Printed from https://fiscalreceipts.com/program/2000I32000/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
ELECTRONIC WARFARE AGILE
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
Insufficient trajectory data for sparkline (only FY26 available).
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY26 |
|---|---|
| Request | $54.4M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — ELECTRONIC WARFARE AGILE
Electronic Warfare (EW) Agile is a part of the Department of Defense Capability Based (Agile) Funding Pilot, which provides enhanced capabilities by fostering innovation and accelerated deployment of promising technology. Funding in this portfolio will be directed towards providing enhanced tactical and strategic Signal Intelligence (SIGINT) and EW capabilities, while combating the limitations from the pace and proliferation of technological change. This is not a new start. This funding is a realignment from: (1) B97600 TERRESTRIAL LAYER SYSTEMS (TLS) / B97610 TERRESTRIAL LAYER SYSTEM BCT (2) B97600 TERRESTRIAL LAYER SYSTEMS (TLS) / B97611 TERRESTRIAL LAYER SYSTEM ECHELON ABOVE BRIGADE (3) BZ9750 MOD OF IN-SVC EQUIP (INTEL SUPPORT) / BZ9751 SPECIAL PURPOSE SYSTEMS Electronic Warfare (EW) Agile procures, equips, and trains warfighters on tactical and strategic systems with the capability to detect, identify, locate, collect/process, report, and engage (disrupt, degrade, and/or deny) hostile forces to prevent their effective use of communications and non-communications networks, counter-mortar/counter-battery radars, surveillance radars, electronically fused munitions, and other enemy threats using the Electromagnetic Spectrum (EMS). This program element also delivers upgraded capabilities to legacy systems enhancing the Army's tactical advantage in Large Scale Combat Operations (LSCO).
Justification
Justification — ELECTRONIC WARFARE AGILE
I32011 / TERRESTRIAL LAYER SYS BRIDGADE COMBAT TEAM: FY 2026 Base procurement dollars in the amount of $46.718 million funds the procurement, delivery, training, and initial sparing of TLS Manpack Systems. This is not a new start. I32011 was realigned from Budget Activity (BA) 2, B97600 TERRESTRIAL LAYER SYSTEMS (TLS) / B97610 TERRESTRIAL LAYER SYSTEM BCT in support of Agile Portfolio Management. I32012 / TERRESTRIAL LAYER SYS ECHELON ABOVE BRIGADE: FY 2026 Base procurement dollars in the amount of $1.308 million funds continued support for MDTF Operational Needs Statement (ONS). This is not a new start. I32012 was realigned from Budget Activity (BA) 2, B97600 TERRESTRIAL LAYER SYSTEMS (TLS) / B97611 TERRESTRIAL LAYER SYSTEM ECHELON ABOVE BRIGADE in support of Agile Portfolio Management. I32013 / MOD OF IN-SVC EQUIP SPECIAL PURPOSE SYSTEM: FY 2026 Base procurement dollars in the amount of $6.401 million funds productization, procurement, installation and training of capability improvements to provide Prophet Enhanced the ability to address an evolving threat signal base against modern Signals of Interest. Upgraded signal relevance capabilities are required to ensure that Prophet remains relevant against emerging and evolving threats, providing an open architecture with improved components and capabilities to address advanced signal types in a constantly contested spectrum environment. This is not a new start. I32013 was realigned from Budget Activity (BA) 2, BZ9750 MOD OF IN-SVC EQUIP (INTEL SPT) / BZ9751 Special Purpose Systems in support of Agile Portfolio Management.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY26 Disc. Request | $54.4M |
| Other Procurement, Army | A | FY26 Total | $54.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY26 Base | FY26 Request |
|---|---|---|
| Program Element | $54.4M | $54.4M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
Showing 25 of 80 from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
FY27 National Defense Authorization Act (HR 8800 / S 4784) and FY27 Department of Defense Appropriations Bill (HR…
Department of Defense Appropriations Act and National Defense Authorization Act, provisions relating to electronic…
Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…
Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…
Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…
H.R. 9495 and Senate (bill number TBD) - Department of Defense Appropriations Act, 2027, including programs related to…
H.R. 7148, Consolidated Appropriations Act, including Department of Defense Appropriations Act, 2026 (P.L. 119-75, Div.
S 2572/HR 4016 - Department of Defense Appropriations Act, 2026 including issues related to space, missile defense…
S 4874/HR 8800 - National Defense Authorization Act for Fiscal Year 2027 including issues related to aircraft…
S. 4784/H.R. 8800, FY27 Defense Authorization Act: Issues pertaining to missile defense, program management and…
S. 2296/H.R. 3838, FY26 Defense Authorization Act: Issues pertaining to missile defense, program management and…
National Defense Authorization Act for Fiscal Year 2027 (H.R. 8800, S. 4784); Department of Defense Appropriations…
National Defense Authorization Act for Fiscal Year 2026 (P.L. 119-60); National Defense Authorization Act for Fiscal…
FY26 and FY27 Budget and Appropriations Process - FY26 Department of Defense Appropriations Act (H.R.4016/S.2572)…
FY27 Budget and Appropriations Process - FY27 National Defense Authorization Act (H.R.8800/S.4784), FY27 Department of…
National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…
Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…
Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…
Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…
Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems
Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems
National Defense Authorization Act, provisions relating to electronic warfare technology. Department of Defense…
Issues relating to electronic warfare technology.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not ELECTRONIC WARFARE AGILE. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · W301
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Other Procurement - BA 3, 4 & 6 - Other Support Equipment, Initial Spares and Agile Portfolio Management · www.asafm.army.mil
PDF page 586