Skip to content
Fiscal Receipts

Multi-mission Maritime Aircraft (MMA)

NavyRDT&EReconciledPE0605500N
What it is
Multi-mission Maritime Aircraft (MMA) (0605500N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 1 project.
What changed
+$7.03M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 14 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$35.2MR-1 TOA · PB2026
FY25 Total
$34.1MR-1 TOA · PB2026
FY26 Request
$41.1MR-1 TOA · PB2026
FY25→26 Change
+$7.03MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $35.2MFY25: $34.1MFY26: $41.1MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$35.2M
FY25$34.1M
FY26$41.1M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$297.4M$151.5M$62.0M$11.4M$33.0M$20.6M$23.3M$28.8M$43.9M$35.2M
Enacted$156.3M$59.1M$11.8M$34.2M$21.5M$24.1M$27.3M$37.9M$36.0M$34.1M
Request$59.1M$11.8M$37.3M$21.5M$24.4M$27.3M$37.9M$36.0M$39.1M$41.1M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2023 book requested $37.9M for FY2023; the PB2025 book reported $43.9M as actual total obligation authority — $5.97M above the request. 43.9 − 37.9 = 6.0 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Multi-Mission Maritime Aircraft (MMA) (P-8A)

The P-8A Multi-mission Maritime Aircraft (MMA) program was initiated in response to the Joint Requirements Oversight Council (JROC) validated Mission Needs Statement, "Broad Area Maritime and Littoral Armed Intelligence, Surveillance and Reconnaissance" and the requirements for the program are defined in the P-8A Capability Production Document #791-88-09, validated and approved on 22 June 2009. A successful Critical Design Review was completed in June 2007. In August 2007 the Design Readiness Review was conducted and resulted in approval to obligate funding for the fabrication of the Stage II flight test aircraft. The first flight of P-8A occurred on 25 Apr 2009. Milestone C was successfully completed on 11 August 2010. The program completed Initial Operational Test and Evaluation (IOT&E) in March 2013 and achieved Initial Operational Capability (IOC) in November 2013. The Acquisition Decision Memorandum approved entry into Full Rate Production on January 3, 2014. During the initial Systems Development and Demonstration (SDD) phase (PE 0605500N PU 2696), which completed in 2020, the program performed the system detailed design, developed and produced Systems Integration Labs, developed and built ground and flight test articles, and conducted ground and flight tests to successfully achieve program milestones. Ground testing included the conduct of static testing, fatigue testing and Live Fire Test and Evaluation. Additionally, six (6) flight test aircraft were built, and grouped into two stages based on which phase of the test program the aircraft supported. SDD Stage I flight test aircraft (FY06/Qty-3) supported Integrated Test and Evaluation (IT&E). SDD Stage II flight test aircraft (FY09/Qty-3) supported the completion of IT&E and IOT&E after being updated to the production configuration. The SDD contract also included the development and initial building of training devices to support IOT&E, all activities necessary to facilitate an efficient transition of the fleet to achieve the P-8A IOC in CY13, and the engineering and verification of corrected deficiencies identified in testing and Fleet operational use. P-8A entered Production and Deployment phase in the 4th quarter of FY10 and entered Full Rate Production in 2nd quarter of FY14. P-8A MMA program follow-on SDD activities (PU 3368) include Assured Maritime Dominance Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW), and Intelligence, Surveillance, and Reconnaissance (ISR) activities implemented as a sequence of Rapid Capability Insertions (RCI) and rapid development efforts to respond to evolving threats and adversary capabilities, which will retain cost effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and/or hardware improvements that increase/exceed the current performance envelope, to include reliability/maintainability improvements, obsolescence, periodic technology insertion, urgent operational needs, correction of deficiencies and flight safety issues to existing sensor capabilities, communications systems, mission systems, airframe and engine component systems, weapons capabilities, training systems and Tactical Operations Center (TOC) /Tacmobile support to build on the initial P-8A SDD (PU 2696) capability baseline. These planned and emergent requirements will be prioritized through either the Navy Integration and interoperability (I&I) aligned Capability Prioritization Process (CPP), P-8A Tier 3 Capability Roadmap and/or through Fleet identification of an Urgent Operational Need. The CPP process is supported by detailed analysis and the maturations of developing technologies. Budget Activity 5. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.

Mission — P-8 Improvements

The P-8A MMA program's Assured Maritime Dominance Anti-Submarine Warfare (ASW), Anti-Surface Warfare (ASuW), and Intelligence, Surveillance, and Reconnaissance (ISR) activities include a sequence of Rapid Capability Insertions (RCI) and rapid development efforts to respond to evolving threats and adversary capabilities, which will retain cost effectiveness for winning major combat operations. In order to pace the threat, these efforts will incorporate incremental software and/or hardware improvements that increase/exceed the current performance envelope, to include reliability/maintainability improvements, obsolescence, periodic technology insertion, urgent operational needs, correction of deficiencies and flight safety issues to existing sensor capabilities, communications systems, mission systems, airframe and engine component systems, weapons capabilities, training systems and Tactical Operations Center (TOC) /Tacmobile support to build on the P-8A capability baseline. These planned and emergent requirements will be prioritized through either the Navy Integration and interoperability (I&I) aligned Capability Prioritization Process (CPP), P-8A Capability Roadmap and/or through Fleet identification of an Urgent Operational Need. The CPP process is supported by detailed analysis and the maturations of developing technologies. Assured Maritime Dominance activities include principal mission lethality, survivability against kinetic and non-kinetic threats, and capability persistence in high-level threat environments. Rapid Development efforts increase lethality through optimization of kill-chain software systems, employment of LRASM, and other weapon systems and Airborne Weapon Simulator capabilities. RCI4 capabilities include kill-chain/gap analysis, ASW Enhancements, common weapons synchronization, and Airborne Weapon Simulator continuation. RCI5 capabilities increase P-8A survivability through Radio Frequency Counter Measure (RFCM) Self Protection Pod/Advanced Survivability Pod (ASP) Certification, P-8A Survivability Assurance and distributed sensor network improvements.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$35.2M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$34.1M
Research, Development, Test and Evaluation, NavyNFY25 Total$34.1M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$41.1M
Research, Development, Test and Evaluation, NavyNFY26 Total$41.1M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$148.6M$35.2M$34.1M$41.1M$41.1M
3368: P-8 Improvements$148.6M$35.2M$34.1M$41.1M$41.1M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
AEROSPACE MASS PROPERTIES ANALYSIS INCN6833518C0180medium
ISLAND CREEK ASSOCIATES, LLCN6833519C0618medium
LOCKHEED MARTIN CORPORATIONN0001915C0021medium
THE BOEING COMPANYN0001904C3146medium
THE BOEING COMPANYN0001914C0067medium
THE BOEING COMPANYN0001917F0383medium
THE BOEING COMPANYN0001917F0504medium
THE BOEING COMPANYN0001918F2430medium
THE BOEING COMPANYN0001918F2433medium
THE BOEING COMPANYN0001918F2526medium
THE BOEING COMPANYN0001919F2496medium
THE BOEING COMPANYN0001919F2648medium
THE BOEING COMPANYN0001919F2680medium
THE BOEING COMPANYN0001919F2963medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

Showing 25 of 29 from the Senate LDA disclosure database.

BAE SYSTEMS INCP-82026matched a known alias

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCP-82026matched a known alias

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

GENERAL DYNAMICS CORPMaritime|Aircraft2026matched 2+ title words

Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (bill numbers not yet assigned); FY27…

GENERAL DYNAMICS CORPMaritime|Aircraft2026matched 2+ title words

Issues and funding related to Fiscal Year 2027 (FY27) Defense Appropriations (HR 9495 / Senate bill number not yet…

HONEYWELL INTERNATIONAL INC.Maritime|Aircraft2026matched 2+ title words

H.R.9495/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…

HONEYWELL INTERNATIONAL INC.Maritime|Aircraft2026matched 2+ title words

H.R.____/S.____ Department of Defense Appropriations Bill, 2027 - Title IV, all provisions related to small aircraft…

SIERRA NEVADA COMPANYMaritime|Aircraft2026matched 2+ title words

Support authorization and funding for commercially supported technologies addressing Department of Defense ISR…

SIERRA NEVADA COMPANY, LLCMaritime|Aircraft2026matched 2+ title words

Department of Homeland Security Appropriations Act, 2027 (H.R. 9310); U.S. Coast Guard maritime capabilities.

SIERRA NEVADA COMPANY, LLCMaritime|Aircraft2026matched 2+ title words

Department of Homeland Security Appropriations Act, 2026 (H.R. 7744); Fiscal Year 2027 Department of Homeland Security…

SIERRA NEVADA CORPORATIONMaritime|Aircraft2026matched 2+ title words

FY27 Budget and Appropriations Process - FY27 National Defense Authorization Act (H.R.8800/S.4784), FY27 Department of…

BAE SYSTEMS INCMulti|Aircraft2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

BAE SYSTEMS INCMulti|Aircraft2025matched 2+ title words

Full-Year Continuing Appropriations and Extensions Act, 2025 (PL 119-4); provisions regarding R&D - Army, Navy/USMC…

GENERAL DYNAMICS CORPMaritime|Aircraft2025matched 2+ title words

Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…

GENERAL DYNAMICS CORPMaritime|Aircraft2025matched 2+ title words

Issues and funding related to Fiscal Year 2026 (FY26) Defense Appropriations (HR 4016 / S 2572); FY26 Homeland…

GENERAL DYNAMICS CORPMaritime|Aircraft2025matched 2+ title words

Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / S 4921); FY25 Homeland…

GENERAL DYNAMICS CORPMaritime|Aircraft2025matched 2+ title words

Issues and funding related to Fiscal Year 2026 (FY26) Defense Appropriations (HR 4016 / S 2572); FY26 Homeland…

LOCKHEED MARTIN CORPORATIONMaritime|Aircraft2025matched 2+ title words

HR 1 - One Big Beautiful Bill Act, Title II, including issues related to aircraft, space programs, intelligence…

LOCKHEED MARTIN CORPORATIONMaritime|Aircraft2025matched 2+ title words

HR 1 - One Big Beautiful Bill Act, Title II, including issues related to aircraft, space programs, intelligence…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSMulti|Aircraft2025matched 2+ title words

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

UNITED AUTOMOBILE AEROSPACE & AGRICULTURAL IMPLEMENT WORKERSMulti|Aircraft2025matched 2+ title words

Inflation Reduction Act (H.R.5376) implementation: prescription drug reform. Stabilizing multi- and single-employer…

BAE SYSTEMS INCMulti|Aircraft2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCMulti|Aircraft2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S 4921); provisions regarding R&D-Army, Navy/USMC, Air…

BAE SYSTEMS INCMulti|Aircraft2024matched 2+ title words

Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…

BAE SYSTEMS INCMulti|Aircraft2024matched 2+ title words

Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…

GENERAL DYNAMICS CORPMaritime|Aircraft2024matched 2+ title words

Issues and funding related to Fiscal Year 2025 (FY25) Defense Appropriations (HR 8774 / Senate bill number not yet…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Multi-mission Maritime Aircraft (MMA). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.