Skip to content
Fiscal Receipts

Electronic Warfare Development

ArmyRDT&EReconciledPE0607313A
What it is
Electronic Warfare Development (0607313A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
No FY25→26 comparison — endpoints unavailable or on different bases.
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$6.39MR-1 TOA · PB2026
FY25 Total
$5.56MR-1 TOA · PB2026
FY26 Request
$0J-book detail · PB2026
FY25→26 Change
No comparison: endpoints unavailable or on different bases

No FY2026 R-1/P-1 request line for this program element. The FY2026 President's Budget request workbook carries no FY2026 line for it; its last workbook figure is FY2025. The PB2026 J-book detail below does carry an FY2026 row for this line, recorded as zero. A workbook blank and a documented zero are different records, and this page shows both. An absent line is not by itself an ending — PB2026 renumbered program elements at scale across the services and defense agencies, so this work may continue under a different number. No successor is linked for this line: this site's program-lineage layer holds no keyed edge pointing forward from here. That is an absence in this site's lineage layer, not a finding about the program: if the J-book narrative on this page describes a realignment, it is quoted below in the document's own words, and this note does not restate it.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $6.39MFY25: $5.56MFY26: $0FY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$6.39MR-1 TOA · PB2026
FY25$5.56MR-1 TOA · PB2026
FY26$0J-book detail · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

6 fiscal years of this program as published (FY2020–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
6 fiscal years of this program as published (FY2020–FY2025): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY20FY21FY22FY23FY24FY25

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY20FY21FY22FY23FY24FY25
Actuals$0$0$5.67M$11.4M$6.39M
Enacted–$0$5.67M$6.43M$6.39M$5.56M
Request––$5.67M$6.43M$6.39M$5.56M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2023 book requested $6.43M for FY2023; the PB2025 book reported $11.4M as actual total obligation authority — $4.99M above the request. 11.4 − 6.4 = 5.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Electronic Warfare Development

This Program Element encompasses operational system development for this tactical ground-based Electronic Warfare (EW) and Terrestrial Signals Intelligence (SIGINT) system and employment applications. The systems under this program provide the Army with the capability to detect, identify, locate, collect/process, report, and engage (disrupt, degrade or deny) hostile forces to prevent their effective use of communications & non-communications networks, counter-mortar/counter-battery radars, surveillance radars, electronically fused munitions and other enemy threats using the Electro-Magnetic Spectrum (EMS). Prophet enables integration, interoperability and force modernization with emerging capabilities in support of Multi-Domain Operations.

Mission — Prophet

Project CE2 supports the Prophet Enhanced Program, the Army's current fielded terrestrial Signals Intelligence (SIGINT)/Electronic Warfare (EW) support system. Funds provide for development and integration of Signals of Interest (SOI); Technical Insertion (TI) engineering for Next Generation Signals; state-of-the-art SIGINT exploitation techniques to increase the capabilities of Prophet Enhanced; enabling the system to pace near peer; and emerging enemy threat signals. Additionally, funds provide for efforts to include engineering, development and testing to mitigate component obsolescence. The Prophet Enhanced is the tactical commander's organic ground-based SIGINT/EW support system. Its primary mission is to provide 24-hour situation development and information superiority to the supported maneuver brigade to enable the most effective engagement of enemy forces. Prophet Enhanced provides a modular, scalable, open architecture-based system solution optimized for ease of use in a variety of configurations. It also incorporates product modification, integration, evaluation and demonstration events of equipment for rapid integration of TIs and product development to ensure operational relevance.

Justification

Accomplishments & Planned Programs (3)

Program Management

Engineering and technical oversight of the development of next generation signals.

Signal of Interest upgrades

The Signal Environment that Prophet Systems exploit is constantly contested with evolving threats. This environment creates gaps in Prophet's ability to collect and exploit these signals. Prophet must integrate the latest emerging Intelligence Community (IC), commercial solutions, and capabilities from other sources to remain relevant against these numerous, key, and high-priority emerging threats.

Componnet Obsolescence Engineering

Due to the highly technical nature of Prophet Enhanced, over the course of time, many components on the system are no longer produced or supported, which necessitates non-recurring engineering (NRE) to integrate, incorporate, test new and replacement parts.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$6.39M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$5.56M
Research, Development, Test and Evaluation, ArmyAFY25 Total$5.56M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 Request
Program Element$6.39M$5.56M$0
CE2: Prophet$6.39M$5.56M—

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

Showing 25 of 80 from the Senate LDA disclosure database.

BAE SYSTEMS INCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2026matched 2+ title words

FY27 National Defense Authorization Act (HR 8800 / S 4784) and FY27 Department of Defense Appropriations Bill (HR…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2026matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions relating to electronic…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

L3HARRIS TECHNOLOGIES INCElectronic|Warfare2026matched 2+ title words

H.R. 9495 and Senate (bill number TBD) - Department of Defense Appropriations Act, 2027, including programs related to…

L3HARRIS TECHNOLOGIES INCElectronic|Warfare2026matched 2+ title words

H.R. 7148, Consolidated Appropriations Act, including Department of Defense Appropriations Act, 2026 (P.L. 119-75, Div.

LOCKHEED MARTIN CORPORATIONElectronic|Warfare2026matched 2+ title words

S 2572/HR 4016 - Department of Defense Appropriations Act, 2026 including issues related to space, missile defense…

LOCKHEED MARTIN CORPORATIONElectronic|Warfare2026matched 2+ title words

S 4874/HR 8800 - National Defense Authorization Act for Fiscal Year 2027 including issues related to aircraft…

PARSONS CORPORATIONElectronic|Warfare2026matched 2+ title words

S. 4784/H.R. 8800, FY27 Defense Authorization Act: Issues pertaining to missile defense, program management and…

PARSONS CORPORATIONElectronic|Warfare2026matched 2+ title words

S. 2296/H.R. 3838, FY26 Defense Authorization Act: Issues pertaining to missile defense, program management and…

SIERRA NEVADA COMPANY, LLCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2027 (H.R. 8800, S. 4784); Department of Defense Appropriations…

SIERRA NEVADA COMPANY, LLCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (P.L. 119-60); National Defense Authorization Act for Fiscal…

SIERRA NEVADA CORPORATIONElectronic|Warfare2026matched 2+ title words

FY26 and FY27 Budget and Appropriations Process - FY26 Department of Defense Appropriations Act (H.R.4016/S.2572)…

SIERRA NEVADA CORPORATIONElectronic|Warfare2026matched 2+ title words

FY27 Budget and Appropriations Process - FY27 National Defense Authorization Act (H.R.8800/S.4784), FY27 Department of…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

CACI INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems

CACI INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

National Defense Authorization Act, provisions relating to electronic warfare technology. Department of Defense…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues relating to electronic warfare technology.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Electronic Warfare Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.