Facilities Sustainment - Test and Evaluation Support
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $56.2M
- FY25
- $63.6M
- FY26
- $92.0M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $33.0M | $27.9M | $28.1M | $28.7M | $28.9M | $29.4M | $29.8M | $30.1M | $31.6M | $56.2M | ||
| Enacted | $27.9M | $28.1M | $28.7M | $28.9M | $29.4M | $29.8M | $30.1M | $31.6M | $35.1M | $63.6M | ||
| Request | $28.1M | $28.7M | $28.9M | $29.4M | $29.9M | $30.1M | $31.6M | $35.1M | $63.6M | $92.0M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $35.1M for FY2024; the PB2026 book reports $56.2M actually spent — $21.2M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Facility Sustainment-T&E Support
Sustainment is defined as the maintenance and repair activities necessary to keep facilities in good working order and includes regularly scheduled adjustments and inspections, preventative maintenance tasks, and emergency response and service calls for minor repairs. It also includes major repairs or replacement of facility components (usually accomplished by contract) that are expected to occur periodically throughout the lifecycle of facilities. This work includes regular roof replacement, refinishing of wall and floor surfaces, repairing and replacing of heating and cooling systems, repairing tile, carpeting, and similar types of work. This work also includes inspection and repair of heavy plant machinery, high-power electrical switching gear, hydraulic, lubrication, forced-air and fluid cooling systems, high pressure vessel health monitoring, facility control and remote monitoring systems, liquid oxygen systems, steam systems, test instrumentation, and fire detection and suppression systems. Environmental compliance costs, facility leases, or other tasks associated with facilities operations (such as custodial services grounds services, waste disposal, and the provision of central utilities) are not included. Sustainment funds support the following Air Force organizations and their associated test and evaluation facilities: the 96th Test Wing (TW) at Eglin AFB, FL; the 412TW at Edwards AFB, CA; Arnold Engineering and Development Complex (AEDC), to include assets at Arnold AFB, TN, the 704th Test Group (704TG) at Holloman AFB, NM, the 704TG Landing Gear Test Facility (LGTF) at Wright-Patterson AFB, OH, the Hypersonic Wind Tunnel 9 at White Oak, MD, and the National Full-Scale Aerodynamics Complex (NFAC) at Moffett Field, CA.
Mission — Facilities Sustainment - Test and Evaluation Support
Sustainment is defined as the maintenance and repair activities necessary to keep facilities in good working order and includes regularly scheduled adjustments and inspections, preventative maintenance tasks, and emergency response and service calls for minor repairs. It also includes major repairs or replacement of facility components (usually accomplished by contract) that are expected to occur periodically throughout the lifecycle of facilities. This work includes regular roof replacement, refinishing of wall and floor surfaces, repairing and replacing of heating and cooling systems, replacing tile and carpeting, and similar types of work. This work also includes inspection and repair of heavy plant machinery, high-power electrical switching gear, hydraulic, lubrication, forced-air and fluid cooling systems, high pressure vessel health monitoring, facility control and remote monitoring systems, liquid oxygen systems, steam systems, test instrumentation, and fire detection and suppression systems. Environmental compliance costs, facility leases, or other tasks associated with facilities operations (such as custodial services, grounds services, waste disposal, and the provision of central utilities) are not included. Sustainment funds support the following Air Force organizations and their associated test and evaluation facilities: the 96th Test Wing (TW) at Eglin AFB, FL; the 412 TW at Edwards AFB, CA; the Arnold Engineering and Development Complex (AEDC), to include assets at Arnold AFB, TN, the 704th Test Group (704TG) at Holloman AFB, NM, the 704TG Landing Gear Test Facility (LGTF) at Wright-Patterson AFB, OH, the Hypersonic Wind Tunnel 9 at White Oak, MD, and the National Full-Scale Aerodynamics Complex (NFAC) at Moffett Field, CA. This program is in Budget Activity 6, RDT&E Management Support because this budget activity includes research, development, test and evaluation efforts and funds to sustain and/or modernize the installations or operations required for general research, development, test and evaluation.
Justification
Accomplishments & Planned Programs (3)
Facility sustainment at the 412TW
Facility sustainment at the 412TW
Facility sustainment at the AEDC
Facility sustainment at the AEDC
Facility sustainment at the 96TW
Facility sustainment at the 96TW
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Air Force | F | FY24 Actuals | $56.2M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Enacted | $63.6M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Total | $63.6M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Disc. Request | $92.0M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Total | $92.0M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 6606MR: Facility Sustainment-T&E Support | $0 | $56.2M | $63.6M | $92.0M | $92.0M |
| Program Element | $0 | $56.2M | $63.6M | $92.0M | $92.0M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →