 1 Carrier Ammunition Tracked (CAT)). This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Army Acquisition Objective (AAO): 689 sets
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY24 Actuals | $742.3M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $568.6M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $250.2M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $250.2M |
Exhibit P-1R
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $274.5M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY 2026 request | $250.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $5.28B | $742.3M | $568.6M | $250.2M | $250.2M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| PA-10 | $3.37B |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| BAE SYSTEMS LAND & ARMAMENTS L.P. | W56HZV14C0002 | high |
| BAE SYSTEMS LAND & ARMAMENTS L.P. | W56HZV17C0001 | high |
| BAE SYSTEMS LAND & ARMAMENTS L.P. | W912CH24F0170 | high |
| BAE SYSTEMS LAND & ARMAMENTS L.P. | W56HZV16C0167 | medium |
| BAE SYSTEMS LAND & ARMAMENTS L.P. | W912CH25F0270 | medium |
| CUMMINS INC | W56HZV22C0050 | medium |
| CUMMINS INC. | W56HZV21P0041 | medium |
| WULCO INC | W912CH25F0304 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
Department of Defense Appropriations Act, 2026 (HR 4016/ S 2572); provisions regarding R&D - Navy, Air Force, Space…
Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Paladin Integrated Management (PIM). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O94
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O91
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O92
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
FY2026 Department of Defense Budget: Procurement Programs (P-1R) · comptroller.war.gov
Exhibit P-1R · P34
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1R_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Procurement of Weapons and Tracked Combat Vehicles · www.asafm.army.mil
PDF page 94