ArmyRDT&EReconciledPE0605241A
What it is
Future Long Range Assault Aircraft Development (program element 0605241A) is a U.S. Army development program funded in the Research, Development, Test and Evaluation, Army account. The program directly aligns to the Future Vertical Lift (FVL) Army modernization priority, an initiative to develop a family of vertical-lift aircraft for the U.S. Armed Forces and to retain long-term industrial-base capabilities.
What changed
-$5.09M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 5 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
Not in the FY2026 J-books we ingested
FY25 Total
$1.25BR-1 TOA · PB2026
FY26 Request
$1.25BR-1 TOA · PB2026
FY25→26 Change
-$5.09MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 2 summary figures for FY25 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 2 summary figures for FY25 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY25: $1.25BFY26: $1.25BFY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY25$1.25B
FY26$1.25B

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2025 enacted — PB2026 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY25FY26
Enacted$1.25B
Request$1.25B$1.25B

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Future Long Range Assault Aircraft Development

This funding line directly aligns to the Future Vertical Lift (FVL) Army modernization priority. FVL is an initiative to develop a family of vertical lift aircraft for the United States Armed Forces. The Department of Defense (DOD) established FVL to focus vertical lift capabilities and technology development as well as retain long-term industrial base capabilities. The Deputy Secretary of Defense issued the FVL Strategic Plan in 2012 to outline a joint approach for the next generation vertical lift aircraft for all military services. The Strategic Plan provided a foundation for replacing the current fleet with advanced capability by shaping the development of vertical lift aircraft for the next 25 to 40 years. In Fiscal Year (FY) 2017, the Army identified FVL as one of the Army's six modernization priorities and established the FVL Cross Functional Team (CFT). The FVL objectives are increased vertical lift maneuverability, range, speed, payload, survivability, and reliability while reducing the logistics footprint. This capability will provide critical vertical lift aviation capability in multi-domain operations to the joint warfighter and maneuver force. The Future Long Range Assault Aircraft (FLRAA) weapon system provides Combatant Commanders with deterrence, power projection, and tactical capabilities at operational and strategic distances. The Army competitively awarded the weapon system development contract in December 2022, using a hybrid acquisition approach. FLRAA integrates advanced technologies, using a modular open systems approach, and design configurations with appropriate trades to ensure affordability. In FY 2025, funding previously planned in PE 0603801A (Aviation - Adv Dev) / Project B47 (Future Vertical Lift) transitioned to Budget Activity 6.5 PE 0605241A (Future Long Range Assault Aircraft Development)/ Project DG5 (Future Long Range Assault Aircraft) for execution of Engineering and Manufacturing Development and to support Budget Activity guidance for programs achieving Milestone B.

Mission — Future Long Range Assault Aircraft

The Future Long Range Assault Aircraft (FLRAA) Project's funding provides Combatant Commanders with deterrence, power projection, and tactical capabilities at operational and strategic distances. FLRAA will retain the Army's ability to project combat power with significantly increased range, speed, mobility, and payload over current Army and Special Operations Command (SOCOM) aircraft. FLRAA is the next generation vertical lift aircraft designed to conduct air assault, urban assault/security, maritime interdiction, medical evacuation, humanitarian assistance/disaster relief, tactical resupply, direct action, noncombatant evacuation operations, and combat search and rescue operations. FLRAA will support the Army, including Special Operations Command (USSOCOM) and the Joint Force, in a contested, near peer threat environment. In FY 2024, FLRAA achieved a successful Milestone B decision allowing the program to enter into the Engineering and Manufacturing Development (EMD) phase. In FY 2025, funding previously planned in PE 0603801A (Aviation - Adv Dev) / Project B47 (Future Vertical Lift) transitioned to Budget Activity 6.5 PE 0605241A (Future Long Range Assault Aircraft Development)/ Project DG5 (Future Long Range Assault Aircraft) for execution of Engineering and Manufacturing Development and to support Budget Activity guidance for programs achieving Milestone B. The FY 2026 budget request funds design updates, continues Prototype and Limited User Test (LUT) aircraft manufacturing, initiates testing, begins production planning, and continues refinement of a digital backbone architected to meet Modular Open System Approach (MOSA) objectives.

Justification

Accomplishments & Planned Programs (2)

Future Long Range Assault Aircraft Weapon System Development

Execution of the Future Long Range Assault Aircraft (FLRAA) Engineering and Manufacturing Development (EMD) phase of the Acquisition Cycle. This includes developmental engineering, prototype manufacturing, test and qualification, supportability planning, systems engineering and program management activities.

FLRAA MEDEVAC Development and Integration

The FLRAA MEDEVAC program involves designing, developing, integrating, delivering, and supporting MEDEVAC mission equipment for the FLRAA. This includes designing platform provisions to facilitate the rapid installation of the MEDEVAC Mission Equipment Package (MEP). The MEP comprises a sensor capable of visually acquiring casualties when vision is obscured, and a modular, adjustable, and reconfigurable Patient Handling System (PHS) with supplemental cabin temperature control if necessary. The aim is to create a MEDEVAC aircraft capable of quickly reaching, evacuating, and providing enroute critical care to patients on the future battlefield.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$1.25B
Research, Development, Test and Evaluation, ArmyAFY25 Total$1.25B
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$1.25B
Research, Development, Test and Evaluation, ArmyAFY26 Total$1.25B

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY25 TotalFY26 BaseFY26 Request
Program Element$1.25B$1.25B$1.25B
DG5: Future Long Range Assault Aircraft$1.25B$1.25B$1.25B

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
BELL TEXTRON INCW58RGZ23C0001medium
BT3 TECHNOLOGY SERVICESW58RGZ20F0252medium
CHELTON LIMITEDW58RGZ25P0015medium
SMARTRONIX, LLCW58RGZ22F0265medium
TORCH TECHNOLOGIES INCW58RGZ23F0089medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

GAO oversight of this program

GAO assessed Future Long Range Assault Aircraft (FLRAA) in its June 2025 Weapon Systems Annual Assessment, as an Army MDAP program.

“FLRAA is part of the Future Vertical Lift portfolio of systems, a top modernization priority for the Army. It is intended to be a medium-sized assault and utility aircraft and deliver speed, range, agility, endurance, and sustainability improvements as compared with current Black Hawk helicopters. The Army also expects the program to provide combatant commanders with tactical capabilities at operational and strategic distances. The Army completed FLRAA's MTA rapid prototyping effort and transitioned the program to the MCA pathway in July 2024.”

GAO-25-107569, p. 93 — the assessment page in GAO’s 2025 report

Earlier editions of the same assessment: June 2024 · June 2023

GAO assessed Future Long Range Assault Aircraft (FLRAA) in its June 2024 Weapon Systems Annual Assessment, as an Army MTA program.

“FLRAA is part of the Future Vertical Lift portfolio of systems, a top modernization priority for the Army. It is intended to be a medium-sized assault and utility aircraft and deliver speed, range, agility, endurance, and sustainability improvements as compared to current Black Hawk helicopters. The Army also expects the program to provide combatant commanders with tactical capabilities at operational and strategic distances. The Army initiated FLRAA using the MTA rapid prototyping pathway in October 2020 to develop two virtual prototypes.”

GAO-24-106831, p. 107 — the assessment page in GAO’s 2024 report

GAO assessed Future Long Range Assault Aircraft (FLRAA) in its June 2023 Weapon Systems Annual Assessment, as an Army MTA program.

“FLRAA is part of the Future Vertical Lift portfolio of systems, a top modernization priority for the Army. It is intended to be a medium-sized assault and utility rotorcraft, to deliver speed, range, agility, endurance, and sustainability improvements as compared with current Black Hawk helicopters. The Army also expects the program to provide combatant commanders with tactical capabilities at operational and strategic distances. The Army initiated FLRAA using the MTA rapid prototyping pathway in October 2020 to develop two virtual prototypes.”

GAO-23-106059, p. 119 — the assessment page in GAO’s 2023 report

GAO assessed the program, not this budget line. Future Long Range Assault Aircraft Development is one of the lines that funds it, and GAO’s work above says nothing about this line’s own figures. Which line each GAO item attaches to is a hand-ratified crosswalk — how it was checked.

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Future Long Range Assault Aircraft Development. GAO's program-level work on this line is above. See the DOD oversight record.

Program dossier

Every sentence below carries its citation — warehouse figures open the citation panel, news claims link the cached source.

Research dossiers exist for 50 of 1,938 programs — the 50 largest fully J-book-detailed programs by FY2026 request. why no dossier here? →

What it is

  • Future Long Range Assault Aircraft Development (program element 0605241A) is a U.S. Army development program funded in the Research, Development, Test and Evaluation, Army account.
  • The program directly aligns to the Future Vertical Lift (FVL) Army modernization priority, an initiative to develop a family of vertical-lift aircraft for the U.S. Armed Forces and to retain long-term industrial-base capabilities.
  • The Future Long Range Assault Aircraft (FLRAA) is the next-generation vertical-lift aircraft designed to conduct air assault, urban assault and security, maritime interdiction, medical evacuation, humanitarian assistance and disaster relief, tactical resupply, direct action, noncombatant evacuation, and combat search and rescue in a contested, near-peer threat environment.
  • FLRAA is intended to give Combatant Commanders deterrence, power projection, and tactical capabilities at operational and strategic distances, with significantly increased range, speed, mobility, and payload over current Army and Special Operations Command aircraft.
  • The Army competitively awarded the FLRAA weapon-system development contract in December 2022 using a hybrid acquisition approach, and the aircraft integrates advanced technologies using a modular open systems approach with design trades to ensure affordability.
  • A dedicated MEDEVAC effort designs, develops, and integrates medical-evacuation mission equipment for FLRAA, including a Mission Equipment Package with a casualty-acquisition sensor and a modular, reconfigurable Patient Handling System to provide en-route critical care on the future battlefield.

Why it matters

  • The program's total funding is roughly flat year over year, moving from $1,253,637 thousand in FY2025 to $1,248,544 thousand (about $1.25 billion) requested for FY2026.
  • That is a small year-over-year decrease of $5,093 thousand (about $5.1 million) from FY2025 to FY2026.
  • The entire FY2026 request of $1,248,544 thousand is discretionary funding; there is no reconciliation (mandatory) component in this program element.
  • The FY2026 budget request funds design updates, continues manufacturing of Prototype and Limited User Test (LUT) aircraft, initiates testing, begins production planning, and continues refinement of a digital backbone architected to meet Modular Open System Approach objectives.
  • In FY2024, FLRAA achieved a successful Milestone B decision, allowing the program to enter the Engineering and Manufacturing Development (EMD) phase.
  • In FY2025, funding previously planned in PE 0603801A (Aviation - Advanced Development), Project B47 (Future Vertical Lift), transitioned into this program element's Project DG5 to execute Engineering and Manufacturing Development after the Milestone B decision.

Key players

  • The program is run by the U.S. Army, with funding drawn from the Research, Development, Test and Evaluation, Army appropriation.
  • The Army established a Future Vertical Lift Cross Functional Team (CFT) after identifying FVL as one of the Army's six modernization priorities in FY 2017, and the effort traces to the Deputy Secretary of Defense's 2012 FVL Strategic Plan outlining a joint approach for the services' next generation of vertical-lift aircraft.
  • FLRAA is intended to support the Army, U.S. Special Operations Command (USSOCOM), and the Joint Force, reflecting the program's cross-service user community.

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.