LHA/LHD Midlife
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $102.3M
- FY26
- $123.4M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $119.4M | $38.2M | $102.3M | ||
| Enacted | – | $38.2M | $104.4M | $81.6M | |
| Request | – | – | $104.4M | $81.6M | $123.4M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $104.4M for FY2024; the PB2026 book reports $102.3M actually spent — $2.04M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — LHA/LHD Midlife
The Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) Modernization Program is required to upgrade the in-service LHA 6 and LHD 1 Class ships in order to keep the LHA and LHD Class relevant and operational. The LHA and LHD Program is composed of a series of improvements in both the Hull, Mechanical, and Electrical (HM&E), Interior Communication, Cybersecurity and Aviation Integration systems. Some major modernization efforts include the procurement and installation of Brushless Generators, Electric Plant and Power Management Platform (PMP), Main Feed Pump replacement, and Propulsion and Auxiliary Control System (PACS), Ballast and DC Console, High Efficiency Super Capacity (HES-C) Chiller, and Modular Refrigeration System. The Brushless Generator replacement will reduce down time, total ownership costs, and maintenance costs associated with antiquated brush type generators. Main feed pump procurement and install replaces obsolete main feed pumps for the main propulsion boiler. Propulsion and Auxiliary Control System (PACS) provides a network infrastructure for HM&E systems.
Justification
Justification — LHA/LHD Midlife
The FY 2026 request for LHA/LHD Midlife includes $86,884 thousand of discretionary and $36,500 thousand of mandatory (reconciliation) for a total of $123,384 thousand. The mandatory funds support AMPHIB modernization and LHD HM&E integration and availability procurements. Further information for this reconciliation request is provided in Section 200002 (Shipbuilding) of the Reconciliation Exhibit. FY 2026 funds provided for the modernization of Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) ships to include alteration procurements, installations and Design Services Allocation (DSA), continued Non Reoccurring Engineering (NRE) and engineering services. Discretionary funding increased by $5.282M from FY 2025 to FY 2026. Net increase mainly driven by increases in procurement quantity of Power Management Platform (Electric Plant Control), HES-C procurements and a decrease in installation of Propulsion and Auxiliary Control System (PACS). The FY 2026 request was reduced by $13.131 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Budget Line Items(workbook-cited)
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Other Procurement, Navy | N | FY24 Actuals | $102.3M |
| Other Procurement, Navy | N | FY25 Enacted | $81.6M |
| Other Procurement, Navy | N | FY26 Disc. Request | $86.9M |
| Other Procurement, Navy | N | FY26 Reconciliation | $36.5M |
| Other Procurement, Navy | N | FY26 Total | $123.4M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $379.3M | $102.3M | $81.6M | $86.9M | $86.9M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.