Printed from https://fiscalreceipts.com/program/2026/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
SPQ-9B Radar
Watch this program
Budget figures
No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $7.26MP-1 TOA · PB2026 |
| FY25 | $7.40MP-1 TOA · PB2026 |
| FY26 | $0J-book detail · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 |
|---|---|---|---|---|
| Actuals | $14.2M | $12.1M | $7.26M | |
| Enacted | – | $12.1M | $7.27M | $7.40M |
| Request | – | – | $7.27M | $7.40M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $7.27M for FY2024; the PB2026 book reported $7.26M as actual total obligation authority — $5.00K below the request. 7.3 − 7.3 = -0.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — SPQ-9B Radar
Beginning in FY26, all funding under LI 2026 has been realigned to LI 2981 - In-Service Radars and Sensors. The scope of this LI is changing based on the PE/BLI consolidation effort in the DoD Implementation Plan from the Commission on PPBE Reform Final Report. This program provides for procurement of AN/SPQ-9B radars whose primary mission is to detect and track low flying Anti-Ship Missile targets in heavy clutter. The mission of the AN/SPQ-9B has been expanded to include the capability to detect and classify periscopes. The Periscope Detection and Discrimination (PDD) capability has been designed and incorporated to operate concurrently with the Anti-Ship Missile Defense (ASMD) capability. [BR5IN AN/SPQ-9B FMP INSTALLATIONS]: AN/SPQ-9B systems are installed using Alteration Installation Teams (AITs) that customarily require funding for planning yard Design Services Allocation (DSA) up to two years prior to the year of installation and funding for Advanced Planning (AP) one year prior to installation, to support individual ship class drawing packages, ship checks and long lead material unique to the installation in order to maintain alignment with ship availability schedules. Radars continue to be procured for new construction DDGs and improvements to these and in-service systems continue to be deployed to pace the threat. [BR6IN AN/SPQ-9B NON-FMP INSTALLATIONS]: Provided funding for the installation of equipment for Land Based Test Sites (LBTS). [P40A / BR040 TRANSMITTER UPGRADE FMP]: Funding was provided for installations of AN/SPQ-9B Transmitter Upgrades on LPD-17. [P40A / BR040 TRANSMITTER UPGRADE NON-FMP EQUIPMENT]: Funding provided for Transmitter Upgrade Processor installations at Surface Warfare Engineering Facility (SWEF) and Combat Systems Engineering Development Site (CSEDS) (both non-FMP). [P40A / BR042 AN/SPQ-9B ENGINEERING CHANGE PROPOSALS (ECP)]: Procures product improvements generated by Engineering Change Proposals (ECPs); corrects problems reported by Fleet units; upgrades unreliable components and replaces obsolete components and parts no longer in production for AN/SPQ-9B Radar; and addresses supportability concerns. Purchases and installs ECPs, including Antenna Shock Upgrade Kits, Antenna Radar Components, Digital Signal Processor (DSP) Kits, Periscope Detection and Discrimination (PDD) Kits and engineering change kit hardware components. Antenna Shock Upgrade Kits are installed during Antenna Restorations. DSP and PDD kits are installed conjunctively via Alteration Installation Team (AIT) and can be accomplished outside of a CNO Availability. [P40A / BR830 AN/SPQ-9B PRODUCTION SUPPORT]: Provides support for production of hardware and hardware components and is composed primarily of Warfare Center Activity support, Software Support Activity (SSA), Integrated Logistics Agent (ILA), Acquisition Engineering Agent (AEA), Technical Design Agent (TDA), Engineering Support Services (ESS) and Professional Support Services (PSS). Also includes support for cybersecurity compliance and software certification. [P3A / BR040 AN/SPQ-9B RADAR FMP EQUIPMENT]: Procures AN/SPQ-9B Radars to add Anti-Ship Missile Defense (ASMD) capability to Shipboard Combat Systems. Procures radars to support combat systems on the following ship classes: CG, LHA, DDG, CVN, LHD, LPD, U.S. Coast Guard National Security Cutter and a Training Unit. Systems procured for Cruisers/Destroyers (CRUDES) and Amphibious Ships in FY14 through FY21 include the Periscope Detection and Discrimination (PDD) capability.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $7.26M |
| Other Procurement, Navy | N | FY25 Enacted | $7.40M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $314.4M | $7.26M | $7.40M | $0 | $0 |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| LAUREL TECHNOLOGIES PARTNERSHIP | N0002418C5395 | high |
| NORTHROP GRUMMAN SYSTEMS CORPORATION | N0002416C5343 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not SPQ-9B Radar. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O661
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O645
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O673
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
OPN BA1 Book · www.secnav.navy.mil