Joint Reduced Range Rocket (JR3)

ArmyRDT&EReconciledPE0605244A
What it is
Joint Reduced Range Rocket (JR3) (0605244A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
+$15.3M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
Not in the FY2026 J-books we ingested
FY25 Total
$13.6MR-1 TOA · PB2026
FY26 Request
$28.9MR-1 TOA · PB2026
FY25→26 Change
+$15.3MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY25 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY25 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY25: $13.6MFY26: $28.9MFY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY25$13.6M
FY26$28.9M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2025 enacted — PB2026 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY25FY26
Enacted$13.6M
Request$13.6M$28.9M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Joint Reduced Range Rocket (JR3)

The Joint Reduced Range Rocket (JR3) is a replacement for the Low Cost Reduced Range Practice Rocket (LCRRPR). LCRRPR is the only live training rocket that supports the annual qualification and pre-deployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and MLRS launcher units. JR3 is required because the remaining inventory of launch pod containers and motors is insufficient to support LCRRPR production beyond FY 2030. FY 2026 funding in the amount of $28.893M continues the prototyping and development of the JR3. The munitions developed under this funding line are part of the MLRS Family of Munitions (MFOM) that are deployed by the M142 HIMARS and M270 MLRS launchers.

Mission — Joint Reduced Range Rocket

In order to achieve and maintain combat readiness, the Army has a Standards in Training Commission (STRAC) requirement that utilizes a training rocket to meet the annual certification and pre-deployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and M270A1/M270A2 Multiple Launch Rocket System (MLRS) launcher units. The Joint Reduced Range Rocket (JR3) is required because the remaining inventory of launch pod containers and motors is insufficient to support LCRRPR production beyond FY 2030. FY 2026 funding continues the prototyping and development of the JR3. Upon completion of development and qualification, the JR3 will replace the currently fielded LCRRPR.

Justification

Accomplishments & Planned Programs (2)

Joint Reduced Range Rocket

The JR3 program will develop a new training rocket that can be fired by crews on the HIMARS and MLRS launchers.

SBIR/STTR Transfer

Funding transferred in accordance with Title 15 USC §638.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$13.6M
Research, Development, Test and Evaluation, ArmyAFY25 Total$13.6M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$28.9M
Research, Development, Test and Evaluation, ArmyAFY26 Total$28.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY25 TotalFY26 BaseFY26 Request
Program Element$13.6M$28.9M$28.9M
DJ3: Joint Reduced Range Rocket$13.6M$28.9M$28.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Joint Reduced Range Rocket (JR3). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.