BUILDING, PRE-FAB, RELOCATABLE

AProcurementPartial Reconciliation1500MA9160
What it is
BUILDING, PRE-FAB, RELOCATABLE — a procurement program run by Army.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$12.5M
FY25 Total
FY26 Request
$10.5M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $12.5MFY26: $10.5MFY24FY26
FY24
$12.5M
FY26
$10.5M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$32.2M$25.2M$12.5M
Enacted$25.2M$31.0M$14.6M
Request$31.0M$27.0M$10.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $31.0M for FY2024; the PB2026 book reports $12.5M actually spent — $18.5M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description BUILDING, PRE-FAB, RELOCATABLE

The Building, Pre-Fab, Relocatable Program (MA9160) funding line supports the relocatable building Restoration and Modernization (RM) activity and provides the capability to emplace relocatable buildings to meet emerging building requirements such as offices, armories, dining facilities, billeting, latrines, training facilities and Sensitive Compartmented Information Facilities (SCIFs). Restoration and Modernization (RM) provides resources which support Facilities Restoration, Modernization, Demolition, and Utilities Restoration & Modernization. MA9160 / BUILDING, PRE-FAB, RELOCATABLE This line emplaces and modernizes relocatable buildings in multiple locations including CONUS and OCONUS contingency locations such as Southwest Asia. U.S. CENTRAL COMMAND (USARCENT) supports Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. Overseas Operations Costs (OOC) funds this requirement in FY 2026.

Justification

Justification BUILDING, PRE-FAB, RELOCATABLE

FY 2026 Base procurement dollars of $10.490 million in support Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. This is a decrease of $4.132 million from the FY 2025 request. The cost per item is averaged because each of the relocatable building types will have a different contract cost. The buildings are needed to provide and/or replace working and living facilities for troops in the enduring locations. Without the new buildings, troops would continue to live and work in expeditionary facilities and tents in enduring locations with exceptionally hot climates creating safety and health risks. Without the ability to replace relocatable buildings that are beyond life cycle, troops would continue to live in buildings that will become unrepairable and could expose them to potential electrical dangers.

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$12.5M
Other Procurement, ArmyAFY25 Enacted$14.6M
Other Procurement, ArmyAFY26 Disc. Request$10.5M
Other Procurement, ArmyAFY26 Total$10.5M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 Request
Program Element$1.14B$12.5M$14.6M$10.5M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →