Apache Future Development (0607145A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
+$36.1M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$44.8MR-1 TOA · PB2026
FY25 Total
$8.24MR-1 TOA · PB2026
FY26 Request
$44.4MR-1 TOA · PB2026
FY25→26 Change
+$36.1MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $44.8MFY25: $8.24MFY26: $44.4MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$44.8M
FY25$8.24M
FY26$44.4M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

9 fiscal years of this program as published (FY2018–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
9 fiscal years of this program as published (FY2018–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY18FY19FY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$5.22M$52.5M$9.70M$26.6M$44.8M
Enacted–$0$5.45M$52.5M$10.1M$25.1M$10.5M$8.24M
Request––$5.45M$77.2M$10.1M$10.1M$10.5M$8.24M$44.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $10.5M for FY2024; the PB2026 book reported $44.8M as actual total obligation authority — $34.2M above the request. 44.762 − 10.547 = 34.215 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Apache Future Development

The Apache Product Improvement program prioritizes, informs, influences, matures, tracks, statuses, and packages technologies and/or material solutions to address known capability gaps identified during real-world combat missions and associated with current/emerging threats for the transition to Apache development for integration and implementation to the AH-64E fleet to increase combat capability.

Mission — Apache Product Improvement

The Apache Product Improvement program prioritizes, informs, influences, matures, tracks, statuses, and packages technologies and/or material solutions to address known capability gaps identified during real-world combat missions and associated with current/emerging threats for the transition to Apache development for integration and implementation to the AH-64E fleet to increase combat capability.

Justification

Accomplishments & Planned Programs (2)

Apache Improved Tail Rotor Drive System (ITRDS)

Increase performance/safety as well as reducing logistics footprint of current Tail Rotor Drive System

Oil Cooled Generator

To design, integrate, and qualify an oil-cooled generator (OCG) for the AH-64E based on systemic quality issues with the current legacy air-cooled generator.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$44.8M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$8.24M
Research, Development, Test and Evaluation, ArmyAFY25 Total$8.24M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$44.4M
Research, Development, Test and Evaluation, ArmyAFY26 Total$44.4M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$44.8M$8.24M$44.4M$44.4M
FD5: Apache Product Improvement$44.8M$8.24M$44.4M$44.4M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Apache Future Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.