Printed from https://fiscalreceipts.com/program/2025/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Amphibious Combat Vehicle Family of Vehicles
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $545.1M |
| FY25 | $810.3M |
| FY26 | $790.8M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $520.7M | $518.5M | $545.1M | ||
| Enacted | – | $527.1M | $557.6M | $810.3M | |
| Request | – | – | $557.6M | $810.3M | $790.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $557.6M for FY2024; the PB2026 book reported $545.1M as actual total obligation authority — $12.5M below the request. 545.1 − 557.6 = -12.5 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Amphibious Combat Vehicle Family of Vehicles
This is a Commandant of the Marine Corps, Force Design program. The Amphibious Combat Vehicle (ACV) provides protected mobility to otherwise dismounted infantry formations and enables littoral maneuver from ship-to-shore and from shore-to-shore. Equipped with modern communications systems and weapons for infantry support-by-fire, the ACV significantly improves the ability of Fleet Marine Forces to access, seize, and hold key maritime terrain in the execution of Expeditionary Advanced Base Operations. The ACV is imperative to realizing the Marine Corps' requirements for Fleet Marine Force, which is the capability to project power from the sea ensures joint freedom of maneuver against increasingly sophisticated area denial and anti-access strategies across the range of military operations in areas vital to our national interest. To this end, an ACV creates operational and tactical options through rapid maneuver on sea and land, provides for the seamless transition of combat power from sea to land, enables rapid response to crisis, enables the introduction of joint follow-on forces and can impose disproportionate costs on our enemies who must extend their defenses. This program delivered the initial capability of the Personnel variant (ACV-Ps) in November 2020, and the Command variant (ACV-Cs) in October 2024. The program is on track to deliver the initial capability of and the Improved Lethality 30MM variant (ACV-30s) in the third quarter of FY 2026, and the Recovery variants (ACV-Rs) in the third quarter of FY 2028. The ACV replaces the legacy Assault Amphibious Vehicle (AAV) in Assault Amphibious (AA) battalions within the Marine Divisions. ACV-equipped AA companies will provide protected mobility and general support lift to elements of Marine Infantry battalions. The ACV, an advanced generation, eight-wheeled armored personnel carrier, will mitigate current and projected capability gaps by providing improved lethality against dismounted enemy troops, more effective land and water tactical mobility, and increased force protection and survivability from blasts, fragmentation, and kinetic energy threats. The initial ACV Increment (FY 2018 - FY 2021) Personnel variant delivered combat ready Marines from ship-to-shore in order to mass forces at littoral penetration points and continue to maneuver onward to inland objectives. Subsequent procurements (FY 2022 - FY 2026) are planned to expand the personnel carrier quantities and to procure command and control, improved lethality, and tactical recovery capabilities. In an Acquisition Decision Memorandum (ADM) from the Assistant Secretary of the Navy for Research, Development and Acquisition (ASN(RD&A)), dated 8 January 2019, detailed the Milestone Decision Authority combining the ACV 1.1 and ACV 1.2 programs into a single ACV Family of Vehicles (FOV) that continues the established phased development and procurement approach. This approach allows the Marine Corps to procure a modernized assault amphibian to serve as the platform to perform missions across the range of military operations to include joint forcible entry operations. In an ADM dated 12 July 2019, ASN(RD&A) authorized a third lot of low rate initial production (LRIP) consisting of 56 vehicles and directed that the acquisition documentation reflecting this change was updated as part of the Full Rate Production (FRP) Milestone decision approval process. The first lot of full rate production was procured in FY 2021. The merger and additional lot of LRIP are updates from the FY 2020 acquisition strategy.
Justification
Justification — Amphibious Combat Vehicle Family of Vehicles
FY 2026 Baseline Appropriation Request: $790.789M. Funds will procure Lot 9 (Full Rate Production Lot 6), which includes a quantity of 59 ACV-30mm, 32 ACV-R variants, and the procurement of related items such as Turret Systems, Crane & Winch Systems, Production Support, Systems Engineering/Program Management (SE/PM), Engineering Change Orders (ECOs), Government Furnished Equipment (GFE), and Integrated Logistics Support (ILS). FY 2026 funding continues the second year of production for the ACV-30mm and initiates and completes the procurement of the ACV-R variant. The decrease between FY 2025 and FY 2026 is primarily attributed to procuring 32 less ACV-30mm variants in FY 2026 than in FY 2025. There are increases and decreases in multiple cost elements on the P5 that make up the net decrease. These increases and decreases are explained in detail on the P5 exhibits. The FY 2026 request was reduced by $0.875 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement, Marine Corps | N | FY24 Actuals | $545.1M |
| Procurement, Marine Corps | N | FY25 Enacted | $810.3M |
| Procurement, Marine Corps | N | FY26 Disc. Request | $790.8M |
| Procurement, Marine Corps | N | FY26 Total | $790.8M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $2.12B | $545.1M | $810.3M | $790.8M | $790.8M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| BAE SYSTEMS LAND AND ARMAMENTS L.P. | M6785416C0006 | high |
| KONGSBERG DEFENCE & AEROSPACE AS | M6785425C0023 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
Showing 25 of 136 from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
Issues related to aviation and trucking, policies and regulations related to trucking efficiencies, infrastructure…
Issues related to aviation and trucking, policies and regulations related to trucking efficiencies, infrastructure…
H.R.2424 - Modern, Clean, and Safe Trucks Act of 2025 H.R.2391 - Strengthening the Supply Chain Through Truck Drivers…
Legislative monitoring of Open Skies Agreements Legislative monitoring of general trade issues including customs…
Department of Defense Appropriations Act and National Defense Authorization Act (NDAA), issues relating to combat…
FY27 National Defense Authorization Act (HR 8800 / S 4784) and FY27 Department of Defense Appropriations Bill (HR…
In support of the advancement of ground combat vehicle programs and submarine building.
Issues related to shipbuilding and combat vehicles. Industrial base support.
Issues related to shipbuilding and combat vehicles. Industrial base support.
In support of the advancement of ground combat vehicle programs and submarine building.
DPA TItle III funding FY27 NDAA FY27 Defense Appropriations Act Issues realted to Army Aviation & combat vehicles; Air…
Production Act Title III funding FY27 National Defense Authorization Act FY27 Defense Appropriations FY27 MilCon-VA…
Production Act Title III funding S4783/H.R.8800, FY27 National Defense Authorization Act FY27 Defense Appropriations…
H.R.9495/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
H.R.____/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
House and Senate Fiscal year 2026 and 2027 Department of Defense (DoD) Authorization and Appropriation Bills - issues…
House and Senate Fiscal year 2027 Department of Defense (DoD) Authorization and Appropriation Bills - issues related…
Monitor and engage on legislative and administrative action related to equipment and vehicle manufacturing and the…
Monitor and engage on legislative and administrative action related to equipment and vehicle manufacturing and the…
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Defense funding for V-22, RQ-7 Shadow, Ship to Shore Connector, and Robotic Combat Vehicle
Domestic Manufacturing Conversion grants. Autonomous vehicle manufacturing labor standards. Auto tariffs and reshoring…
Domestic Manufacturing Conversion grants. Advanced Technology Vehicles Manufacturing Loan Program (ATVM). Corporate…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Amphibious Combat Vehicle Family of Vehicles. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O773
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O751
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O790
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.