What it is
Evolved Strategic SATCOM (ESS), budget line 1206855SF, is a U.S. Space Force research-and-development program funded in the Research, Development, Test, and Evaluation, Space Force account.
What changed
+$311.3M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 4 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$473.6MR-1 TOA · PB2026
FY25 Total
$918.6MR-1 TOA · PB2026
FY26 Request
$1.23BR-1 TOA · PB2026
FY25→26 Change
+$311.3MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $473.6MFY25: $918.6MFY26: $1.23BFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$473.6M
FY25$918.6M
FY26$1.23B

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
8 fiscal years of this program as published (FY2019–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY19FY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$69.0M$166.2M$491.5M$473.6M
Enacted–$0$71.4M$172.1M$519.0M$632.8M$918.6M
Request––$71.4M$160.1M$565.6M$632.8M$1.05B$1.23B

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $632.8M for FY2024; the PB2026 book reported $473.6M as actual total obligation authority — $159.2M below the request. 473.6 − 632.8 = -159.2 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Evolved Strategic SATCOM (ESS)

ESS is the backbone for Joint All Domain Nuclear Command, Control and Communications (NC3). The system will replace Advanced Extremely High Frequency (AEHF) Strategic Satellite Communications (SATCOM) services to provide global, integrated, survivable, resilient, and dynamic ground and satellite communications for assured strategic capabilities across the conflict continuum. The ESS program underwent a resiliency architecture shift to address emerging sophisticated threats and to ensure strategic SATCOM capabilities are available to the National Command Authority (NCA), Combatant Commanders, and joint warfighters in any potential future conflict. It will provide the only arctic DoD strategic communication capability across the joint enterprise, and will provide worldwide secure, jam-resistant communications for strategic ground, sea, and air assets. ESS will support existing strategic user terminals in all operational environments. ESS is acquired and developed in several parallel efforts to accelerate delivery of capability to warfighters by the strategic need date in FY 2032. The ESS System includes a Space Segment (ACAT-I), Ground, User, and Integration Segment (ACAT-I equiv), and a Crypto Segment (ACAT-III). The Space Segment is converting to a Major Capability Acquisition (MCA) from a Middle-Tier Acquisition (MTA) in FY 2025. The Ground Segment, also known as GRIFFON - Ground Resilient Integration & Framework for Operational NC3, is comprised of the Ground Integration and Framework (GIF), System of Systems Integration (SoSI), and Mission Software Applications. This enables a resilient and modular cybersecure architecture that bridges the gap between modern software best practices and legacy user terminal capability. The GIF/SoSI is leveraging Software Acquisition Pathway Other Transactional Authority for rapid prototyping of ground software. The ESS Ground Framework creates the cybersecure software development, integration, and operational environments utilizing agile Modular Open Systems Approach (MOSA) principles and onboards hosted external mission applications and services. The SoSI ensures all ESS segments that are acquired in parallel, in addition to external entities, work together to accomplish the mission. Additional mission-unique capabilities, like In-Band Command and Control (C2), Out-of-Band C2, Strategic Mission Planning, Test, Evaluation, Training, and other similar mission capabilities will be acquired modularly as applications that will be hosted on the ESS Ground Framework. The Crypto Segment is focused on the development, integration and testing of National Security Agency (NSA)-certified End-Cryptographic Units (ECUs) that are required for secure strategic communications encryption in the ESS payloads, bus, and test terminals. The modular acquisition approach allows the program to avoid "vendor lock” in all segments and creates opportunities for industry competition and teaming with small innovative non-traditional partners for the Ground Segment on the Space Enterprise Consortium (SpEC) Other Transactional Authority (OTA). SpEC requires ESS ground segment primary contractors that are developing software to utilize small businesses for a significant portion of the prototyping work, allowing the program to integrate innovative best practices, increase agility, reduce costs and development lifecycles, while also expanding the resilient and strategic SATCOM capabilities. The ESS system adheres to NC3 classification requirements. ESS will meet the requirements for strategic communications and capability gaps identified in the Protected Satellite Communications Services (PSCS) Analysis of Alternatives (AoA), the Protected Follow-on for Resiliency (PAFR) Study and the Strategic Tiger Team. The ESS architecture and functionality will be designed in accordance with the United States Space Command's signed ESS Concept of Operations and the Joint Requirements Oversight Council's validated Capability Development Document (CDD) satisfying the legacy Advanced Extremely High Frequency (AEHF) strategic requirements and mission performance with enhancements for increased resiliency and cybersecurity. The ESS system will satisfy emerging requirements using modular open system approaches to support incremental enhancements. This program element may include necessary civilian pay expenses required to manage, execute, and deliver ESS weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF, 1206398SF. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.

Justification

Accomplishments & Planned Programs (4)

Space Segment Prototyping

Invest in technology and demonstrations that enable continued development of a modernized, strategic payload and other key technology prototypes, risk reduction, and space segment design utilizing competitive rapid-prototyping contracts. Enables long-term return on investment through an energized Strategic SATCOM industrial base, increased competition, promotion of innovation by driving diverse designs, and increased resiliency. Actively manage contractors through prototyping, demonstration and requirements/criteria needed for contractors to competitively bid on the ESS space segment Build, Integration and Test (I&T) and Delivery follow-on.

Space Development and Production

Space Development and Production builds upon the 4+ Years of Space Segment Prototyping and delivers the next generation of NC3 Strategic SATCOM to the warfighter. The ESS Space Development and Production contract will design, develop, build, test, and deliver resilient, cybersecure space vehicles that ensure communications through all warfighting environments. This effort will initiate the non-recurring engineering for the development and production of Space Vehicles 1- 4 in order to achieve IOC by 2032 and continuing through FOC.

Ground Resilient Integration & Framework for Operational NC3 (GRIFFON)

GRIFFON is the Ground Segment solution for ESS. It includes ESS Ground Integration and Framework (GIF), SoSI, and software application development efforts. GRIFFON software applications include mission planning, command and control (both in-band and out-of-band) along with other architecture activities required to support the ESS Space Segment, system operators, strategic users, and joint Combatant Commands (COCOMs).

End-Cryptographic Unit (ECU)

Develop and deliver the NSA-certified ECUs required for secure strategic communications encryption in the ESS payloads, bus, and payload test terminals in accordance with the approved ECU acquisition strategy and schedule. Upon development completion, production ECU units will be delivered as government-furnished equipment (GFE) for integration and testing with the ESS payloads and payload test terminals.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test, and Evaluation, Space ForceFFY24 Actuals$473.6M
Research, Development, Test, and Evaluation, Space ForceFFY25 Enacted$918.6M
Research, Development, Test, and Evaluation, Space ForceFFY25 Total$918.6M
Research, Development, Test, and Evaluation, Space ForceFFY26 Disc. Request$1.23B
Research, Development, Test, and Evaluation, Space ForceFFY26 Total$1.23B

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$473.6M$918.6M$1.23B$1.23B
643725: Evolved Strategic SATCOM (ESS)$0$473.6M$918.6M$1.23B$1.23B

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the F appropriation, program element 1206855SF (Evolved Strategic SATCOM (ESS)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the F appropriation, program element 1206855SF (Evolved Strategic SATCOM (ESS)), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSFRDT&E appropriation1206855SF1.23B FY26FA880820C0047THE BOEING COMPANY424.0MThe Boeing CompanyCA-36

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
CA-36$424.0M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
THE BOEING COMPANYFA880820C0047high
LOCKHEED MARTIN CORPFA880821C0015medium
NORTHROP GRUMMAN SYSTEMS CORPORATIONFA880820C0049medium
THE BOEING COMPANYFA880820C0034medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Evolved Strategic SATCOM (ESS). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

Every sentence below carries its citation — warehouse figures open the citation panel, news claims link the cached source.

Research dossiers exist for 50 of 1,938 programs — the 50 largest fully J-book-detailed programs by FY2026 request. why no dossier here? →

What it is

  • Evolved Strategic SATCOM (ESS), budget line 1206855SF, is a U.S. Space Force research-and-development program funded in the Research, Development, Test, and Evaluation, Space Force account.
  • ESS is the backbone for Joint All Domain Nuclear Command, Control and Communications (NC3): it is designed to replace Advanced Extremely High Frequency (AEHF) strategic satellite-communications services and provide global, integrated, survivable, and resilient ground and satellite communications for the National Command Authority, Combatant Commanders, and joint warfighters.
  • The program is meant to provide the only arctic Department of Defense strategic-communication capability across the joint enterprise, offering worldwide secure, jam-resistant communications for strategic ground, sea, and air assets.
  • ESS is acquired in several parallel efforts to accelerate delivery by a strategic need date in FY 2032, comprising a Space Segment, a Ground/User/Integration Segment, and a Crypto Segment; the Space Segment is converting from a Middle-Tier Acquisition to a Major Capability Acquisition in FY 2025.
  • The Ground Segment, known as GRIFFON (Ground Resilient Integration & Framework for Operational NC3), includes the Ground Integration and Framework, System of Systems Integration, and mission software applications such as mission planning and command and control to support the ESS Space Segment, operators, strategic users, and joint Combatant Commands.
  • The Space Development and Production effort will design, develop, build, test, and deliver resilient, cybersecure space vehicles, initiating the non-recurring engineering for Space Vehicles 1 through 4 to reach Initial Operational Capability by 2032 and continue through Full Operational Capability.
  • A dedicated End-Cryptographic Unit (ECU) effort develops and delivers NSA-certified units required for secure strategic-communications encryption in the ESS payloads, bus, and payload test terminals, to be provided as government-furnished equipment.

Why it matters

  • The program's total funding grows from $918,581 thousand in FY2025 to $1,229,929 thousand (about $1.23 billion) requested for FY2026.
  • That is a year-over-year increase of $311,348 thousand (roughly $311 million) from FY2025 to FY2026.
  • In FY2024 the program recorded actual spending of $473,622 thousand (about $474 million), so the FY2026 request is more than two-and-a-half times its FY2024 execution level.
  • The entire FY2026 request of $1,229,929 thousand is discretionary funding; there is no reconciliation (mandatory) component in this program element.
  • Essentially all of the program's money flows through a single named project, Evolved Strategic SATCOM (ESS), funded at about $1,229.9 million in the FY2026 budget year.
  • The same ESS project was funded at about $918.6 million in the current year (FY2025) and about $473.6 million in the prior year (FY2024), tracing the program's steep ramp as development accelerates.
  • The FY2026 request funds Space Segment prototyping, including technology and demonstrations that enable continued development of a modernized strategic payload using competitive rapid-prototyping contracts intended to energize the strategic-SATCOM industrial base and increase competition and resiliency.

Key players

  • The program is run by the U.S. Space Force, with funding drawn from the Research, Development, Test, and Evaluation, Space Force appropriation.
  • The program's mission narrative identifies ESS as the backbone for Joint All Domain Nuclear Command, Control and Communications (NC3), serving the National Command Authority, Combatant Commanders, and joint warfighters as the replacement for AEHF strategic SATCOM services.
  • End-cryptographic units for the program are described as NSA-certified, indicating a National Security Agency role in certifying the encryption devices delivered as government-furnished equipment for the ESS payloads and payload test terminals.

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.