Skip to content
Fiscal Receipts

Navy Space and Electronic Warfare (SEW) Support

NavyRDT&EReconciledPE0605866N
What it is
Navy Space and Electronic Warfare (SEW) Support (0605866N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 2 projects.
What changed
-$1.10M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$26.6MR-1 TOA · PB2026
FY25 Total
$23.7MR-1 TOA · PB2026
FY26 Request
$22.6MR-1 TOA · PB2026
FY25→26 Change
-$1.10MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $26.6MFY25: $23.7MFY26: $22.6MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$26.6M
FY25$23.7M
FY26$22.6M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$2.99M$6.32M$9.66M$16.3M$16.0M$12.2M$15.1M$17.2M$26.4M$26.6M
Enacted$5.32M$9.66M$17.3M$16.2M$12.7M$15.7M$17.7M$27.2M$27.5M$23.7M
Request$9.66M$17.3M$16.2M$15.8M$15.8M$17.7M$27.2M$27.5M$23.7M$22.6M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2020 book requested $15.8M for FY2020; the PB2022 book reported $12.2M as actual total obligation authority — $3.56M below the request. 12.2 − 15.8 = -3.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Navy Space & Electr Warfare Supt

Project 0706, Electromagnetic Compatibility (EMC) and Radio Frequency (RF) Management Program: This project develops tools, processes, EMC Criteria for Navy Systems, and algorithms to identify and mitigate Electromagnetic Interference (EMI) sources for Navy systems and platforms. Project 3239, The Real-Time Spectrum Operations (RTSO) Program: This project develops software to automate analyses of the electromagnetic (EM) environmental effects (E3) between shipboard transmitters and receivers and the interactions of the EM systems with the other systems installed on units within a strike group. The RTSO program develops and updates numerical models, algorithms, databases, and software aiding and supporting warfighter spectrum planning, sensing and monitoring of the EM environment, EM spectrum characterization and prediction, and managing and maneuvering within the EM spectrum.

Mission — EMC & RF Mgmt

Electromagnetic Compatibility (EMC) and Radio Frequency (RF) Management Program: This project develops tools, processes, and algorithms to identify and mitigate Electromagnetic Interference (EMI) sources for Navy systems and platforms. (a) It will support the research, development, testing, and evaluation of electromagnetic compatibility criteria and frequency management to support afloat electromagnetic spectrum operations. The RF EMC criteria will be enhanced to include new RF systems and to comply with fleet operational requirements and streamline Strike Force frequency management processes. It will provide automated Spectrum Management (SM) compatibility criteria for development of operational task communication and radar/weapon plans to support fleet deployments, exercises, and contingency operations. It will provide identification and mitigation of EMI in Navy, North Atlantic Treaty Organization (NATO), Allied, Ashore and Joint Combat Operations. It will provide analysis related to spectrum reallocation proposals to assess impacts on Navy operations and systems, as well as for the Spectrum Supportability Risk Assessments. It will assist numbered fleet commands and DoD commands with determination of EMC criteria and processes to maximize ships' ability to operate in contested and congested environments. (b) It will support the Shipboard Electromagnetic Compatibility Improvement Program (SEMCIP) to identify, engineer, and evaluate effectiveness of potential EMI corrections. The program also characterizes and quantifies the operational impact of EMI problems on system's mission performance. (c) It will support the Nuclear Electromagnetic Pulse (EMP) Survivability Program. The program assesses the EMP survivability of all mission critical systems and funds development of a hardness assurance and maintenance program. It will develop improved modeling capability to reduce hardness validation costs at delivery and over the lifetime of the system/platform. The program develops new and updated design criteria, test methodology, test limits, and survivability validation procedures for all Navy systems, ships, submarines and shore facilities.

Mission — Real-Time Spectrum Operations (RTSO)

The Real-Time Spectrum Operations (RTSO) program develops tools, processes, and algorithms to conduct spectrum planning, spectrum sensing and monitoring of the electromagnetic (EM) environment; to characterize and predict electromagnetic (EM) environmental effects (E3); and to manage and maneuver to avoid and mitigate electromagnetic interference (EMI) and EM vulnerability of Navy platforms. RTSO supports Navy and Marine Corps EM Spectrum Operations for global spectrum usage and allocation planning. RTSO researches the effects between shipboard transmitters and receivers and EM system interactions with the other systems installed on units within a strike group. The program developed a capability to sense and monitor shipboard EM spectrum usage and provides information to validate spectrum plans in support of Emissions Control (EMCON) within the strike group. RTSO software validates and displays spectrum plan compliance with a spectrum common operational picture. This EM spectrum management aid, combined with an Own Force Monitoring (OFM) sensor input, supports Battlespace Awareness and Information Operations. These self-awareness and validation capabilities greatly enhance the Navy's ability to perform command and control of the EM spectrum warfighting domain. FY 2026 RTSO will continue research, development, enhancement and refinement of RTSO software cloud architecture, spectrum common operational picture (COP), live data ingest, detection and counter-detection (1-to-1), time slide, and network nodes. Continue research and development of proof-of-concept capabilities for spectrum mission planning decision aids and intelligent sectoring/cut-outs for radiating systems. Continue research and development efforts for models to estimate effective RF performance ranges of spectrum dependent systems in the complex electromagnetic environment (one-on-one and multi-on-one effects). RTSO will continue to participate in Limited Objective Experiments (LOEs) to demonstrate incremental capability to Fleet users and continue development of a software architecture supporting mission module delivery of RTSO capability on all platforms. Finalize RTSO v2.3 release to afloat Fleet users in a cloud environment, including integration testing, cybersecurity authorization, and completing deployment configurations for all deployment environments. Begin engineering work to develop an improved RTSO OFM and spectrum management design for at least seven different ship classes. RTSO will continue engineering research and development integrating RTSO software and outputs with other software applications and hold fleet user engagements to gain sailor feedback on latest software capabilities to improve usability, functionality, and applicability to user requirements.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$26.6M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$23.7M
Research, Development, Test and Evaluation, NavyNFY25 Total$23.7M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$22.6M
Research, Development, Test and Evaluation, NavyNFY26 Total$22.6M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$26.6M$23.7M$22.6M$22.6M
0706: EMC & RF Mgmt$0$2.68M$2.52M$2.32M$2.32M
3239: Real-Time Spectrum Operations (RTSO)$0$23.9M$21.1M$20.2M$20.2M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

Showing 25 of 80 from the Senate LDA disclosure database.

BAE SYSTEMS INCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2026matched 2+ title words

FY27 National Defense Authorization Act (HR 8800 / S 4784) and FY27 Department of Defense Appropriations Bill (HR…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2026matched 2+ title words

Department of Defense Appropriations Act and National Defense Authorization Act, provisions relating to electronic…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDElectronic|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

L3HARRIS TECHNOLOGIES INCElectronic|Warfare2026matched 2+ title words

H.R. 9495 and Senate (bill number TBD) - Department of Defense Appropriations Act, 2027, including programs related to…

L3HARRIS TECHNOLOGIES INCElectronic|Warfare2026matched 2+ title words

H.R. 7148, Consolidated Appropriations Act, including Department of Defense Appropriations Act, 2026 (P.L. 119-75, Div.

LOCKHEED MARTIN CORPORATIONElectronic|Warfare2026matched 2+ title words

S 2572/HR 4016 - Department of Defense Appropriations Act, 2026 including issues related to space, missile defense…

LOCKHEED MARTIN CORPORATIONElectronic|Warfare2026matched 2+ title words

S 4874/HR 8800 - National Defense Authorization Act for Fiscal Year 2027 including issues related to aircraft…

PARSONS CORPORATIONElectronic|Warfare2026matched 2+ title words

S. 4784/H.R. 8800, FY27 Defense Authorization Act: Issues pertaining to missile defense, program management and…

PARSONS CORPORATIONElectronic|Warfare2026matched 2+ title words

S. 2296/H.R. 3838, FY26 Defense Authorization Act: Issues pertaining to missile defense, program management and…

SIERRA NEVADA COMPANY, LLCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2027 (H.R. 8800, S. 4784); Department of Defense Appropriations…

SIERRA NEVADA COMPANY, LLCElectronic|Warfare2026matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (P.L. 119-60); National Defense Authorization Act for Fiscal…

SIERRA NEVADA CORPORATIONElectronic|Warfare2026matched 2+ title words

FY26 and FY27 Budget and Appropriations Process - FY26 Department of Defense Appropriations Act (H.R.4016/S.2572)…

SIERRA NEVADA CORPORATIONElectronic|Warfare2026matched 2+ title words

FY27 Budget and Appropriations Process - FY27 National Defense Authorization Act (H.R.8800/S.4784), FY27 Department of…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…

BAE SYSTEMS INCElectronic|Warfare2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

CACI INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems

CACI INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues related to photonics, energy storage, modeling and simulation, electronic warfare systems

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

National Defense Authorization Act, provisions relating to electronic warfare technology. Department of Defense…

HONEYWELL INTERNATIONAL INC.Electronic|Warfare2025matched 2+ title words

Issues relating to electronic warfare technology.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Navy Space and Electronic Warfare (SEW) Support. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.