Skip to content
Fiscal Receipts

DSSP Equipment

NavyProcurementReconciledBLI0955
What it is
DSSP Equipment (0955) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
+$1.26M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$4.62MP-1 TOA · PB2026
FY25 Enacted
$4.59MP-1 TOA · PB2026
FY26 Request
$5.85MP-1 TOA · PB2026
FY25→26 Change
+$1.26MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $4.62MFY25: $4.59MFY26: $5.85MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$4.62M
FY25$4.59M
FY26$5.85M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$3.28M$3.66M$4.62M
Enacted–$3.66M$4.62M$4.59M
Request––$4.62M$4.59M$5.85M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $4.62M for FY2024; the PB2026 book reported $4.62M as actual total obligation authority — $3.00K below the request. 4.6 − 4.6 = -0.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Deep Subm Sys Proj (DSSP) Equip

The Undersea Special Mission Systems Program, formerly Deep Submergence Systems Program (DSSP), is responsible for the procurement, life cycle support, improvement and modernization of assigned platforms and programs. The Undersea Special Missions Systems Program provides for the procurement of equipment to support the establishment and maintenance of fleet capability for a number of programs which perform submarine rescue, escape, search, inspection, and object location and retrieval from the ocean environment. Submarine escape and rescue procurements replace obsolete, non-supportable equipment and subsystems through phased improvement and modernization projects. These projects may include special ship alterations, field change kits, and design corrections. FY2026 funding provides modernization of special mission systems to include the Navy's only Submarine Rescue System (SRS) assets. Modernization of SRS is required to address known reliability and obsolescence issues and support the planned minimum 15 year system service life extension prior to SRS's end of life and inoperability. SOURCES: The sources for these acquisitions are limited. There are few private companies actively engaged in deep ocean engineering and even fewer with the specialized certifications, experience, knowledge, and facilities to meet the exacting requirements of submarine escape and rescue. Accordingly, sole source contracts are sometimes required; however, where possible, contracting via open competition is utilized. [P40A / HJ030 - RESCUE SUPPORT EQUIPMENT]: INTERVENTION SYSTEMS (REMOTELY OPERATED VEHICLE (ROV)/SRS/SUBMARINE RESCUE CHAMBER (SRC) Intervention assets (ROV) are required to support the SRS and SRC world-wide rescue capability mission. Intervention assets are used to clear disabled submarine's seating surfaces, attach the SRC downhaul cable, attach salvage fittings, deliver emergency life support stores, and assess distressed submarines. The ROV is an unmanned system that reduces operational risk from the previous Intervention Assets that were a manned system, Atmospheric Diving System (ADS); transition from ADS to ROV has occurred and is in-service. SRC provides shallow water un-pressurized rescue capability. SRS is the deep water pressurized rescue ready system for the U.S. Navy. SRS was delivered in increments; the Submarine Rescue System-Rescue Capable System (SRS-RCS) completed OPEVAL in FY08, and the final component of SRS was the Transfer Under Pressure (TUP) or Submarine Rescue System-Submarine Decompression System (SRS-SDS) which has been delivered and completed Initial Operating Capability (IOC)/Final Operating Capability (FOC) in FY2019.

Justification

Justification — Deep Subm Sys Proj (DSSP) Equip

FY 2026 funding is to continue the U.S. Submarine Rescue System (SRS) modernization and upgrade. Funding levels required in order to meet fleet wholeness requirements for resiliency related to submarine rescue system critical items, sparing, and operational availability and crucial field changes. FY2026 increase over FY2025 supports scheduled procurement of those technologies and subsystems developed in previous years that support the modernization of SRS, to include the procurement and implementation of condition-based maintenance into the system to increase operational availability. Navy added these additional resources to provide a credible SRS for our sailors and ally partner nations. The FY 2026 request was reduced by $.007 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$4.62M
Other Procurement, NavyNFY25 Enacted$4.59M
Other Procurement, NavyNFY26 Disc. Request$5.85M
Other Procurement, NavyNFY26 Total$5.85M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$64.4M$4.62M$4.59M$5.85M$5.85M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not DSSP Equipment. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.