Skip to content
Fiscal Receipts

LCC 19/20 Extended Service Life Program

NavyProcurementReconciledBLI0934
What it is
LCC 19/20 Extended Service Life Program (0934) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
+$11.9M FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$10.5MP-1 TOA · PB2026
FY25 Enacted
$7.35MP-1 TOA · PB2026
FY26 Request
$19.3MP-1 TOA · PB2026
FY25→26 Change
+$11.9MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $10.5MFY25: $7.35MFY26: $19.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$10.5M
FY25$7.35M
FY26$19.3M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$1.40M$20.0M$10.5M
Enacted–$20.0M$10.5M$7.35M
Request––$10.5M$7.35M$19.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $10.5M for FY2024; the PB2026 book reported $10.5M as actual total obligation authority — $7.00K below the request. 10.5 − 10.5 = -0.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — LCC 19/20 Extended Service Life Program

The FY 2026 budget provides funding for Extended Service Life Program (ESLP) targeted modernization of various Hull, Mechanical and Electrical (HM&E) systems onboard the Amphibious Command Ship (LCC) 19 hull. The major modernization efforts include Ship Service/Emergency Diesel Generator Upgrades (SS/EDG). [P40A / SS/EDG Genset Upgrade]: The Ship Service Generator upgrades replace the #1SS/EDG and #3SSDG with a 2000KW unit, similar to the existing #3SSDG but shock qualified, and accomplishes necessary distribution modifications. This replacement adds an additional 1425KW to the Diesel generating plant and provides the additional capacity to provide ample power to support full ship's functions/C4I capabilities on a continuous basis. The design also includes the installation of dual redundant voltage regulators. [P40A / IVN Upgrade]: Integrated Voice Network (IVN) upgrade replaces the legacy Ship Service Telephone System with ruggedized communications system that provides command and control communications for tactical employment of forces. The new system will bring LCC 19 into alignment with LPD, LSD, and LHD modernization. [P40A / General Announcing System Upgrade]: The General Announcing System upgrade replaces currently installed 1/3/6 MC Announcing Systems with the AN/SIA-129 Digital Integrated Announcing System to provide a technology refresh and enhancement for the 1/3/6 MC one-way announcing systems. [P40A / 21/24MC CAPT/FLAG CMD Intercom Replacement]: The 21/24 MC CAPT/FLAG CMD Intercom upgrade removes and replaces the existing obsolete and unreliable 23MC and 26MC intercom units with a Commercial Off The Shelf (COTS) solution. [P40A / Ship Control System (SCS) Modernization]: The Ship Control System upgrade will replace the existing, analog ship control equipment in the Pilot House, Steering Gear Room and Engine Order Station with digital equivalents. This change is being driven primarily to address obsolescence issues but will also provide additional redundancy, accuracy, capability, alarm management and will reduce maintenance workload for ship's force. [P40A / Pilot House Redesign]: The Pilothouse Redesign upgrade replaces existing Bridge layout with improved navigational operations and watchstander capability. [P40A / LCC 19 ESLP]: The ESLP modernization package upgrades or replaces existing Degaussing, Automation Controllers, Automatic and Manual Bus Transfer Switches/Breakers, Water Heater, Desalinators, Boiler Water Level Indicators, Main Feed Pumps, Programmatic Logic Console, Lube Oil Control and Steam Plant Control for safety, elimination of obsolescence challenges, enhanced operational reliability, improved watchstander capability, and improvement of systems and equipment to meet end of service life.

Justification

Justification — LCC 19/20 Extended Service Life Program

The increase in funding from FY 2025 to FY 2026 supports installation of the Ship Service/Emergency Diesel Generator Upgrade alteration planned for the LCC 19 Docking Selected Restricted Availability. The FY 2026 request was reduced by $2.809 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$10.5M
Other Procurement, NavyNFY25 Enacted$7.35M
Other Procurement, NavyNFY26 Disc. Request$19.3M
Other Procurement, NavyNFY26 Total$19.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$61.6M$10.5M$7.35M$19.3M$19.3M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LCC 19/20 Extended Service Life Program. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.