Printed from https://fiscalreceipts.com/program/0977/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Underwater EOD Equipment
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $19.5M |
| FY25 | $16.6M |
| FY26 | $22.4M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $24.1M | $35.4M | $19.5M | ||
| Enacted | – | $35.4M | $19.5M | $16.6M | |
| Request | – | – | $19.5M | $16.6M | $22.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $19.5M for FY2024; the PB2026 book reported $19.5M as actual total obligation authority — $13.0K below the request. 19.5 − 19.5 = -0.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — Underwater EOD Equipment
Underwater Explosive Ordnance Disposal (EOD) program supplies EOD and maritime expeditionary forces with the necessary allowance outfitting, and diving and diving-related equipment aligned to fulfill assigned missions that includes Expeditionary Mine Countermeasures (ExMCM), and other maritime expeditionary missions. Most equipment must have inherently low acoustic and magnetic signatures to support maritime operations in the vicinity of influence fired ordnance. This funding supports outfitting the Navy's only comprehensive capability that can conduct full spectrum detect-to-engage ExMCM missions. Specifically, the (EOD) program supports EOD units worldwide as well as Mobile Diving and Salvage Units (MDSUs) and Naval Construction Forces (NCF) across the globe. The nature of the missions assigned to EOD and MCM forces under OPNAVINST 3501.97, Required Operational Capabilities & Projected Operational Environments (ROC/POE), require an aggregated set of systems and equipment to perform the wide range of mine countermeasures, underwater detection, location, investigation, force protection, exploitation, and neutralization tasks that comprise the mission set. The requirements for the procurement of each of these system suites are articulated in OPNAV approved requirements documents in accordance with DoD Directive 5000.2, SECNAVINST 5000.2, and the JCIDS process as defined by CJSCINST 3170.01 and defined by the JROC approved ExMCM ICD.
Justification
Justification — Underwater EOD Equipment
The FY 2026 request was reduced by $0.374 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative." FY 2026 funding is required to continue procurement and fielding of Underwater EOD program systems and equipment to outfit ExMCM Companies, EOD Units, MDSUs, and NCFs with advanced sensors and hardware required to accomplish their OPNAV approved missions. This equipment will allow warfighters to detect, locate, neutralize, and render safe unexploded ordnance including improvised explosive devices; conduct expeditionary salvage; and underwater construction missions. FY 2026 funding continues procurement of Maritime Expeditionary Standoff Response (MESR) Payload Kits and MESR Platforms. -CE 4.1.3 MK16 MOD 1 Product Improvement Program (PIP) also known as the MK16 MOD 3: OPNAV N957 direction to upgrade the fielded inventory of MK16 MOD 1 UBAs to MOD 3 UBAs and procure and upgrade additional UBAs as necessary to meet the inventory objective of 468. Inventory objective will be met by converting the existing fleet inventory of 357 MK16 MOD 1s to MK16 MOD 3s and procurement of 55 MK16 MOD 3 units FY 2026 and 56 units in FY 2027. An additional 52 spare conversion kits will also be procured. Additionally, this line enables production engineering and integrated logistics support needed for all ExMCM Companies, EOD Units, MDSUs, and NCFs. These systems provide the only ExMCM capability in the US Navy. If not properly outfitted, these EOD forces will not be able to detect, locate, neutralize, and render safe underwater ordnance, sea mines, and other explosive hazards, which will significantly degrade Fleet Maneuver against near peer adversaries. Specifically, this procures the next generation of Advanced Diver Integrated Sensors (STRIDENT), significantly increasing EOD diver capability to neutralize, destroy, or recover undersea mines. The below systems show an increase from FY25 to FY26 procurement quantities to meet validated Fleet inventory objectives, as outlined in approved buy plans. -CE 2.1.2 ADVANCED DIVER INTEGRATION SENSORS -CE 2.1.6 MESR PAYLOAD KITS Sensors -CE 2.1.7 MESR PAYLOAD KITS Kinetic Effects -CE 2.1.8 MESR PAYLOAD KITS C3 Modules -CE 2.1.9 MESR Platforms
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $19.5M |
| Other Procurement, Navy | N | FY25 Enacted | $16.6M |
| Other Procurement, Navy | N | FY26 Disc. Request | $22.4M |
| Other Procurement, Navy | N | FY26 Total | $22.4M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $260.6M | $19.5M | $16.6M | $22.4M | $22.4M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Underwater EOD Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O644
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O629
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O657
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.