Chemical Warfare Detectors (0989) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
-$635.0K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$3.29MP-1 TOA · PB2026
FY25 Enacted
$3.25MP-1 TOA · PB2026
FY26 Request
$2.62MP-1 TOA · PB2026
0.5% reconciliation

$2.61M discretionary + $12.0K one-time reconciliation. Discretionary change vs FY2025 enacted: -19.9%.

FY25→26 Change
-$635.0KP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $2.62M TOA − $2.61M J-book line = 12.0K (2.6 − 2.6 = 0.0) — $12.0K of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $3.29MFY25: $3.25MFY26: $2.62MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$3.29M
FY25$3.25M
FY26$2.62M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$2.43M$3.20M$3.29M
Enacted–$3.20M$3.29M$3.25M
Request––$3.29M$3.25M$2.62M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $3.29M for FY2024; the PB2026 book reported $3.29M as actual total obligation authority — $2.00K below the request. 3.3 − 3.3 = -0.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Chemical Warfare Detectors

The Joint Chemical and Biological Defense Program (CBDP) funds the development and procurement of Chemical and Biological Defense (CBD) Equipment to enhance the warfighter's ability to survive and complete their mission in a chemical biological contaminated environment. The Navy is responsible for the associated installation/integration and sustainment funds only. The Navy's requirement for Joint Biological Agent Identification and Diagnostic System (JBAIDS), Aerosol Vapor Chemical Agent Detector (AVCAD), and Enhanced Maritime Biological Detection (EMBD) system has been validated by the Chief of Naval Operations in associated Joint Operational Requirements Documents and Capability Production Documents. The inventory objective for EMBD upgrades was revised rom one-hundred ten (110) to one-hundred fourteen (114) due to adding four LCS class ships because planned decommissioning has been delayed which allowed time to install the system upgrade. [P3A - 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT]: CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT: The Enhanced Maritime Biological Detection (EMBD) kit is intended as a lifecycle replacement for the Joint Biological Point Detection System (JBPDS), and will include improved detection and identification capabilities. The equipment procurement is funded out of the Joint Service Chemical Biological Defense Program Budget. The inventory objective for shipboard installations is 114.

Justification

Justification — Chemical Warfare Detectors

The FY 2026 request for CBD includes $2,607 thousand of discretionary and $12 thousand of mandatory (reconciliation) for a total of $2,619 thousand. The mandatory funds [brief description of content funded by mandatory funds]. Further information for this reconciliation request is provided in Section 200010 (Readiness) of the Reconciliation Exhibit. FY 2026 discretionary funding is for installation of equipment including Fleet Modernization Program installations, installation of training equipment, installation of equipment in other shore facilities, and associated required new equipment training. Procurement of equipment is funded by the Joint Service CBDP. Costs can vary significantly, even within ship class, depending on installation location (East coast, West coast, overseas, etc.), if installation accomplished pier side or in a shipyard (i.e., availability type during which installation actually occurs), ship as built and as found conditions, and installation growth work (i.e., unplanned/unexpected work) driven by as found conditions. The FY 2026 request was reduced by $.661 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$3.29M
Other Procurement, NavyNFY25 Enacted$3.25M
Other Procurement, NavyNFY26 Disc. Request$2.61M
Other Procurement, NavyNFY26 Reconciliation$12.0K
Other Procurement, NavyNFY26 Total$2.62M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$11.1M$3.29M$3.25M$2.61M$2.61M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Chemical Warfare Detectors. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.