What it is
War Consumables (0720) is a Navy procurement line funded in the Aircraft Procurement, Navy account.
What changed
+$1.55M FY25→26 P-1 TOA · PB2026
Who gets it
L3HARRIS TECHNOLOGIES leads 2 contractor families sharing $82.9M in high-confidence matched awards.

Budget figures

FY24 Actuals
$44.6MP-1 TOA · PB2026
FY25 Enacted
$43.6MP-1 TOA · PB2026
FY26 Request
$45.2MP-1 TOA · PB2026
FY25→26 Change
+$1.55MP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $44.6MFY25: $43.6MFY26: $45.2MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$44.6M
FY25$43.6M
FY26$45.2M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$42.4M$40.3M$44.6M
Enacted–$40.3M$44.6M$43.6M
Request––$44.6M$43.6M$45.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $44.6M for FY2024; the PB2026 book reported $44.6M as actual total obligation authority — $58.0K below the request. 44.57 − 44.63 = -0.06 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — War Consumables

The WAR CONSUMABLES P-1 line item has two subcategories: Common Aircraft Armament Equipment (AAE) and Aerial Refueling Stores (ARS). The Common AAE program procures, modifies and upgrades Stores Suspension and Release Equipment (SSRE) which includes common bomb racks, peculiar bomb racks, missile launchers and related support for USN/USMC platforms. The ARS program procures, modifies, and upgrades aerial refueling stores, External Fuel Tanks (EFT) and related support. COMMON AIRCRAFT ARMAMENT EQUIPMENT (AAE) As directed by OPNAVINST 8000.16B (Naval Ordnance Maintenance Management Program (NOMMP)), the appropriation provides for procurement of new AAE to replace attrition losses, provides for production engineering support and satisfies commonality policy goals set forth by the Navy's Strike Warfare Master Plan. Specifically, the following equipment is funded as AAE within the War Consumables budget: - Upgrades, modifications and reliability improvements to common and peculiar bomb rack and associated equipment. - Upgrades, modifications and reliability improvements to various missile launchers and associated equipment that support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y and MH-60R/S. - Upgrades, modifications and reliability improvements to Pure Air Generating Systems (PAGS). There are two variants of PAGS, Marotta Pure Air Compression Technology (MPACT)/High Pressure Pure Air Generators (HiPPAG), currently in use as on-board coolant generator for missile launchers carrying infrared (IR) seeking missiles. - The BRU-55 is an upgrade to the BRU-33 CVER (Canted Vertical), with electronic upgrades, which allows for the carriage and release of two MIL-STD-1760 weapons from a single F/A-18 A-F station. The BRU-55 was developed as part of the Mk-82 JDAM program. - A Universal Armament Interface (UAI) Type II interface is required for operation and carriage of the Small Diameter Bomb II (SDB II) weapon on the threshold aircrafts F-35B and F-35C and the objective aircraft F/A-18 E/F for the Department of the Navy (DoN). DoN will be using BRU-55 for carriage on F-18 E/F aircraft and BRU-61 for F-35 B/C to support the SDB II warfighter requirements, Initial Operating Capability (IOC), and schoolhouse requirements. BRU-55 A/A's will be modified to BRU-55 B/A's. - The BRU-61 pneumatic rack is required for carriage of SDB II on F-35 aircraft. The BRU-61 uses the Universal Armament Interface (UAI) software to pass updates from the aircraft to the weapon. AERIAL REFUELING STORES (ARS) The ARS program finances Aerial Refueling Systems, such as Digital Controller Upgrade (DCU) and Optical Reference System (ORS), EFT and related support equipment. Requirements are determined by an inventory objective, which supports peacetime/wartime needs. Aircraft equipped with the A/A42R-1 Aerial Refueling Stores (ARS) are required for all carrier based tanking missions. Total reliance on the ARS and integration in the F/A-18E/F requires substantial improvements to the existing stores to ensure their viability through 2050. Investigation of major subsystems support the improvement of the ARS to achieve life cycle cost savings, mitigation of flight safety risk and reliability enhancements. The following equipment is funded as ARS within the War Consumables budget: - External Fuel Tanks for F/A-18 (A-D variants), required to meet the Fleet Response plan and replace original equipment due to fatigue issues. - ARS Support Equipment - External Fuel Tank Support Equipment - Provides production support, modification, and modernization of ARS and EFT products.

Justification

Justification — War Consumables

FY 2026 request provides funding to procure, modify and/or upgrade bomb racks, missile launchers, Aerial Refueling Store, and associated support. FY 2026 procurements support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y, MH-60R/S, F-35B, and F-35C. Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft Type/Model/Series. This may also cause the budget line to exceed the OSD standard inflation rate. The FY 2026 request was reduced by $2.938 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.375 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Aircraft Procurement, NavyNFY24 Actuals$44.6M
Aircraft Procurement, NavyNFY25 Enacted$43.6M
Aircraft Procurement, NavyNFY26 Disc. Request$45.2M
Aircraft Procurement, NavyNFY26 Total$45.2M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.36B$44.6M$43.6M$45.2M$45.2M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 0720 (War Consumables), its 3 largest high-confidence awards, the 2 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 0720 (War Consumables), its 3 largest high-confidence awards, the 2 recipient families behind them, and the 3 congressional districts the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNProcurement appropriation072045.2M FY26N0001917C0029L3HARRIS TECHNOLOGIES, INC.69.4MN6833522C0097L3HARRIS TECHNOLOGIES, INC.15.0MN0001914C0032THE BOEING COMPANY10.1ML3Harris Technologies, IncThe Boeing CompanyNY-02NY-04MO-01

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
NY-02$68.7M
NY-04$13.3M
MO-01$920.9K

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
L3HARRIS TECHNOLOGIES, INC.N0001917C0029high
L3HARRIS TECHNOLOGIES, INC.N6833522C0097high
THE BOEING COMPANYN0001914C0032high

Contractor concentration

HHI Indexⓘ
8091
Highly Concentrated
2023 Merger Guidelines bands
Top Contractor
L3HARRIS TECHNOLOGIES
Contractor Families
2
Program Obligationsⓘ
$82.9M

High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not War Consumables. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.