Printed from https://fiscalreceipts.com/program/0989/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Chemical Warfare Detectors
Budget figures
$2.61M discretionary + $12.0K one-time reconciliation. Discretionary change vs FY2025 enacted: -19.9%.
Two official figures, one label— reconciled below
Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →
FY26 Request · $2.62M TOA − $2.61M J-book line = 12.0K (2.6 − 2.6 = 0.0) — $12.0K of one-time FY2026 reconciliation money accounts for this gap — not advance procurement
Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $3.29M |
| FY25 | $3.25M |
| FY26 | $2.62M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $2.43M | $3.20M | $3.29M | ||
| Enacted | – | $3.20M | $3.29M | $3.25M | |
| Request | – | – | $3.29M | $3.25M | $2.62M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $3.29M for FY2024; the PB2026 book reported $3.29M as actual total obligation authority — $2.00K below the request. 3.3 − 3.3 = -0.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Chemical Warfare Detectors
The Joint Chemical and Biological Defense Program (CBDP) funds the development and procurement of Chemical and Biological Defense (CBD) Equipment to enhance the warfighter's ability to survive and complete their mission in a chemical biological contaminated environment. The Navy is responsible for the associated installation/integration and sustainment funds only. The Navy's requirement for Joint Biological Agent Identification and Diagnostic System (JBAIDS), Aerosol Vapor Chemical Agent Detector (AVCAD), and Enhanced Maritime Biological Detection (EMBD) system has been validated by the Chief of Naval Operations in associated Joint Operational Requirements Documents and Capability Production Documents. The inventory objective for EMBD upgrades was revised rom one-hundred ten (110) to one-hundred fourteen (114) due to adding four LCS class ships because planned decommissioning has been delayed which allowed time to install the system upgrade. [P3A - 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT]: CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT: The Enhanced Maritime Biological Detection (EMBD) kit is intended as a lifecycle replacement for the Joint Biological Point Detection System (JBPDS), and will include improved detection and identification capabilities. The equipment procurement is funded out of the Joint Service Chemical Biological Defense Program Budget. The inventory objective for shipboard installations is 114.
Justification
Justification — Chemical Warfare Detectors
The FY 2026 request for CBD includes $2,607 thousand of discretionary and $12 thousand of mandatory (reconciliation) for a total of $2,619 thousand. The mandatory funds [brief description of content funded by mandatory funds]. Further information for this reconciliation request is provided in Section 200010 (Readiness) of the Reconciliation Exhibit. FY 2026 discretionary funding is for installation of equipment including Fleet Modernization Program installations, installation of training equipment, installation of equipment in other shore facilities, and associated required new equipment training. Procurement of equipment is funded by the Joint Service CBDP. Costs can vary significantly, even within ship class, depending on installation location (East coast, West coast, overseas, etc.), if installation accomplished pier side or in a shipyard (i.e., availability type during which installation actually occurs), ship as built and as found conditions, and installation growth work (i.e., unplanned/unexpected work) driven by as found conditions. The FY 2026 request was reduced by $.661 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $3.29M |
| Other Procurement, Navy | N | FY25 Enacted | $3.25M |
| Other Procurement, Navy | N | FY26 Disc. Request | $2.61M |
| Other Procurement, Navy | N | FY26 Reconciliation | $12.0K |
| Other Procurement, Navy | N | FY26 Total | $2.62M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $11.1M | $3.29M | $3.25M | $2.61M | $2.61M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Chemical Warfare Detectors. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O646
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O631
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O659
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.