Printed from https://fiscalreceipts.com/program/0720/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
War Consumables
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $44.6M |
| FY25 | $43.6M |
| FY26 | $45.2M |
All series figures: P-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|
| Actuals | $42.4M | $40.3M | $44.6M | ||
| Enacted | – | $40.3M | $44.6M | $43.6M | |
| Request | – | – | $44.6M | $43.6M | $45.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $44.6M for FY2024; the PB2026 book reported $44.6M as actual total obligation authority — $58.0K below the request. 44.57 − 44.63 = -0.06 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Description — War Consumables
The WAR CONSUMABLES P-1 line item has two subcategories: Common Aircraft Armament Equipment (AAE) and Aerial Refueling Stores (ARS). The Common AAE program procures, modifies and upgrades Stores Suspension and Release Equipment (SSRE) which includes common bomb racks, peculiar bomb racks, missile launchers and related support for USN/USMC platforms. The ARS program procures, modifies, and upgrades aerial refueling stores, External Fuel Tanks (EFT) and related support. COMMON AIRCRAFT ARMAMENT EQUIPMENT (AAE) As directed by OPNAVINST 8000.16B (Naval Ordnance Maintenance Management Program (NOMMP)), the appropriation provides for procurement of new AAE to replace attrition losses, provides for production engineering support and satisfies commonality policy goals set forth by the Navy's Strike Warfare Master Plan. Specifically, the following equipment is funded as AAE within the War Consumables budget: - Upgrades, modifications and reliability improvements to common and peculiar bomb rack and associated equipment. - Upgrades, modifications and reliability improvements to various missile launchers and associated equipment that support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y and MH-60R/S. - Upgrades, modifications and reliability improvements to Pure Air Generating Systems (PAGS). There are two variants of PAGS, Marotta Pure Air Compression Technology (MPACT)/High Pressure Pure Air Generators (HiPPAG), currently in use as on-board coolant generator for missile launchers carrying infrared (IR) seeking missiles. - The BRU-55 is an upgrade to the BRU-33 CVER (Canted Vertical), with electronic upgrades, which allows for the carriage and release of two MIL-STD-1760 weapons from a single F/A-18 A-F station. The BRU-55 was developed as part of the Mk-82 JDAM program. - A Universal Armament Interface (UAI) Type II interface is required for operation and carriage of the Small Diameter Bomb II (SDB II) weapon on the threshold aircrafts F-35B and F-35C and the objective aircraft F/A-18 E/F for the Department of the Navy (DoN). DoN will be using BRU-55 for carriage on F-18 E/F aircraft and BRU-61 for F-35 B/C to support the SDB II warfighter requirements, Initial Operating Capability (IOC), and schoolhouse requirements. BRU-55 A/A's will be modified to BRU-55 B/A's. - The BRU-61 pneumatic rack is required for carriage of SDB II on F-35 aircraft. The BRU-61 uses the Universal Armament Interface (UAI) software to pass updates from the aircraft to the weapon. AERIAL REFUELING STORES (ARS) The ARS program finances Aerial Refueling Systems, such as Digital Controller Upgrade (DCU) and Optical Reference System (ORS), EFT and related support equipment. Requirements are determined by an inventory objective, which supports peacetime/wartime needs. Aircraft equipped with the A/A42R-1 Aerial Refueling Stores (ARS) are required for all carrier based tanking missions. Total reliance on the ARS and integration in the F/A-18E/F requires substantial improvements to the existing stores to ensure their viability through 2050. Investigation of major subsystems support the improvement of the ARS to achieve life cycle cost savings, mitigation of flight safety risk and reliability enhancements. The following equipment is funded as ARS within the War Consumables budget: - External Fuel Tanks for F/A-18 (A-D variants), required to meet the Fleet Response plan and replace original equipment due to fatigue issues. - ARS Support Equipment - External Fuel Tank Support Equipment - Provides production support, modification, and modernization of ARS and EFT products.
Justification
Justification — War Consumables
FY 2026 request provides funding to procure, modify and/or upgrade bomb racks, missile launchers, Aerial Refueling Store, and associated support. FY 2026 procurements support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y, MH-60R/S, F-35B, and F-35C. Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft Type/Model/Series. This may also cause the budget line to exceed the OSD standard inflation rate. The FY 2026 request was reduced by $2.938 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." The FY 2026 request was reduced by $0.375 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit P-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Aircraft Procurement, Navy | N | FY24 Actuals | $44.6M |
| Aircraft Procurement, Navy | N | FY25 Enacted | $43.6M |
| Aircraft Procurement, Navy | N | FY26 Disc. Request | $45.2M |
| Aircraft Procurement, Navy | N | FY26 Total | $45.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $1.36B | $44.6M | $43.6M | $45.2M | $45.2M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| L3HARRIS TECHNOLOGIES, INC. | N0001917C0029 | high |
| L3HARRIS TECHNOLOGIES, INC. | N6833522C0097 | high |
| THE BOEING COMPANY | N0001914C0032 | high |
Contractor concentration
High-confidence award links only, pooled across ingested years. The index uses positive obligations; program obligations are net of deobligations. The figures over every published link, including medium-confidence ones, are in the downloadable warehouse, not on this page — why.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not War Consumables. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O390
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_P-1_Procurement.xlsx.
FY2024 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O395
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_P-1_Procurement.xlsx.
FY2025 Department of Defense Budget: Procurement Programs (P-1) · comptroller.war.gov
Exhibit P-1 · O398
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_P-1_Procurement.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
APN BA1-4 Book · www.secnav.navy.mil