Air ForceRDT&EReconciledPE1206864SF
What it is
Space Test Program (STP) (1206864SF) is an Air Force research & development line funded in the Research, Development, Test, and Evaluation, Space Force account. Its J-book detail breaks the line into 1 project.
What changed
-$1.49M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$29.1MR-1 TOA · PB2026
FY25 Total
$30.3MR-1 TOA · PB2026
FY26 Request
$28.8MR-1 TOA · PB2026
FY25→26 Change
-$1.49MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $29.1MFY25: $30.3MFY26: $28.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$29.1M
FY25$30.3M
FY26$28.8M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY19FY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$25.7M$20.2M$27.1M$29.1M
Enacted–$0$26.5M$20.9M$25.3M$30.2M$30.3M
Request––$26.5M$20.9M$25.4M$30.2M$30.3M$28.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2023 book requested $25.4M for FY2023; the PB2025 book reported $27.1M as actual total obligation authority — $1.74M above the request. 27.1 − 25.4 = 1.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Free-Flyer Spacecraft Missions

America secures peace through strength, and that strength is built on an unyielding technological edge in space - an edge forged through strategic investments in the Department of Defense's (DoD) Space Test Program (STP). As the DoD's primary gateway for space experimentation to lead to space superiority, STP is a critical enabler of national security and a direct investment in deterring adversaries like China. The DoD Space Experiments Review Board (SERB) is central to STP's mission, conducting a rigorous annual review to evaluate and prioritize space experiment proposals. After being reviewed by the SERB, STP provides these cutting-edge technologies with rapid access to the demanding environment of space, accelerating their maturation into operational capabilities. This ensures our troops maintain a decisive advantage across all domains by: • Providing Access for Rigorous Testing and Evaluation: STP enables space access to test technologies, raise Technology Readiness Levels, and validate research. • Ensuring Warfighter Relevance: Through the DoD SERB prioritization, STP focuses on space technologies with direct military applications, benefiting warfighters across all domains. • Developing Future Operational Capabilities: STP matures promising space technologies into operational systems, strengthening the United States Space Force and ensuring its advantage. • Fostering Cross-Service Collaboration and Innovation: STP, DoD's space experimentation hub, fosters cross-service/agency collaboration, aligning tech priorities and minimizing redundancy. • Maximizing Value Through Collaboration: STP partners with government, commercial, and international entities to maximize taxpayer value, broaden space access, and optimize launch opportunities. STP adheres to Executive Orders 10521 and 13185, and the requirement from the Office of the Under Secretary of Defense for Research and Engineering (OUSD (R&E)) to support research, per DoD Instruction 3210.1, Administration and Support of Basic Research. In addition, the Deputy Secretary of Defense Space Test Program Management & Funding Policy, issued in July 2002, reaffirmed STP as the primary provider of spaceflight for the DoD space research community. The July 2002 policy statement also reaffirmed STP's role as the single manager for all DoD payloads on the International Space Station (ISS). This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF. The FY 2026 request was reduced by $0.283M for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." This program is in Budget Activity 6, RDT&E Management Support because this budget activity includes research, development, test and evaluation efforts and funds to sustain and/or modernize the installations or operations required for general research, development, test and evaluation.

Justification

Accomplishments & Planned Programs (3)

Payload Integration

Integrate payloads onto spaceflight missions on the full spectrum of DoD on-orbit R&D (e.g. space vehicle, free-flyer payloads, hosted payloads, etc.). Includes acquisition of associated spacecraft and integration hardware.

Launch Vehicle and Launch Services

Purchase launch services, launch vehicles, and launch vehicle support for the full spectrum of DoD on-orbit R&D (e.g. space vehicle, free-flyer payloads, hosted payloads, etc.), enabling spaceflight worthiness and "Do No Harm" certification for Space Systems Command (SSC) and United States Space Force (USSF) HQ.

On-Orbit Satellite Operations

Execute first-year operations and operations support for STP-sponsored missions.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test, and Evaluation, Space ForceFFY24 Actuals$29.1M
Research, Development, Test, and Evaluation, Space ForceFFY25 Enacted$30.3M
Research, Development, Test, and Evaluation, Space ForceFFY25 Total$30.3M
Research, Development, Test, and Evaluation, Space ForceFFY26 Disc. Request$28.8M
Research, Development, Test, and Evaluation, Space ForceFFY26 Total$28.8M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$29.1M$30.3M$28.8M$28.8M
662617: Free-Flyer Spacecraft Missions$0$29.1M$30.3M$28.8M$28.8M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Space Test Program (STP). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.