What it is
LCAC (0970) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
+$9.31M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$10.2MP-1 TOA · PB2026
FY25 Enacted
$11.0MP-1 TOA · PB2026
FY26 Request
$20.3MP-1 TOA · PB2026
100.0% reconciliation

$20.3M one-time reconciliation. Discretionary change vs FY2025 enacted: -100.0%.

FY25→26 Change
+$9.31MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $20.3M TOA − $0 J-book line (a zero-dollar XML line) = 20.3M (20.3 − 0.0 = 20.3) — $20.3M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $10.2MFY25: $11.0MFY26: $20.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$10.2M
FY25$11.0M
FY26$20.3M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$21.3M$17.5M$10.2M
Enacted–$17.5M$10.8M$11.0M
Request––$10.8M$11.0M$20.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $10.8M for FY2024; the PB2026 book reported $10.2M as actual total obligation authority — $555.0K below the request. 10.2 − 10.8 = -0.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — LCAC

The LCAC (Landing Craft, Air Cushion), which consists of both the legacy and LCAC 100 classes of craft, mission is to transport weapons systems, equipment, cargo, and personnel of the assault elements for the Marine Air/Ground Task Force from ship to shore and across the beach. The LCAC rides on a cushion of air contained in a flexible skirt and is propelled by two aft-mounted, reversible, variable pitch propellers. It is capable of speeds in excess of 40 knots. The LCAC sustainment funding is programmed for equipment procurement using OPN to replace selected engines, Personnel Transport Modules and other equipment that the fleet urgently requires to maintain acceptable levels of readiness. LC001 - LCAC SYSTEM UPGRADES The LCAC System Upgrade Program provides procurement and installation of components required to maintain acceptable levels of fleet operational readiness. LCAC System Upgrade Program will also provide materials to support systems upgrades. Equipment removal and installation will take place at Assault Craft Unit FOUR (ACU 4), ACU 5 and Naval Beach Unit SEVEN (NBU 7). Specific items procured vary from year to year based on Fleet needs; these items include but are not limited to C4N upgrades and deep skirt replacements. LC002 - ENGINES The ETF-40B engines are enhanced versions of the current TF-40B engines and are installed on Service Life Extension Program (SLEP) craft. Catastrophic engine failures have highlighted the need for spare engines to reduce operational downtime. Engine procurements are also for Pack Up Kits (PUKs) that accompany fleet deployment of LCACs aboard amphibious ships. Additional ETF-40B Engines will be needed to meet operational needs. LC007 - LIGHTWEIGHT ARMOR The portable lightweight armor system replaces the existing armor system. The portable system can be transported via a Container Express (CONEX) box and provides the fleet ballistic/fragmentation protection to manned spaces on the craft as well as to selected machinery components. LC008 - COLD WEATHER KITS LCAC requires to be capable of operating in temperature ranges from 10 degrees Fahrenheit to 100 degrees Fahrenheit. In order to operate in weather conditions below 50 degrees Fahrenheit, a cold weather kit is required. Snow and ice accumulation leads to actuation of a safety system that bypasses the main engine inlet air filtration system and allows engines to draw in unfiltered air. Cold weather kits prevent snow and ice accumulation in the main engines during cold weather operations keeping the craft operational during deployments. LC009 - PERSONNEL TRANSPORT MODULE The Personnel Transport Module (PTM) provides the capability of the Landing Craft Air Cushion (LCAC) to transport personnel and protect occupants from the elements inherent in an amphibious environment. LC010 - LCAC 100 CLASS MAJOR SHORE BASED SPARES (Ship to Shore Connector, SSC) Major Shore Based Spares (MSBS) Spares to be procured beginning in FY22 include major equipment with long lead times including such items as Engines, Skirts, Composites, Auxiliary Power Units, Propellers, Bow and Stern Ramps, Gearboxes, Lift Fan Impellers, and Fuel Pump & Metering Units. First craft arrived at the ACU 4 in FY22. LC011 - TRAINER SYSTEM UPGRADES AND MODERNIZATION Upgrade / modernization of the LCAC Full Motion Trainer (FMT), which provides essential training for the Operator, Engineer, Navigator, and Group Commander of the LCAC, in the complex skills required for the safe operation of the LCAC in both normal and casualty mode.

Justification

Justification — LCAC

The FY 2026 request for LCAC includes $0 thousand in discretionary and $20,321 thousand of mandatory (reconciliation) for a total of $20,321 thousand. The mandatory funds fund the procurement of Major Shore Based Spares (MSBS) for LCAC 100 class craft. Further information for this reconciliation request is provided in Sections 20002 (Shipbuilding) and 200010 (Readiness) of the Reconciliation Exhibit. The FY 2026 request was reduced by $1.690 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$10.2M
Other Procurement, NavyNFY25 Enacted$11.0M
Other Procurement, NavyNFY26 Reconciliation$20.3M
Other Procurement, NavyNFY26 Total$20.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$176.7M$10.2M$11.0M$0$0

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LCAC. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.