BUILDING, PRE-FAB, RELOCATABLE

ArmyProcurementReconciledBLI1500MA9160
What it is
BUILDING, PRE-FAB, RELOCATABLE (1500MA9160) is an Army procurement line funded in the Other Procurement, Army account.
What changed
-$4.13M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$12.5MP-1 TOA · PB2026
FY25 Enacted
$14.6MP-1 TOA · PB2026
FY26 Request
$10.5MP-1 TOA · PB2026
FY25→26 Change
-$4.13MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $12.5MFY25: $14.6MFY26: $10.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$12.5M
FY25$14.6M
FY26$10.5M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$32.2M$25.2M$12.5M
Enacted–$25.2M$31.0M$14.6M
Request––$31.0M$27.0M$10.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $31.0M for FY2024; the PB2026 book reported $12.5M as actual total obligation authority — $18.5M below the request. 12.5 − 31.0 = -18.5 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — BUILDING, PRE-FAB, RELOCATABLE

The Building, Pre-Fab, Relocatable Program (MA9160) funding line supports the relocatable building Restoration and Modernization (RM) activity and provides the capability to emplace relocatable buildings to meet emerging building requirements such as offices, armories, dining facilities, billeting, latrines, training facilities and Sensitive Compartmented Information Facilities (SCIFs). Restoration and Modernization (RM) provides resources which support Facilities Restoration, Modernization, Demolition, and Utilities Restoration & Modernization. MA9160 / BUILDING, PRE-FAB, RELOCATABLE This line emplaces and modernizes relocatable buildings in multiple locations including CONUS and OCONUS contingency locations such as Southwest Asia. U.S. CENTRAL COMMAND (USARCENT) supports Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. Overseas Operations Costs (OOC) funds this requirement in FY 2026.

Justification

Justification — BUILDING, PRE-FAB, RELOCATABLE

FY 2026 Base procurement dollars of $10.490 million in support Operation Spartan Shield (OSS) will procure relocatable buildings to replace and lifecycle needed facilities for modernization. These procurements include offices, armories, dining facilities, billeting and latrines in enduring locations such as Jordan, Kuwait, Qatar, and U.A.E. This is a decrease of $4.132 million from the FY 2025 request. The cost per item is averaged because each of the relocatable building types will have a different contract cost. The buildings are needed to provide and/or replace working and living facilities for troops in the enduring locations. Without the new buildings, troops would continue to live and work in expeditionary facilities and tents in enduring locations with exceptionally hot climates creating safety and health risks. Without the ability to replace relocatable buildings that are beyond life cycle, troops would continue to live in buildings that will become unrepairable and could expose them to potential electrical dangers.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, ArmyAFY24 Actuals$12.5M
Other Procurement, ArmyAFY25 Enacted$14.6M
Other Procurement, ArmyAFY26 Disc. Request$10.5M
Other Procurement, ArmyAFY26 Total$10.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 Request
Program Element$1.14B$12.5M$14.6M$10.5M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not BUILDING, PRE-FAB, RELOCATABLE. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.