Skip to content
Fiscal Receipts

LPD Class Support Equipment

NProcurementPartial Reconciliation0946
What it is
LPD Class Support Equipment — a procurement program run by Navy.
What changed
No FY25→26 comparison — trajectory data incomplete for this line.
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$80.9M
FY25 Total
FY26 Request
$125.5M
FY25→26 Change

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $80.9MFY26: $125.5MFY24FY26
FY24
$80.9M
FY26
$125.5M
Decade view — each figure cites its own President's Budget edition
FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY22FY23FY24FY25FY26
Actuals$22.1M$53.4M$80.9M
Enacted$53.4M$91.9M$38.1M
Request$91.9M$38.1M$125.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $91.9M for FY2024; the PB2026 book reports $80.9M actually spent — $11.0M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description LPD Class Support Equipment

This budget provides funding for the in service LPD 17 class program support equipment. Previous funding for LPD 17 class support equipment (FY 2012 and earlier) was provided under line item 0981, Items Less Than $5 Million. Funding is required to upgrade mission critical electronics and Hull Mechanical & Engineering (HM&E) systems including the Engineering Control Systems (ECS), Ship Control Systems (SCS), Degaussing Systems, Shipboard Wide-Area Network (SWAN), commercial software products for ECS, SCS, Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) and Administrative Communications. Ship Installation Drawings (SIDs) funding and tasking are now required at A-2 years of CNO availability start date, vice A-1 years. [P40A / CJ010 - Schoolhouse TTE]: CJ010 - SCHOOLHOUSE TTE Funding for Schoolhouse Technical Training Equipment (TTE) is for the infrastructure and equipment to set up the schoolhouses for multiple systems such as ECS and SCS 60Hz and Ship Service Diesel Generators (SSDG). The schoolhouses will provide critical training to sailors in operation and maintenance of those systems. [P40A / CJ020 - Shore Based Spares]: CJ020 SHORE BASED SPARES Shore-Based Spares are critical long lead time items that are staged shore-side in the event of a catastrophic failure on an operational ship. These spares must be periodically replenished as assets are utilized. Furthermore, as the LPD 17 Class continues to introduce new ships (additional) to the fleet, the number of spare requirements increases as additional items are added to the spares list to support newer shipboard configurations. [P40A / CJ080 Conjunctive HM&E AIT]: CJ080 CONJUNCTIVE HM&E ALTERATIONS Conjunctive HM&E Alterations includes design integration, equipment procurement, recurring equipment engineering, equipment integration and Integrated Logistics Services (ILS). [P40A / CJ081 - Navy Common Actuators]: CJ081 Navy Common Actuator Development Program Congressionally enacted requirement for Navy Common Actuator solution and supportability for the Class. [P40A / CJ035 - HM&E CONDITION SYSTEM]: CJ035 HULL, MECHANICAL AND ELECTRICAL CONDITION SYSTEM This solution proposed would implement HM&E principles, it would implement a Defense-in-Depth Functional Implementation Architecture (DFIA) and meet the requirements of the standards released by the Information Assurance Technical Authority Board (IA TAB) across all the H,M&E systems deploying the ability to protect, detect, react, and restore in a contested environment. The HM&E Condition System will monitor the signals on the HM&E network, both between HM&E systems and also those coming from other functional domains. [P40A / CJ090 - LPD17 Class Mid-life Modernization (ExMOD)]: CJ090 LPD 17 CLASS MID-LIFE MODERNIZATION Conduct Mid-Life modernization on LPD 17 Class Ships in order to ensure they are ready, relevant, and capable of reaching their 40+ year Expected Service Life. [P40A / CJ091-ECS PIMCS/SCS GOV]: CJ091 - ECS PIMCS - SCS Gov Implementation of system upgrades to address the need for a common, sustainable and reliable ECS and SCS across LPD ships which will address obsolescence issues, improve circuit card reliability, reduce circuit card costs, increase cybersecurity posture and provide commonality in steering systems among surface ships. [P40A / CJ443 - Digital Rudder Angle Display System (DRADiS) (PMS443)]: CJ443 - Digital Rudder Angle Display System (DRADiS) Beginning in FY26 as part of the NAVSEA SEA21 reorganization, funding transferred from Cost Code CJ090 (owned by PMS321) to this newly established Cost Code (owned by PMS443). Efforts include the procurement and installation of DRADiS equipment, oversight support, and engineering support for the System Operational Verification Test (SOVT). An Alteration Installation Team (AIT) will perform this work as per a Ship Change Document (SCD). The system will provide rudder position indication to multiple displays throughout the ship, ensuring continuous Rudder Angle Indication during specific steering casualties. [P3A / CJ030 - HW/SW Obsolescence]: CJ030, CJ032 LPD 17 Hardware/Software HW/SW Obsolescence effort addresses critical hardware obsolescence and technology refreshment issues and supporting class upgrades focused on increased capability and reliability. Funding will support procurement of hardware and software changes to the systems listed: -Command Information Display System (CIDS) 23TV, Replace projectors with Light Emitting Diode (LED) Projectors -Engineering Control Systems (ECS) - Windows 10 upgrades -Fire Detection System Upgrade Phase 1 -Wire-free Portable Communication System (WPCS) - Uninterrupted Power Supply (UPS) Upgrade, Low Power Amplifier Upgrade, Main Site Upgrade. -27TV - 28TV System Upgrade -Integrated Voice Communication System (IVCS) - IVCS system upgrades (local cutout switches, AFT lookout communication mod, obsolete terminal replacement, FWD/AFT Keyswitched Integrated Terminal Equipment (KITE)), Software version 7.2.2 -1MC Announcing System - Digital Microphone Control Station -Damage Control Action Management System (DCAMS) - Upgrade to Advanced Damage Control System (ADCS) -Obsolete Fire Alarm Control Panel Replacement (FACP). [P3A - 2 / CJ040 HM&E Electrical Modifications]: CJ040 HM&E ELECTRICAL MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on electrical systems and ultimately resolve maintenance intensive system concerns. HM&E Electrical Modifications include: -SWAN UPS- Space Based UPS Reduction -Helo/Aircraft Electrical Service System (HESS/AESS). [P3A - 3 / CJ050 - HM&E Survivability Modifications]: CJ050 HM&E SURVIVABILITY MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on HM&E systems (impacting ship survivability) and ultimately resolve maintenance intensive system concerns. HM&E Survivability Modifications include: -Composite Ventilation Louvers and Screens. [P3A - 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications]: CJ060, CJ061, CJ062, CJ063 HM&E MECHANICAL/AUXILIARY MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on mechanical and auxiliary systems and ultimately resolve maintenance intensive system concerns. HM&E Mechanical/ Auxiliary Modifications include: -MIDE Bulkhead Shaft Seal -Helo Hangar Door Control Modifications -2nd Pass Reverse Osmosis (RO) Unit Upgrade, RO Unit Potable Water Electrolytic Disinfectant Generator (EDG) Recirculation Capability -Aviation Maintenance Bridge Crane Replacement -Knuckleboom Crane Improvements -Scullery Improvements -Branch Piping Modifications -Titanium valve replacement -Common Fuel Rail upgrades [P3A - 5 / CJ070 SWAN-CANES Integration]: CJ070 SWAN-CANES Integration The results of the Shipboard Wide Area Network (SWAN) / Consolidated Afloat Networks and Enterprise Services (CANES) study directed the replacement of the C4I capability of the LPD 17 Class SWAN with CANES and the conversion of the non-C4I SWAN into a new HM&E Network (mini SWAN). SWAN funding is required to field the new HM&E Network in support of the CANES installation. In addition, funding is required to sustain the legacy SWAN, while the LPD 17 Class ships await the CANES/HM&E Network back fit installation. SWAN serves as the backbone of the LPD 17 class and funding is necessary to address obsolescence, reliability issues, performance concerns, emergent Fleet requirements including enabling Cryptologic Log On (CLO), removing unsupported software, replacing aging obsolete network hardware (e.g., servers and core switches), and maintaining the Information Assurance posture of the Common Operating Environment (COE). This funding is vital to ensure the LPD 17 Class ships can combat the evolving cyber threat.

Justification

Justification LPD Class Support Equipment

The FY 2026 request for LPD Class Support Equipment includes $101,042 thousand of discretionary and $24,500 thousand of mandatory (reconciliation) for a total of $125,542 thousand. The mandatory funds support AMPHIB modernization, LPD availability procurements and LPD Midlife availabilities. Further information for this reconciliation request is provided in Section 200010 (Readiness) of the Reconciliation Exhibit. The FY 2026 increase in discretionary funding is due to a larger workload and more ship complexity scheduled in FY 2026. FY 2026 is the first year of A-2 year needed long lead time material procurements for LPD 18 in FY 2028 CNO availability Midlife package, accounting for $33,000K. $18.800K increase for newly appropriated CJ091 - ECS PIMCS - SCS Gov: Implementation of system upgrades to address the need for a common, sustainable and reliable ECS and SCS across LPD ships which will address obsolescence issues, improve circuit card reliability, reduce circuit card costs, increase cybersecurity posture and provide commonality in steering systems among surface ships. Based on CNO Availability schedules; CJ030, CJ061, CJ063 cost code installations have increased by $26,000K. The FY 2026 request was reduced by $12.789 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget Line Items(workbook-cited)

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$80.9M
Other Procurement, NavyNFY25 Enacted$38.1M
Other Procurement, NavyNFY26 Disc. Request$101.0M
Other Procurement, NavyNFY26 Reconciliation$24.5M
Other Procurement, NavyNFY26 Total$125.5M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$415.2M$80.9M$38.1M$101.0M$101.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →