Skip to content
Fiscal Receipts

Strategic Mid-Range Capability

ArmyRDT&EReconciledPE0605235A
What it is
Strategic Mid-Range Capability (0605235A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
+$3.48M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$255.1MR-1 TOA · PB2026
FY25 Total
$182.8MR-1 TOA · PB2026
FY26 Request
$186.3MR-1 TOA · PB2026
FY25→26 Change
+$3.48MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $255.1MFY25: $182.8MFY26: $186.3MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$255.1M
FY25$182.8M
FY26$186.3M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

6 fiscal years of this program as published (FY2021–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
6 fiscal years of this program as published (FY2021–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY21FY22FY23FY24FY25FY26
Actuals$0$0$4.83M$255.1M
Enacted–$0$5.02M$348.9M$182.8M
Request––$5.02M$348.9M$182.8M$186.3M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $348.9M for FY2024; the PB2026 book reported $255.1M as actual total obligation authority — $93.7M below the request. 255.12 − 348.85 = -93.73 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Strategic Mid-Range Capability

This funding line is directly aligned to the Army Long-Range Precision Fires Modernization Priority. The Mid-Range Capability (MRC) Weapon System leverages other service technologies and integration of common hardware, software, and mutually supporting test events. MRC provides ground support equipment to include a Battery Operations Center (BOC) with support vehicles, launcher Payload Deployment System (PDS), and reload support to fire a mix of missiles capable of engaging strategic targets at mid-range distances. MRC leverages existing Standard Missile-6 (SM-6) and Tomahawk technology to include command and control systems and missile variants to provide a responsive, highly accurate capability designed for high value targets. The MRC is a ground launched, long-range precision fires offensive weapon system to defeat Anti-Access/Area-Denial (A2/AD) threats and other high value targets to enable warfighter dominance in support of Long-Range Precision Fires, Multi-Domain Operations, and Joint Force objectives. Four MRC batteries will be developed and fielded to Long-Range Fires Battalions 1 through 4. The initial prototype MRC battery was developed and fielded by Rapid Capabilities and Critical Technologies Office and three additional MRC batteries by Program Executive Office Missiles and Space utilizing RDT&E funds. The first MRC prototype weapon system battery, delivered in FY 2023 as the first unit of issue, provided residual combat capability consisting of one BOC, four launchers, one BOC Support Vehicle, and a reload capability. Also delivered was the basic load of missiles consisting of eight Tomahawk Block V and eight SM-6 Block IA. Follow-on delivery of the next three batteries (Battery 2 through 4) utilizes RDT&E under a Middle Tier of Acquisition Rapid Prototyping pathway. FY 2026 funding continues all aspects of developing MRC technology upgrades. Provides the prototype systems with iterative survivability, reliability, and operational effectiveness improvements based on evolving system requirements to ensure operational effectiveness. Base funding allows for continued development of system improvements utilizing evaluation, design, prototyping, testing, engineering, configuration management, component and system-level qualification activities, operational demonstrations, operator/maintainer training development, and integration of all functional support to ensure operational safety and effectiveness of all fielded and in-development systems meet performance needs. The Army is redesigning the BOC with a smaller footprint to support greater battlefield maneuverability and survivability. The redesigned BOC will feature a smaller form factor to enhance mobility, transportability, and interoperability with other system components aligned to mission requirements. This effort includes design, integration, and testing activities to ensure the improved BOC meets established system objectives and maintains operational effectiveness. The redesigned BOC will be implemented with the delivery of Battery 4. The FY 2026 cost of the Mid-Range Capability (MRC) Air Launched Effects (ALE) Middle Tier of Acquisition effort is $143 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. The FY 2026 request was reduced by $3.465 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative.

Mission — Mid-Range Capability

This funding line is directly aligned to the Army Long-Range Precision Fires Modernization Priority. The Mid-Range Capability (MRC) Weapon System leverages other service technologies and integration of common hardware, software, and mutually supporting test events. MRC provides ground support equipment to include a Battery Operations Center (BOC) with support vehicles, launcher Payload Deployment System, and reload support to fire a mix of missiles capable of engaging strategic targets at mid-range distances. MRC leverages existing Standard Missile-6 (SM-6) and Tomahawk technology to include command and control systems and missile variants to provide a responsive, highly accurate capability designed for high value targets. The MRC is a ground launched, long-range precision fires?offensive weapon system to defeat Anti-Access/Area-Denial (A2/AD) threats and other high value targets to enable?warfighter dominance in support of Long-Range Precision Fires, Multi-Domain Operations, and Joint Force objectives. Four MRC batteries will be developed and fielded to Long-Range Fires Battalions 1 through 4. The initial prototype MRC battery was developed and fielded by Rapid Capabilities and Critical Technologies Office and three additional MRC batteries by Program Executive Office Missiles and Space utilizing RDT&E funds. The first MRC prototype weapon system battery, delivered in FY 2023 as the first unit of issue, provided residual combat capability consisting of one BOC, four launchers, one BOC Support Vehicle, and a reload capability. Also delivered was the basic load of missiles consisting of eight Tomahawk Block V and eight SM-6 Block IA. Follow-on annual delivery of the next three batteries (Battery 2 through 4) will be with RDT&E under a Middle Tier of Acquisition Rapid Prototyping pathway. FY 2026 Base funding in the amount of $186.304 million continues all aspects of developing MRC technology upgrades. Provides the prototype systems with iterative survivability, reliability, and operational effectiveness improvements based on evolving system requirements to ensure operational effectiveness. Base funding allows for continued development of system improvements utilizing evaluation, design, prototyping, testing, engineering, configuration management, component and system-level qualification activities, operational demonstrations, operator/maintainer training development, and integration of all functional support to ensure operational safety and effectiveness of all fielded and in-development systems meet performance needs. The Army is redesigning the BOC with a smaller footprint to support greater battlefield maneuverability and survivability. The redesigned BOC will feature a smaller form factor to enhance mobility, transportability, and interoperability with other system components aligned to mission requirements. This effort includes design, integration, and testing activities to ensure the improved BOC meets established system objectives and maintains operational effectiveness. The redesigned BOC will be implemented with the delivery of Battery 4. The FY 2026 cost of the Mid-Range Capability (MRC) Middle Tier of Acquisition effort is $143.0 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission.

Justification

Accomplishments & Planned Programs (1)

Mid-Range Capability Prototype Program

This effort will perform prototype technology research, development, demonstration, and integration of common hardware, software, and test events for mid-range fires. This includes integration of multi-service technology and upgrades to the BOC, launchers, reload trailers, support vehicles, and associated equipment necessary to deliver and sustain fully operational prototype systems. The program activities align with Army mission focused priorities for multi-domain, joint operations and readiness. Investments focus on technology development and system engineering efforts including, but are not limited to technologies to enhance survivability, operability, reliability, and performance of personnel in a threat environment.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$255.1M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$182.8M
Research, Development, Test and Evaluation, ArmyAFY25 Total$182.8M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$186.3M
Research, Development, Test and Evaluation, ArmyAFY26 Total$186.3M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$255.1M$182.8M$186.3M$186.3M
CQ4: Mid-Range Capability$255.1M$182.8M$186.3M$186.3M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONW31P4Q25C0023medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

GAO oversight of this program

GAO assessed Mid-Range Capability (MRC) in its June 2025 Weapon Systems Annual Assessment, as an Army MTA program.

“The Army is developing an offensive, ground-based MRC weapon system to bridge a capability gap between systems designed for short- and long-range fires. MRC is leveraging existing Navy Standard Missile - 6 and Tomahawk cruise missile technology and modifying the Navy's ship-based vertical launching system for containerized use with existing Army vehicles. The Army's Rapid Capabilities and Critical Technologies Office (RCCTO) delivered the first MRC battery in September 2023 through a prototype development effort. The Army, through Program Executive Office Missiles and Space, intends to deliver batteries 2 through 4 during the current MTA rapid prototyping effort, and battery 5 during a follow-on MTA rapid fielding effort.”

GAO-25-107569, p. 109 — the assessment page in GAO’s 2025 report

Earlier editions of the same assessment: June 2024

GAO assessed Mid-Range Capability (MRC) in its June 2024 Weapon Systems Annual Assessment, as an Army MTA program.

“The Army is developing an offensive, ground-based MRC weapon system to bridge a capability gap between systems designed for short- and long- range fires. MRC is leveraging existing Navy Standard Missile (SM)-6 and Tomahawk cruise missile technology and modifying the Navy's ship-based vertical launching system (VLS) for containerized use with existing Army vehicles. The Army intends to deliver three MRC batteries under the current MTA rapid prototyping effort no later than fiscal year 2026.”

GAO-24-106831, p. 117 — the assessment page in GAO’s 2024 report

GAO assessed the program, not this budget line. Strategic Mid-Range Capability is one of the lines that funds it, and GAO’s work above says nothing about this line’s own figures. Which line each GAO item attaches to is a hand-ratified crosswalk — how it was checked.

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Strategic Mid-Range Capability. GAO's program-level work on this line is above. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.