What it is
Ship Maintenance, Repair and Modernization (budget line 1000) is a U.S. Navy procurement line funded in the Other Procurement, Navy appropriation.
What changed
+$430.0K FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$2.84BP-1 TOA · PB2026
FY25 Enacted
$2.39BP-1 TOA · PB2026
FY26 Request
$2.39BP-1 TOA · PB2026
FY25→26 Change
+$430.0KP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $2.84BFY25: $2.39BFY26: $2.39BFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$2.84B
FY25$2.39B
FY26$2.39B

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$1.31B$1.64B$2.84B
Enacted–$1.64B$2.75B$2.39B
Request––$2.75B$2.39B$2.39B

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $2.75B for FY2024; the PB2026 book reported $2.84B as actual total obligation authority — $92.9M above the request. 2,839.2 − 2,746.3 = 92.9 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Ship Maintenance, Repair and Modernization

Division A of the Consolidated Appropriations Act, 2020, Public Law 116-93 appropriated funding in Other Procurement, Navy (OPN) to initiate a program funding private contracted ship maintenance in the U.S. Pacific Fleet (CPF) in Fiscal Year (FY) 2020. Division C of the Consolidated Appropriations Act, 2021 continued this program in the U.S. Pacific Fleet, and Division C of the Consolidated Appropriations Act, 2022 expanded the program to include both U.S. Pacific Fleet and U.S. Fleet Forces (FFC). FY 2026 funds $2.4B for Continental United Status (CONUS) private contracted surface and submarine maintenance in both U.S. Pacific Fleet (CPF) and U.S. Fleet Forces Command (FFC). Funding private contracted ship maintenance planned for CPF and FFC with OPN allows the Navy to implement commercial best practices for ship maintenance and achieve Navy's A-120 contracting policy. It provides more flexibility to extend contract lead times, enables the Navy to address emergent repair requirements, and strengthens industry partnerships. The program continues to provide stability and financial efficiency to its industry partners, and continues the more stringent fiscal discipline demonstrated in the execution of the program. The Navy remains committed and motivated to utilizing this program to improve both the execution of depot-level maintenance and the overall readiness posture of the U.S. Navy's maritime forces. AVAILABILITIES DEFINITIONS: CIA (Carrier Incremental Availability): An availability for continuous accomplishment of depot maintenance and selected modernization on CVN 68 class aircraft carriers. DMP (Depot Modernization Period): An availability scheduled primarily for the installation of major high priority warfare improvement alterations. DPIA (Docking Planned Incremental Availability): A labor-intensive availability, of less than one year duration, for aircraft carriers in an Incremental Maintenance Plan. Maintenance and modernization are accomplished. Aircraft carriers assigned to Incremental Maintenance Plans are maintained through CIA's, PIAs and DPIAs in lieu of overhauls. DPMA (Docking Phased Maintenance Availability): A PMA expanded to include maintenance and modernization that require dry-docking. DSRA(Docking Selected Restricted Availabilities): An SRA expanded to include maintenance and modernization that require dry-docking. EDPMA (Extended Docking Phased Maintenance Availability): A DPMA expanded to include maintenance and modernization that cannot be accomplished in a DPMA. EDSRA (Extended Docking Selected Restricted Availability): A DSRA expanded to include maintenance and modernization that cannot be accomplished in a DSRA. ERP (Extended Refit Period): Selected Restricted Availability with short docking inspection period EOH (Engineered Overhaul): Overhaul availabilities of nuclear powered submarines during which the reactor is not refueled. ERO (Engineered Refueling Overhaul): Overhaul major maintenance availabilities of different nuclear powered submarine classes during which the reactor is also refueled. MMP (Major Maintenance Period): An onsite non-CNO availability for SSGNs for the accomplishment of maintenance and modernization. OH (Overhaul): A major availability normally exceeding 6-months duration for the accomplishment of maintenance and modernization. PIA (Planned Incremental Availability): A labor-intensive availability, of less than 6 months duration, for aircraft carriers in an Incremental Maintenance Plan. Maintenance and modernization are accomplished. Aircraft carriers assigned to Incremental Maintenance Plans are maintained through CIA's, PIAs and DPIAs in lieu of overhauls. PIRA (Pre-Inactivation Restricted Availability): A hull specific availability assigned to establish a final, abbreviated OPCYCLE prior to inactivation. P-MA (Phased Maintenance Availability): A short labor- intensive availability for ships in a Phased Maintenance Program for the accomplishment of maintenance and modernization. Ships assigned to Phased Maintenance Programs are maintained through PMAs in lieu of overhauls. RA/TA (Restricted/Technical Availability): RA/TA is used to provide depot level support and maintenance (ie. Combat Systems, Habitability, Calibration, Ship Engineering material assessment, Nuclear Regional Maintenance Facilities) SCO (Service Craft Overhaul): A major industrial availability for the accomplishment of maintenance and modernization on service craft. SRA (Selected Restricted Availability): A short labor- intensive industrial period assigned to ships in Progressive or Engineered Operating Cycle Maintenance Programs for the accomplishment of maintenance and selected modernization. Ships assigned to Progressive Maintenance Programs are maintained through SRAs in lieu of overhauls.

Justification

Justification — Ship Maintenance, Repair and Modernization

The FY 2026 request was reduced by $163.538 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." FY 2026 requests $2.4 Billion for U.S. Pacific Fleet and U.S. Fleet Forces to continue private contracted ship maintenance. Funding for ship maintenance Overhauls (OH) to Restricted/Technical Availabilities (RA/TA) performed at private shipyards. Ship overhauls restore the ship, including all operating systems that affect safety or combat capability, to established performance standards.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$2.84B
Other Procurement, NavyNFY25 Enacted$2.39B
Other Procurement, NavyNFY26 Disc. Request$2.39B
Other Procurement, NavyNFY26 Total$2.39B

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$4.85B$2.84B$2.39B$2.39B$2.39B

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 1000 (Ship Maintenance, Repair and Modernization), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 1000 (Ship Maintenance, Repair and Modernization), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation10002.39B FY26N0002416C4306METRO MACHINE CORP.447.6MGeneral Dynamics CorpVA-03

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
VA-03$435.5M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
METRO MACHINE CORP.N0002416C4306high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

Showing 25 of 48 from the Senate LDA disclosure database.

FEDEX CORPORATIONRepair|Modernization2026matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Modernization2026matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…

GENERAL DYNAMICSRepair|Modernization2026matched 2+ title words

The FY2027 National Defense Authorization Act (No Bill Number): issues related to shipbuilding, ship repair, Army…

GENERAL DYNAMICSRepair|Modernization2026matched 2+ title words

The FY2027 National Defense Authorization Act (H.R.8800/S.4784): issues related to shipbuilding, ship repair, Army…

GENERAL DYNAMICS CORPRepair|Modernization2026matched 2+ title words

Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (bill numbers not yet assigned); FY27…

GENERAL DYNAMICS CORPRepair|Modernization2026matched 2+ title words

Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (HR 9495 / Senate bill number not yet…

INTERNATIONAL ASSOCIATION OF MACHINISTS AND AEROSPACE WORKERSMaintenance|Repair|Modernization2026matched 2+ title words

Support IAM Programs (F-35, F-15, C-130, DDG-51, VA subs, F-135) in FY 2027 Appropriations H.R. 4016 Support IAM…

INTERNATIONAL ASSOCIATION OF MACHINISTS AND AEROSPACE WORKERSMaintenance|Repair|Modernization2026matched 2+ title words

Support IAM Programs (F-35, F-15, C-130, DDG-51, VA subs, F-135) in FY 2027 Appropriations H.R. 4016 Support IAM…

BAE SYSTEMS INCMaintenance|Repair2025matched 2+ title words

Shipbuilding and Harbor Infrastructure for Prosperity and Security (SHIPS) for America Act of 2025 (HR 3151/S 1541)…

BAE SYSTEMS INCMaintenance|Repair2025matched 2+ title words

Shipbuilding and Harbor Infrastructure for Prosperity and Security (SHIPS) for America Act of 2025 (HR 3151/S 1541)…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI. H.R.1566 - REPAIR Act. H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI. H.R.1566 - REPAIR Act. H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI H.R.1566 - REPAIR Act H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI. H.R.1566 - REPAIR Act. H.R.1664/S.1492…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI. H.R.1566 - REPAIR Act. General…

FEDEX CORPORATIONRepair|Modernization2025matched 2+ title words

Legislative monitoring of consumer privacy issues, vehicle data issues, and AI. H.R.1566 - REPAIR Act. H.R.1664/S.1492…

GENERAL DYNAMICSRepair|Modernization2025matched 2+ title words

The FY2026 National Defense Authorization Act (H.R.3838/S.2296): issues related to shipbuilding, ship repair, Army…

GENERAL DYNAMICSRepair|Modernization2025matched 2+ title words

The FY2026 National Defense Authorization Act (H.R.3838/S.2296): issues related to shipbuilding, ship repair, Army…

GENERAL DYNAMICSRepair|Modernization2025matched 2+ title words

The FY2026 National Defense Authorization Act (H.R.3838/S.2296): issues related to shipbuilding, ship repair, Army…

GENERAL DYNAMICSRepair|Modernization2025matched 2+ title words

The FY2026 National Defense Authorization Act (No Bill Number): issues related to shipbuilding ship repair, Army…

GENERAL DYNAMICS CORPRepair|Modernization2025matched 2+ title words

Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…

GENERAL DYNAMICS CORPRepair|Modernization2025matched 2+ title words

FY26 Department of Defense Appropriations and Authorization issues and funding included but are not limited to…

GENERAL DYNAMICS CORPRepair|Modernization2025matched 2+ title words

Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…

GENERAL DYNAMICS CORPRepair|Modernization2025matched 2+ title words

Issues and funding related to Fiscal Year 2026 (FY26) Defense Appropriations (HR 4016 / S 2572); FY26 Homeland…

INTERNATIONAL ASSOCIATION OF MACHINISTS AND AEROSPACE WORKERSMaintenance|Repair|Modernization2025matched 2+ title words

Support IAM Programs in FY 2026 Appropriation (F-35, F-15, C-130, DDG-51, VA Subs) H.R. 4016 Support Workers at Ft.…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ship Maintenance, Repair and Modernization. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

Every sentence below carries its citation — warehouse figures open the citation panel, news claims link the cached source.

Research dossiers exist for 50 of 1,938 programs — the 50 largest fully J-book-detailed programs by FY2026 request. why no dossier here? →

Correction

5 claims removed: they cited sources the site could not resolve.

What it is

  • Ship Maintenance, Repair and Modernization (budget line 1000) is a U.S. Navy procurement line funded in the Other Procurement, Navy appropriation.

Why it matters

  • The program's total funding is $2,392,620 thousand (about $2.39 billion) requested for FY 2026.
  • In FY 2024 the program recorded actual spending of $2,839,179 thousand (about $2.84 billion), so the FY 2026 request is somewhat below its recent execution level.
  • The entire FY 2026 request is discretionary: the P-1 exhibit shows a $2,392,620 thousand discretionary request and no reconciliation (mandatory) request.
  • The FY 2026 request of about $2,392.6 million is essentially flat against the current-year enacted level of about $2,392.2 million.

Key players

  • The program is run by the U.S. Navy, with funding drawn from the Other Procurement, Navy appropriation.

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.