Polar MILSATCOM (SPACE)
Watch this program
Budget figures
No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2024. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $74.7MR-1 TOA · PB2026 |
| FY25 | $0J-book detail · PB2026 |
| FY26 | $0J-book detail · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 |
|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $123.5M | $79.6M | $65.0M | $74.7M |
| Enacted | – | $0 | $190.2M | $112.2M | $67.2M | $73.8M |
| Request | – | – | $190.2M | $127.9M | $67.5M | $73.8M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2021 book requested $190.2M for FY2021; the PB2023 book reported $123.5M as actual total obligation authority — $66.7M below the request. 123.5 − 190.2 = -66.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — EPS Recap
This program element acquires the Polar Military Satellite Communications (MILSATCOM) system that provides protected communications (anti-jam and low probability of intercept and detection) for users in the North Polar Region. In FY 2006, the Department of Defense (DoD) began funding Enhanced Polar System (EPS). The host spacecraft and the polar communications packages took advantage of the Advanced Extremely High Frequency (AEHF) technology including the extended Data Rate (XDR) waveform. The EPS Capability Development Document (CDD), approved by the Joint Requirements Oversight Council in September 2006, is based on a two-package, hosted XDR program with operational availability in CY 2015 and CY 2017. EPS is comprised of four segments: Payload, Ground Control, Gateway, and Terminal (acquired by each Service's Terminal Program Office). Milestone B review was completed April 2, 2014. In FY 2019, the United States Air Force (USAF) and Norwegian Ministry of Defense signed the Arctic Memorandum of Agreement (MOA), which enforces the international collaboration with Norway to host two EPS-Recapitalization (EPS-R) payloads on Space Norway-procured spacecraft. EPS-R developed and acquired two Extremely High Frequency (EHF) payloads that are hosted on Space Norway-procured spacecraft and to upgrade/modify the existing EPS Ground Control and Gateway. This program element may include necessary civilian pay expenses required to manage, execute, and deliver Polar MILSATCOM weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 1206392SF and 1206398SF. This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full rate production.
Justification
Accomplishments & Planned Programs (3)
Space Segment
Develop and acquire two EHF payloads, using AEHF's XDR waveform, for integration on host spacecraft.
Ground Updates
Modify and upgrade the existing EPS Control and Planning Segment (CAPS) to provide command and control and XDR mission planning capability for the two new payloads.
Gateway Updates
Modify and upgrade the existing EPS Gateway to support the two new payloads.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test, and Evaluation, Space Force | F | FY24 Actuals | $74.7M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $250.9M | $74.7M | $0 | $0 | $0 |
| 654215: EPS Recap | $250.9M | $74.7M | $0 | $0 | $0 |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| VA-11 | $119.8M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| NORTHROP GRUMMAN SYSTEMS CORPORATION | FA880819C0004 | high |
| TECOLOTE RESEARCH, INC. | FA881120F0001 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Polar MILSATCOM (SPACE). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J807
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J846
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J813
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J777
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J768
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J788
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Space Force Research and Development Test and Evaluation · www.saffm.hq.af.mil
PDF page 431