M109 FOV Modifications — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$91.0M
FY25 Total
FY26 Request
$82.5M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $91.0MFY26: $82.5MFY24FY26
FY24
$91.0M
FY26
$82.5M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$333.0K$3.03M$91.0M
Enacted$3.03M$91.0M$42.6M
Request$91.0M$42.6M$82.5M

blank = series not published for this year; – = absent from that edition.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description M109 FOV Modifications

This funding line is a key enabler of the Army Modernization Priorities in support of the Long-Range Precision Fires. The M109 Family of Vehicles (FOV) Modifications line consists of the M109A6 Self-Propelled Howitzer (SPH) and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV), the M109A7 Self-Propelled Howitzer (SPH) and M992A3 Carrier, Ammunition, Tracked (CAT). The funding profile provides for the engineering design, testing, hardware procurement, and application in support of improvements to resolve problems identified in the field and approved by the Materiel Developer and Combat Developer for fielded M109 Family of Vehicles (FOV). These improvements address maintaining operational readiness rates, improving vehicle safety and operation, and integrating new equipment. Funding also supports aspects of program management necessary to support the fielded fleet of M109 Family of Vehicles (FOV) in 16 Active Duty Army and National Guard Battalions organic to Armored Brigade Combat Teams (ABCT); 10 Battalions organic to Army Fires Brigades; 3 Rotational unit sets; 4 Army Prepositioned Stock sets; 2 Institutional Training Sites, 2 Combat Training Centers, and other facility vehicles for System Technical Support (STS) work for development and qualification of proposed engineering changes and technical improvements. Engineering Change Proposals (ECPs) will be applied through a modification work order and procured for the M109 Family of Vehicles.

Justification

Justification M109 FOV Modifications

FY 2026 base procurement funding in the amount of $82.537 million supports M109 Family of Vehicles (FOV) modifications, program office requirements and Systems Technical Support (STS) contractor support for M109 Family of Vehicles (FOV). Program management is for the oversight of Other Governmental Agencies (OGAs) that provides material support to the system and the fielded units to ensure configuration management; provides the analysis and root cause of safety and non-safety related field failures; provides M109 FOV Depot Overhaul support as needed; provides planning and execution for obsolescence of parts, sub-systems and systems; develops and coordinates shrinking supply base mitigation strategies with item managers. The program office works to lower operation and sustainment costs and improve unit readiness by analyzing data and determining solutions to solve the field's problem sets. The program office manages the Systems Technical Support/Sustainment Systems Technical Support (STS/SSTS) contract that provides direct support to the program and the field. Contractor provides the direct engineering support required to integrate modification kits; provides the logistical support to provision, source, and supports the field with material solutions/changes. Contractor also updates/corrects all system technical data, provisioning data, technical manuals, and Interactive-Electronic Technical Manuals (IETMs). Contractor provides emergency field support to the Government as required for essential mission accomplishment. A portion of this funding line is a key enabler of the Army Modernization Priorities in support of the Long-Range Precision Fires. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY24 Actuals$91.0M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY25 Enacted$42.6M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Disc. Request$82.5M
Procurement of Weapons and Tracked Combat Vehicles, ArmyAFY26 Total$82.5M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$2.19B$91.0M$42.6M$82.5M$82.5M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →