Printed from https://fiscalreceipts.com/program/1500MA9160/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
BUILDING, PRE-FAB, RELOCATABLE
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $12.5M |
| FY25 | $14.6M |
| FY26 | $10.5M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $32.2M | $25.2M | $12.5M | ||
| Enacted | – | $25.2M | $31.0M | $14.6M | |
| Request | – | – | $31.0M | $27.0M | $10.5M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $31.0M for FY2024; the PB2026 book reported $12.5M as actual total obligation authority — $18.5M below the request. 12.5 − 31.0 = -18.5 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — BUILDING, PRE-FAB, RELOCATABLE
The Building, Pre-Fab, Relocatable Program (MA9160) funding line supports the relocatable building Restoration and Modernization (RM) activity and provides the capability to emplace relocatable buildings to meet emerging building requirements such as offices, armories, dining facilities, billeting, latrines, training facilities and Sensitive Compartmented Information Facilities (SCIFs). Restoration and Modernization (RM) provides resources which support Facilities Restoration, Modernization, Demolition, and Utilities Restoration & Modernization. MA9160 / BUILDING, PRE-FAB, RELOCATABLE This line emplaces and modernizes relocatable buildings in multiple locations including CONUS and OCONUS contingency locations such as Southwest Asia. U.S. CENTRAL COMMAND (USARCENT) supports Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. Overseas Operations Costs (OOC) funds this requirement in FY 2026.
Justification
Justification — BUILDING, PRE-FAB, RELOCATABLE
FY 2026 Base procurement dollars of $10.490 million in support Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. This is a decrease of $4.132 million from the FY 2025 request. The cost per item is averaged because each of the relocatable building types will have a different contract cost. The buildings are needed to provide and/or replace working and living facilities for troops in the enduring locations. Without the new buildings, troops would continue to live and work in expeditionary facilities and tents in enduring locations with exceptionally hot climates creating safety and health risks. Without the ability to replace relocatable buildings that are beyond life cycle, troops would continue to live in buildings that will become unrepairable and could expose them to potential electrical dangers.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Army | A | FY24 Actuals | $12.5M |
| Other Procurement, Army | A | FY25 Enacted | $14.6M |
| Other Procurement, Army | A | FY26 Disc. Request | $10.5M |
| Other Procurement, Army | A | FY26 Total | $10.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Request |
|---|---|---|---|---|
| Program Element | $1.14B | $12.5M | $14.6M | $10.5M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not BUILDING, PRE-FAB, RELOCATABLE. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O295
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O302
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O302
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
Other Procurement - BA 3, 4 & 6 - Other Support Equipment, Initial Spares and Agile Portfolio Management · www.asafm.army.mil
PDF page 530