Skip to content
Fiscal Receipts

LHA/LHD Midlife

NavyProcurementReconciledBLI0933
What it is
LHA/LHD Midlife (0933) is a Navy procurement line funded in the Other Procurement, Navy account.
What changed
+$41.8M FY25→26 P-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$102.3MP-1 TOA · PB2026
FY25 Enacted
$81.6MP-1 TOA · PB2026
FY26 Request
$123.4MP-1 TOA · PB2026
29.6% reconciliation

$86.9M discretionary + $36.5M one-time reconciliation. Discretionary change vs FY2025 enacted: +6.5%.

FY25→26 Change
+$41.8MP-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $123.4M TOA − $86.9M J-book line = 36.5M (123.4 − 86.9 = 36.5) — $36.5M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $102.3MFY25: $81.6MFY26: $123.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$102.3M
FY25$81.6M
FY26$123.4M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$119.4M$38.2M$102.3M
Enacted–$38.2M$104.4M$81.6M
Request––$104.4M$81.6M$123.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $104.4M for FY2024; the PB2026 book reported $102.3M as actual total obligation authority — $2.04M below the request. 102.334 − 104.369 = -2.035 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — LHA/LHD Midlife

The Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) Modernization Program is required to upgrade the in-service LHA 6 and LHD 1 Class ships in order to keep the LHA and LHD Class relevant and operational. The LHA and LHD Program is composed of a series of improvements in both the Hull, Mechanical, and Electrical (HM&E), Interior Communication, Cybersecurity and Aviation Integration systems. Some major modernization efforts include the procurement and installation of Brushless Generators, Electric Plant and Power Management Platform (PMP), Main Feed Pump replacement, and Propulsion and Auxiliary Control System (PACS), Ballast and DC Console, High Efficiency Super Capacity (HES-C) Chiller, and Modular Refrigeration System. The Brushless Generator replacement will reduce down time, total ownership costs, and maintenance costs associated with antiquated brush type generators. Main feed pump procurement and install replaces obsolete main feed pumps for the main propulsion boiler. Propulsion and Auxiliary Control System (PACS) provides a network infrastructure for HM&E systems.

Justification

Justification — LHA/LHD Midlife

The FY 2026 request for LHA/LHD Midlife includes $86,884 thousand of discretionary and $36,500 thousand of mandatory (reconciliation) for a total of $123,384 thousand. The mandatory funds support AMPHIB modernization and LHD HM&E integration and availability procurements. Further information for this reconciliation request is provided in Section 200002 (Shipbuilding) of the Reconciliation Exhibit. FY 2026 funds provided for the modernization of Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) ships to include alteration procurements, installations and Design Services Allocation (DSA), continued Non Reoccurring Engineering (NRE) and engineering services. Discretionary funding increased by $5.282M from FY 2025 to FY 2026. Net increase mainly driven by increases in procurement quantity of Power Management Platform (Electric Plant Control), HES-C procurements and a decrease in installation of Propulsion and Auxiliary Control System (PACS). The FY 2026 request was reduced by $13.131 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Other Procurement, NavyNFY24 Actuals$102.3M
Other Procurement, NavyNFY25 Enacted$81.6M
Other Procurement, NavyNFY26 Disc. Request$86.9M
Other Procurement, NavyNFY26 Reconciliation$36.5M
Other Procurement, NavyNFY26 Total$123.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$379.3M$102.3M$81.6M$86.9M$86.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
HII FLEET SUPPORT GROUP LLCN6449823F3051medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LHA/LHD Midlife. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.