Joint Light Tactical Vehicle (JLTV) Engineering and Manufacturing Development Phase (EMD)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
Insufficient trajectory data for sparkline (only FY26 available).
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $43.3M | $31.2M | $11.1M | $22.5M | $0 | $7.12M | $1.50M | $2.47M | $9.03M | – | ||
| Enacted | $32.5M | $11.5M | $23.5M | $0 | $7.23M | $1.68M | $2.56M | $9.38M | $27.2M | – | ||
| Request | $11.5M | $23.5M | $2.69M | $2.73M | $1.74M | $2.56M | $9.38M | $27.2M | $27.0M | $2.66M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2020 book requested $2.73M for FY2020; the PB2022 book reports $7.12M actually spent — $4.39M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Joint Light Tactical Vehicle (JLTV) Engineering and Manufacturing Development Phase (EMD)
The JLTV Family of Vehicles (FoV), to include a companion trailer, is a United States Army (USA) acquisition lead, joint program with the U.S. Marine Corps (USMC). The JLTV is capable of performing multiple mission roles and designed to provide protected, sustained, networked mobility for personnel and payloads across the full range of military operations. The JLTV Trailer (JLTV-T) is the companion trailer to the JLTV and safely carries its payload while maintaining the same mobility characteristics of the prime mover. The JLTV and JLTV-T are required to be fielded as a system per the Capability Production Document (CPD) last validated 7 June 2019. JLTV and JLTV-T objectives include increased protection and performance over the current fleet; and, minimizing ownership costs by maximizing commonality, fuel efficiency, reliability, and maintaining effective competition throughout the life cycle. Commonality of components, maintenance procedures, training, etc., is expected to be inherent in FoV solutions across mission variants to minimize total ownership cost and to avoid unique service requirements when possible. The Follow-on JLTV Contract was awarded on 09 February 2023 as a single award five-year requirements contract with five one-year options. This program element supports modernization of the JLTV FoV by investigating capability upgrades/insertions, including but not limited to force protection/survivability improvements, predictive logistics, platform safety enhancements including operations in extreme environments, and technologies to meet other emerging operational needs. This program element also supports developing initial prototypes to enable refinement of Operational Requirements and early user feedback to support future sustainment and operational movement operating concepts. The JLTV Program is part of the Army Transformation Initiative. PB26 Justification: The FY 2026 budget funds of $2.664 million will be utilized for the development and assessment of emerging technologies to maintain operational relevancy. Technologies under consideration include but not limited to signature management, winter tires, Counter-Unmanned Aircraft System (cUAS) capabilities and improved force protection. The FY 2026 request was reduced by $0.001 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Mission — Joint Light Tactical Vehicle
The JLTV Family of Vehicles (FoV), to include a companion trailer, is a United States Army (USA) acquisition lead, joint program with the U.S. Marine Corps (USMC). The JLTV is capable of performing multiple mission roles and designed to provide protected, sustained, networked mobility for personnel and payloads across the full range of military operations. The JLTV Trailer (JLTV-T) is the companion trailer to the JLTV and safely carries its payload while maintaining the same mobility characteristics of the prime mover. The JLTV and JLTV-T are required to be fielded as a system per the Capability Production Document (CPD) last validated 7 June 2019. JLTV and JLTV-T objectives include increased protection and performance over the current fleet; and, minimizing ownership costs by maximizing commonality, fuel efficiency, reliability, and maintaining effective competition throughout the life cycle. Commonality of components, maintenance procedures, training, etc., is expected to be inherent in FoV solutions across mission variants to minimize total ownership cost and to avoid unique service requirements when possible. The Follow-on JLTV Contract was awarded on 09 February 2023 as a single award five-year requirements contract with five one-year options. This program element supports modernization of the JLTV (FoV) by investigating capability upgrades/insertions including but not limited to force protection/survivability improvements, predictive logistics, platform safety enhancements including operations in extreme environments, and technologies to meet other emerging operational needs. This program element also supports developing initial prototypes to enable refinement of Operational Requirements and early user feedback to support future sustainment and operational movement operating concepts. The JLTV program is part of the Army Transformation Initiative. PB26 Justification: The FY 2026 budget funds of $2.664 million will be utilized for the development and assessment of emerging technologies to maintain operational relevancy. Technologies under consideration include but not limited to signature management, winter tires, Counter Unmanned Aircraft Systems (cUAS) capabilities and improved force protection.
Justification
Accomplishments & Planned Programs (1)
Evaluation and Assessment of current and future engineering efforts
Evaluation and Assessment of current and future engineering efforts Funding is provided for the support of JLTV evaluation and assessment of current and future engineering efforts.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $2.66M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $2.66M |
Budget Details(R-2/P-40 facts)
| Project | FY26 Base | FY26 Request |
|---|---|---|
| VU9: Joint Light Tactical Vehicle | $2.66M | $2.66M |
| Program Element | $2.66M | $2.66M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →