Multi-mission Maritime Aircraft (MMA)
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $35.2M |
| FY25 | $34.1M |
| FY26 | $41.1M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $297.4M | $151.5M | $62.0M | $11.4M | $33.0M | $20.6M | $23.3M | $28.8M | $43.9M | $35.2M | ||
| Enacted | $156.3M | $59.1M | $11.8M | $34.2M | $21.5M | $24.1M | $27.3M | $37.9M | $36.0M | $34.1M | ||
| Request | $59.1M | $11.8M | $37.3M | $21.5M | $24.4M | $27.3M | $37.9M | $36.0M | $39.1M | $41.1M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2023 book requested $37.9M for FY2023; the PB2025 book reported $43.9M as actual total obligation authority — $5.97M above the request. 43.9 − 37.9 = 6.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Multi-Mission Maritime Aircraft (MMA) (P-8A)
The P-8A Multi-mission Maritime Aircraft (MMA) program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009. Milestone C was successfully completed on 11 August 2010. The program completed Initial Operational Test and Evaluation (IOT&E) in March 2013 and achieved Initial Operational Capability (IOC) in November 2013. The Acquisition Decision Memorandum approved entry into Full Rate Production on January 3, 2014. During the initial Systems Development and Demonstration (SDD) phase (PE 0605500N PU 2696), which completed in 2020, the program performed the system detailed design, developed and produced Systems Integration Labs, developed and built ground and flight test articles, and conducted ground and flight tests to successfully achieve program milestones. Ground testing included the conduct of static testing, fatigue testing and Live Fire Test and Evaluation. Additionally, six (6) flight test aircraft were built, and grouped into two stages based on which phase of the test program the aircraft supported. SDD Stage I flight test aircraft (FY06/Qty-3) supported Integrated Test and Evaluation (IT&E). SDD Stage II flight test aircraft (FY09/Qty-3) supported the completion of IT&E and IOT&E after being updated to the production configuration. The SDD contract also included the development and initial building of training devices to support IOT&E, all activities necessary to facilitate an efficient transition of the fleet to achieve the P-8A IOC in CY13, and the engineering and verification of corrected deficiencies identified in testing and Fleet operational use. P-8A entered Production and Deployment phase in the 4th quarter of FY10 and entered Full Rate Production in 2nd quarter of FY14. P-8A MMA program follow-on SDD activities (PU 3368) include Assured Maritime Dominance Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW), and Intelligence, Surveillance, and Reconnaissance (ISR) activities implemented as a sequence of Rapid Capability Insertions (RCI) and rapid development efforts to respond to evolving threats and adversary capabilities, which will retain cost effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and/or hardware improvements that increase/exceed the current performance envelope, to include reliability/maintainability improvements, obsolescence, periodic technology insertion, urgent operational needs, correction of deficiencies and flight safety issues to existing sensor capabilities, communications systems, mission systems, airframe and engine component systems, weapons capabilities, training systems and Tactical Operations Center (TOC) /Tacmobile support to build on the initial P-8A SDD (PU 2696) capability baseline. These planned and emergent requirements will be prioritized through either the Navy Integration and interoperability (I&I) aligned Capability Prioritization Process (CPP), P-8A Tier 3 Capability Roadmap and/or through Fleet identification of an Urgent Operational Need. The CPP process is supported by detailed analysis and the maturations of developing technologies. Budget Activity 5. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Mission — P-8 Improvements
The P-8A MMA program's Assured Maritime Dominance Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW), and Intelligence, Surveillance, and Reconnaissance (ISR) activities include a sequence of Rapid Capability Insertions (RCI) and rapid development efforts to respond to evolving threats and adversary capabilities, which will retain cost effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and/or hardware improvements that increase/exceed the current performance envelope, to include reliability/maintainability improvements, obsolescence, periodic technology insertion, urgent operational needs, correction of deficiencies and flight safety issues to existing sensor capabilities, communications systems, mission systems, airframe and engine component systems, weapons capabilities, training systems and Tactical Operations Center (TOC) /Tacmobile support to build on the P-8A capability baseline. These planned and emergent requirements will be prioritized through either the Navy Integration and interoperability (I&I) aligned Capability Prioritization Process (CPP), P-8A Capability Roadmap and/or through Fleet identification of an Urgent Operational Need. The CPP process is supported by detailed analysis and the maturations of developing technologies. Assured Maritime Dominance activities include principal mission lethality, survivability against kinetic and non-kinetic threats, and capability persistence in high-level threat environments. Rapid Development efforts increase lethality through optimization of kill-chain software systems, employment of LRASM, and other weapon systems and Airborne Weapon Simulator capabilities. RCI4 capabilities include kill-chain/gap analysis, ASW Enhancements, common weapons synchronization, and Airborne Weapon Simulator continuation. RCI5 capabilities increase P-8A survivability through Radio Frequency Counter Measure (RFCM) Self Protection Pod/Advanced Survivability Pod (ASP) Certification, P-8A Survivability Assurance and distributed sensor network improvements.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $35.2M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $34.1M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $34.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $41.1M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $41.1M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $148.6M | $35.2M | $34.1M | $41.1M | $41.1M |
| 3368: P-8 Improvements | $148.6M | $35.2M | $34.1M | $41.1M | $41.1M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.
| Recipient | PIID | Confidence |
|---|---|---|
| AEROSPACE MASS PROPERTIES ANALYSIS INC | N6833518C0180 | medium |
| ISLAND CREEK ASSOCIATES, LLC | N6833519C0618 | medium |
| LOCKHEED MARTIN CORPORATION | N0001915C0021 | medium |
| THE BOEING COMPANY | N0001904C3146 | medium |
| THE BOEING COMPANY | N0001914C0067 | medium |
| THE BOEING COMPANY | N0001917F0383 | medium |
| THE BOEING COMPANY | N0001917F0504 | medium |
| THE BOEING COMPANY | N0001918F2430 | medium |
| THE BOEING COMPANY | N0001918F2433 | medium |
| THE BOEING COMPANY | N0001918F2526 | medium |
| THE BOEING COMPANY | N0001919F2496 | medium |
| THE BOEING COMPANY | N0001919F2648 | medium |
| THE BOEING COMPANY | N0001919F2680 | medium |
| THE BOEING COMPANY | N0001919F2963 | medium |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
Showing 25 of 29 from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (bill numbers not yet assigned); FY27…
Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (HR 9495 / Senate bill number not yet…
H.R.9495/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
H.R.____/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…
Support authorization and funding for commercially supported technologies addressing Department of Defense ISR…
Department of Homeland Security Appropriations Act, 2027 (H.R. 9310); U.S. Coast Guard maritime capabilities.
Department of Homeland Security Appropriations Act, 2026 (H.R. 7744); Fiscal Year 2027 Department of Homeland Security…
FY27 Budget and Appropriations Process - FY27 National Defense Authorization Act (H.R.8800/S.4784), FY27 Department of…
Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…
Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…
Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…
Issues and funding related to Fiscal Year 2026 (FY26) Defense Appropriations (HR 4016 / S 2572); FY26 Homeland…
Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…
Issues and funding related to Fiscal Year 2026 (FY26) Defense Appropriations (HR 4016 / S 2572); FY26 Homeland…
HR 1 - One Big Beautiful Bill Act, Title II, including issues related to aircraft, space programs, intelligence…
HR 1 - One Big Beautiful Bill Act, Title II, including issues related to aircraft, space programs, intelligence…
Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…
Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…
Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…
Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…
Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…
Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…
Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / Senate bill number not yet…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Multi-mission Maritime Aircraft (MMA). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J413
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J364
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J394
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J407
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J420
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J428
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J403
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J394
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J393
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J396
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil