Printed from https://fiscalreceipts.com/program/0605611M/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Marine Corps Assault Vehicles System Development & Demonstration
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $87.7M
- FY25
- $46.7M
- FY26
- $44.6M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $150.4M | $64.3M | $48.4M | $41.3M | $71.2M | $86.9M | $87.7M | ||
| Enacted | – | $0 | $179.0M | $66.1M | $50.1M | $41.8M | $73.7M | $91.5M | $103.2M | $46.7M | |
| Request | – | $179.0M | $98.2M | $77.3M | $41.8M | $80.7M | $94.6M | $103.2M | $60.2M | $44.6M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $98.2M for FY2019; the PB2021 book reports $64.3M actually spent — $33.9M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Amphibious Combat Vehicle Family of Vehicles
This is a Commandant of the Marine Corps (CMC) Force Design program. The Amphibious Combat Vehicle (ACV) replaces the legacy Assault Amphibious Vehicle (AAV) battalions within the Marine Divisions. ACV-equipped Amphibious Assault (AA) companies will provide protected mobility and general support lift to elements of Marine Infantry Battalions. The ACV, an advanced generation, eight-wheeled armored personnel carrier, will mitigate current and projected capability gaps by providing improved lethality against dismounted enemy troops, more effective land and water tactical mobility, and increased force protection and survivability from blast, fragmentation, and kinetic energy threats. ACV was structured to be executed in multiple increments, with the first increment designed to provide an initial operational capability of personnel carriers (ACV-P). Subsequent increments were planned to provide additional personnel carriers and to develop Mission Role Variants (MRVs), such as command and control (ACV-C), improved lethality (ACV-30), and tactical recovery capabilities (ACV-R). In an Acquisition Decision Memorandum (ADM) dated 8 Jan 2019, ASN(RD&A) authorized the program office to combine the ACV 1.1 and ACV 1.2 programs into a single ACV Family of Vehicles (FOV) that continues the phased development and procurement approach.
Mission — MC AVS Development & Demonstration
This is a CMC Force Design program. ACV provides protected mobility to otherwise dismounted infantry formations and enables littoral maneuver from ship-to-shore and from shore-to-shore. Equipped with modern communications systems and weapons for infantry support-by-fire, the ACV significantly improves the ability of Fleet Marine Forces to access, seize, and hold key maritime terrain in the execution of Expeditionary Advanced Base Operations. The Amphibious Combat Vehicle is imperative to realizing Marine Corps requirements for Fleet Marine Force 2030. The capability to project power from the sea ensures joint freedom of maneuver against increasingly sophisticated area denial and anti-access strategies across the range of military operations in areas vital to our national interest. To this end, an ACV creates operational and tactical options through rapid maneuver on sea and land, provides for the seamless transition of combat power from sea to land, enables rapid response to crisis, enables the introduction of joint follow-on forces and can impose disproportionate costs on our enemies who must extend their defenses. This program has delivered the initial capability of Personnel variants (ACV-Ps) in November 2020 and delivered the initial capability of Command variants (ACV-Cs) in 1st quarter of FY 2025. The Improved Lethality variants (ACV-30s) are on track to deliver in the 3rd quarter of FY 2026, and Recovery variants (ACV-Rs) in the 1st quarter of FY 2028.
Mission — Congressional Adds
This project is a Congressional addition in FY 2024 to determine whether Spherical Brakes would be a suitable replacement for the existing brake system on the ACV Family of Vehicles. It includes developing the Engineering Change Proposal (ECP) for Spherical Brakes with the Army Rapid Capabilities and Critical Technologies Office (RCCTO) and Reliability Qualification Testing (RQT) and Mission Profile Testing with the Aberdeen Test Center. The Army RCCTO executes rapid prototyping and initial equipping of strategically important capabilities to meet commanders' warfighting needs.
Justification
Accomplishments & Planned Programs (4)
Management Services
Contract Advisory and Assistance Services (Engineering and Technical Support, Management Support Services, and Studies and Analyses) for all variants of ACV FOV.
Test & Evaluation
Governmental Developmental Test & Evaluation (DT&E), Operational Test & Evaluation (OT&E), and Live Fire Test and Evaluation (LFT&E) activities.
Program Support
Government labor, material, and travel for Integrated Logistics Support, Technical Publications, Support Equipment development, In-house Technical Support, and Program Management Support.
Product Development
System Design and Development; Engineering and Manufacturing Development (EMD) test vehicle manufacturing; prime contractor Developmental and Operational test support, and development of Logistics Management Information (LMI) data.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $87.7M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $46.7M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $46.7M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $44.6M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $44.6M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| 9999: Congressional Adds | $0 | $1.93M | $0 | $0 | $0 |
| Program Element | $414.1M | $87.7M | $46.7M | $44.6M | $44.6M |
| 0025: Amphibious Combat Vehicle Family of Vehicles | $414.1M | $85.8M | $46.7M | $44.6M | $44.6M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →