Printed from https://fiscalreceipts.com/program/0605514M/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
GROUND BASED ANTI-SHIP MISSILE
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $33.4M |
| FY25 | $50.9M |
| FY26 | $29.0M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|
| Actuals | $0 | $28.2M | $98.8M | $41.4M | $33.4M | ||
| Enacted | – | $29.7M | $102.7M | $43.1M | $36.4M | $50.9M | |
| Request | – | – | $102.7M | $43.1M | $36.4M | $50.9M | $29.0M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2022 book requested $102.7M for FY2022; the PB2024 book reported $98.8M as actual total obligation authority — $3.95M below the request. 98.762 − 102.716 = -3.954 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — GROUND BASED ANTI-SHIP MISSILE
As the Marine Corps' first Ground Based Anti-Ship Missile (GBASM) capability, the Navy/Marine Expeditionary Ship Interdiction System (NMESIS) is a priority central to the Marine Corps' contribution to the Naval Expeditionary Force's (NEF) anti-surface warfare campaign. This is a critical Service modernization capability requirement focused specifically on countering the Nation's pacing threat. Ground based launchers add a new type of threat against a peer adversary, stress different surveillance, and offensive systems, are hard to detect and track in a cluttered environment and add a significant level of persistence and depth to existing anti-ship capabilities. NMESIS will be employed by Medium-range Missile (MMSL) batteries serving as part of Marine Littoral Regiments (MLR) conducting Expeditionary Advanced Base Operations (EABO) while persisting inside the adversary's Weapons Engagement Zone (WEZ). When integrated into sensor and communication networks supporting a naval/maritime mission thread, and synchronized with employment of other missile systems, the Marine Corps' MMSL battery will serve as a component of the NEF "stand-in force" in support of the naval sea control effort. This PE also develops improvements to the Naval Strike Missile. NMESIS consists of two Naval Strike Missiles (NSM) and a launcher/weapon control system integrated on to a ground-based, teleoperated carrier (called ROGUE-Fires). It will provide a ground based anti-access/area denial, anti-ship capability. This program includes design, development, and test of the NSM launcher, ROGUE-Fires carrier, Leader kit, Weapons Control System (WCS), NSM Improvements, and Command and Control (C2) connections to enable the transport and firing of NSMs. NMESIS makes use of proven sub-systems, such as the Joint Light Tactical Vehicle (JLTV) chassis, the U.S. Navy's Naval Strike Missile, and its WCS.
Mission — Ground Based Anti-Ship Missile
As the Marine Corps' first Ground Based Anti-Ship Missile (GBASM) capability, the Navy/Marine Expeditionary Ship Interdiction System (NMESIS) is a force design priority central to the Marine Corps' contribution to the Naval Expeditionary Force's (NEF) surface warfare campaign. This project includes design, development, and test of the NSM launcher, ROGUE-Fires carrier, Leader kit, Weapons Control System (WCS), and Command and Control (C2) connections to enable the transport and firing of NSMs. In FY 2025 NMESIS completed the development and testing of Engineering Change Proposals (ECPs) that increase the overall capability of NMESIS including Common C4 Phase 1 capabilities and testing of one-to-many Leader/Follower mobility operations. In FY 2026, NMESIS will continue development, testing and integration of Common C4 Phase 2, M-CODE receivers, Weapon Control System, and Leader/Follower software improvements.
Mission — NSM Range Extension
As the primary offensive munition in the Marine Corps Ground Based Anti-Ship Missile (GBASM) capability, improving the capability of the Naval Strike Missile (NSM) is a Force Design priority central to the Marine Corps' contribution to the Naval Expeditionary Force's (NEF) surface warfare campaign. The NSM includes the missile, booster, shipping/launch container, flight software and associated items. The goal is to double the range of the current NSM missile over the next five years. Incremental range improvements may be implemented earlier in the production baseline as they complete testing.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $33.4M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $50.9M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $50.9M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $29.0M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $29.0M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $168.4M | $33.4M | $50.9M | $29.0M | $29.0M |
| 6637: Ground Based Anti-Ship Missile | $168.4M | $33.4M | $40.9M | $19.1M | $19.1M |
| 6640: NSM Range Extension | $0 | $0 | $9.97M | $9.89M | $9.89M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
15 mentions from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
H.R. 9495 and Senate (bill number TBD) - Department of Defense Appropriations Act, 2027, including programs related to…
H.R. 7148, Consolidated Appropriations Act, including Department of Defense Appropriations Act, 2026 (P.L. 119-75, Div.
National Defense Authorization Act for Fiscal Year 2026 (HR 3838/S 2296); provisions regarding R&D - Navy, Air Force…
National Defense Authorization Act for Fiscal Year 2026 (PL 119-60); provisions regarding R&D - Navy, Air Force, Space…
Department of Defense Appropriations Act, 2026 (HR 4016/ S XXXX); provisions regarding R&D - Army, Navy/USMC, Air…
House (H.R. 4016) & Senate (Bill number to be determined) Department of Defense Appropriations Act, 2026 - including…
H.R. 4552 and S. 2465, Transportation, Housing and Urban Development, and Related Agencies Appropriations Act, 2026…
FY25 and FY26 Transportation, Housing and Urban Development, and Related Agencies Appropriations; H.R.1968, Full-Year…
H.R. 4552 and S. 2465, Transportation, Housing and Urban Development, and Related Agencies Appropriations Act, 2026…
National Defense Authorization Act for Fiscal Year 2025 including programs related to communications, communications…
H.R. 9028 & S. 4796 - Transportation, Housing and Urban Development, and Related Agencies Appropriations Act, 2025…
H.R. 8774 & S.4921 - Department of Defense Appropriations Act, 2025 - munitions, night vision, tactical communications…
S 1939 - FAA Reauthorization Act of 2024 including issues related to reauthorizing the Federal Aviation Administration…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not GROUND BASED ANTI-SHIP MISSILE. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J339
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J334
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J324
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J322
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J324
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil