ArmyProcurementReconciledBLI0684EB0016
What it is
Ammo Components, All Types (0684EB0016) is an Army procurement line funded in the Procurement of Ammunition, Army account.
What changed
-$1.00K FY25→26 P-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$3.98MP-1 TOA · PB2026
FY25 Enacted
$4.08MP-1 TOA · PB2026
FY26 Request
$4.08MP-1 TOA · PB2026
FY25→26 Change
-$1.00KP-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $3.98MFY25: $4.08MFY26: $4.08MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$3.98M
FY25$4.08M
FY26$4.08M

All series figures: P-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
5 fiscal years of this program as published (FY2022–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY22FY23FY24FY25FY26
Actuals$1.50M$3.06M$3.98M
Enacted–$3.82M$3.98M$4.08M
Request––$3.98M$4.08M$4.08M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Description — Ammo Components, All Types

This budget line includes the Components and Renovation (C&R) of Field Stock effort as well as Weapon Components in support of Proof Acceptance Testing (PAT). The C&R effort supports renovation for unserviceable training and combat ammunition, returning unserviceable items to issuable serviceable condition at a lower cost when compared with procuring new ammunition. The testing efforts include funding to support the Army Test and Evaluation Command (ATEC) at Aberdeen and Yuma Test Centers. Funded testing includes Special Tests, First Article Tests (FAT), Renovation of Field Stocks, and PAT for training and combat ammunition.

Justification

Justification — Ammo Components, All Types

FY 2026 Base procurement dollars in the amount of $2.462 million support the Components and Renovation of Field Stock (C&R) effort. C&R supports the renovation of unserviceable training and combat ammunition, returning unserviceable items to issuable, serviceable condition at a substantial cost savings to the Army when compared to costs to demilitarize and procure new, replacement stock. Proposed C&R efforts undergo cost analysis to compare proposed renovation costs or rework efforts to the cost associated with demilitarization and new procurement to ensure efforts conducted under C&R result in a cost savings to the Army. The efforts are primarily focused on condition codes E and F within Army inventory. FY 2026 Base procurement dollars in the amount of $1.622 million supports several initiatives at Aberdeen Test Center (ATC) and Yuma Test Center (YTC). At ATC, continue a replacement and procurement program for weapons and weapon components that are worn during testing of production ammunition items. Typical purchases include: rifle/carbine/machine gun barrels, receivers, and parts; large caliber barrels; small and medium caliber Mann-type test barrels, mortar barrels and bipod/baseplates. At YTC, continue to acquire and replace weapon components required for continued support of the Production Acceptance Test (PAT) as part of the indirect fire test mission. Purchases include components such as breeches and tubes for medium to large caliber mortars and cannons. At YTC, continue to procure replacement parts for both large and small caliber direct fire weapon systems for production-based support. The primary items to be purchased are recoils, breeches, cradles, and gun tubes for both 120mm M256 and 105mm M68 cannons. In addition, spares will be obtained for 25mm and small arms weapon systems, along with other supporting equipment such as solenoids and bore-sighting equipment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit P-1

AccountOrgTypeAmount
Procurement of Ammunition, ArmyAFY24 Actuals$3.98M
Procurement of Ammunition, ArmyAFY25 Enacted$4.08M
Procurement of Ammunition, ArmyAFY26 Disc. Request$4.08M
Procurement of Ammunition, ArmyAFY26 Total$4.08M

Exhibit P-1R

AccountOrgTypeAmount
Procurement of Ammunition, ArmyAFY24 Actuals$448.0K
Procurement of Ammunition, ArmyAFY25 Enacted$468.0K
Procurement of Ammunition, ArmyAFY 2026 request$468.0K

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$740.0M$3.98M$4.08M$4.08M$4.08M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Ammo Components, All Types. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.