Bradley Program (MOD)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $2.41B
- FY26
- $157.2M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $460.4M | $2.35B | $2.41B | ||
| Enacted | – | $260.4M | $158.3M | $106.9M | |
| Request | – | – | $158.3M | $106.9M | $157.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $158.3M for FY2024; the PB2026 book reports $2.41B actually spent — $2.26B above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Bradley Program (MOD)
The Bradley Fighting Vehicle (BFV) is a fighting vehicle platform designed to transport infantry or scouts with armor protection, while providing covering fire to suppress enemy troops and armored vehicles. The primary mission area for the Bradley Fighting Vehicle is to support the mission of the Armored Brigade Combat Team (ABCT) and the ABCT mission is to fight and win engagements and battles in support of operational and strategic national objectives. The Bradley Family of Vehicles Modification line supports 3,331 Bradley vehicles across all four variants (A4E1, A4, A3, Operation Desert Storm Situational Awareness (ODS-SA)). The funding line provides for the procurement of the A4 Mobility Engineering Change Proposals (ECPs) (A4s), fleet modifications that address changes to the vehicle configurations resulting from identified safety issues, approved Engineering Change Proposals (ECPs), integration of emerging technologies, performance degradation issues, obsolescence issues, readiness, issues identified in the field and approved by the Materiel Developer and Combat Developer for fielded Bradley Family of Vehicles (FOV), and Operational Need Statements (ONS). Additionally, this line supports the personnel, engineering, design, testing, hardware procurement, fielding, and installation in support of the aforementioned items. The Bradley Program (MOD) funding line procures upgrades to the Bradley Fighting Vehicle. The Bradley A4 and associated Engineering Change Proposal (ECP) addresses space, weight, power, and cooling issues with an improved powertrain and electrical system enabling the Bradley to host inbound technologies from other Army Programs of Record, such as, but not limited to the Integrated Tactical Network (ITN). Additionally, the Bradley Program (MOD) procures training systems, and other upgrades, including but not limited to high priority improvements, survivability enhancements, increased cyber requirements and required modifications to achieve A4 Full Materiel Release, and obsolescence mitigation such as the Improved Bradley Acquisition Subsystem (IBAS 2.8), Bradley Processing unit, and common displays.
Justification
Justification — Bradley Program (MOD)
FY 2026 Base procurement dollars in the amount of $157.183 million supports procurement of multiple modifications to the Bradley Family of Vehicles, to include the procurement of training devices and procurement of safety and critical obsolescence upgrades as well as obsolescence management to identify diminishing manufacturing and material sources. Current projections indicate the Bradley Fighting Vehicle will remain in the Armored Brigade Combat Team (ABCT) formation until the 2050s. The primary effort will focus on Mod 2 (BFVS High Priority Improvements) Improved Bradley Acquisition Subsystem (IBAS) 2.8 technology refresh hardware and spares procurement with system integration activities for the Bradley Processing Unit and Common Display. Mod 2 (BFVS High Priority Improvements) maintains and provides improvements to the Bradley Family of Vehicles (FoV) to resolve problems identified in the field, improves safety, addresses obsolete components, develop and integrate modification kits, full material release efforts, and provides funding to maintain A3, A4, and A4E1 facility vehicles, vehicle software and operators/technical manuals. Mod 3 (Training Equipment Devices) funding supports for training device management for the Conduct of Fire Trainers (COFT), Hands on Turret Trainers (HOTT), Part Task Trainers (PTT) and Diagnostic Troubleshooting Trainers (DTT). These training devices are critical to developing and maintaining gunnery proficiency to keep the Bradley operational readiness rates high. Mod 5 (Program/Engineering Support) includes both government & contractor program management support to oversee program planning & procurement of Engineering Change Proposals (ECPs), conversion of Bradley configurations and industrial base mitigation. Mod 7 (BFVS Mobility Modification) funding supports continuation of Bradley A4/A4E1 fielding and production testing. A4/A4E1 fielding is identified and required through FY2030. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities.
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY24 Actuals | $2.41B |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY25 Enacted | $106.9M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Disc. Request | $157.2M |
| Procurement of Weapons and Tracked Combat Vehicles, Army | A | FY26 Total | $157.2M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $9.43B | $2.41B | $106.9M | $157.2M | $157.2M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.