What it is
Hypersonics EMD (0605232A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
+$43.3M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$772.2MR-1 TOA · PB2026
FY25 Total
$469.8MR-1 TOA · PB2026
FY26 Request
$513.0MR-1 TOA · PB2026
FY25→26 Change
+$43.3MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $772.2MFY25: $469.8MFY26: $513.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$772.2M
FY25$469.8M
FY26$513.0M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

7 fiscal years of this program as published (FY2020–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
7 fiscal years of this program as published (FY2020–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY20FY21FY22FY23FY24FY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$107.4M$533.5M$772.2M
Enacted–$0$111.5M$633.5M$900.9M$469.8M
Request––$111.5M$633.5M$900.9M$538.0M$513.0M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $900.9M for FY2024; the PB2026 book reported $772.2M as actual total obligation authority — $128.7M below the request. 772.2 − 900.9 = -128.7 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Hypersonics EMD

This funding supports the fielding of critical enabling technologies and capabilities that address near-term and mid-term threats. It is directly aligned to the Army Long Range Precision Fires modernization priority. This Program Element includes the development and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW and conducting Joint Flight Campaign (JFC) tests to evaluate overall system performance with added focus on missile body and payload performance. The LRHW system consists of the All Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5 inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains eight AUR+Cs, one BOC, and four TELs each carrying two AUR+Cs. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). Continued RDT&E investment is required beyond the initial prototype Battery to meet objective requirements and to maintain overmatch against evolving threats. Through implementation of planned Technology Insertions (TIs), the program will increase capability, upgrade the system to address obsolescence, and upgrade platform, launcher, and weapon control systems with mature technologies from Science and Technology (S&T). Qualification testing is also required to validate these developmental changes. Soldier operational testing of new capability is also required. The FY 2026 cost of the Long Range Hypersonic Weapon (LRHW) Ground Support Equipment (GSE) Middle Tier of Acquisition effort is $17.9 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. The FY 2026 request was reduced by $1 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Mission — Hypersonic Weapon (LRHW)

This funding supports the fielding of critical enabling technologies and capabilities that address near-term and mid-term threats. It is directly aligned to the Army Long Range Precision Fires modernization priority. The LRHW system consists of the All Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5 inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains eight AUR+Cs, one BOC, and four TELs each carrying two AUR+Cs. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). This Program Element includes the development and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW and conducting Joint Flight Campaign (JFC) tests to evaluate overall system performance, with added focus on missile body and payload performance as well as incorporate capability improvements. Continued RDT&E investment is required beyond the initial prototype Battery to meet objective requirements and to maintain overmatch against evolving threats. Through implementation of planned Technology Insertions (TIs), the program will increase capability, upgrade the system to address obsolescence, and upgrade platform, launcher, and weapon control systems with mature technologies from Science and Technology (S&T). Qualification testing is required to validate these developmental changes. Soldier operational testing of new capability is also required. The FY 2026 cost of the Long Range Hypersonic Weapon (LRHW) Ground Support Equipment (GSE) Middle Tier of Acquisition effort is $17.9 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. FY 2026 funding provides for incremental funding of AUR+C test assets and AUR+C tactical loads and reloads, developmental engineering for GSE TI integration, funding for test activities and events, and systems engineering and program management.

Justification

Accomplishments & Planned Programs (5)

All Up Round and Canister (AUR+C)

All Up Round plus Canister (AUR+C) Technology development, purchase of hardware, integration, assembly, test and delivery of the AUR+C.

Common Hypersonic Glide Body (CHGB)

Common Hypersonic Glide Body (CHGB) with Thermal Protection System (TPS) Development, purchase of hardware, integration, assembly, test and delivery of the CHGB system for the AUR+C. Remain technologically capable to support CHGB production for requiring services.

Ground Support Equipment (GSE)

Provides for planning and integration efforts for LRHW GSE, LRHW technology development and deployment, and additional training development (enhances existing and incorporates detailed operator and maintainer skills). Designs training aid devices, simulations, and simulator in accordance with the system training plan. Develops the overall Systems Integration and training for the AUR+C and the TI-22 AURTA (LTL-1) capability in the LRHW System Integration Laboratory (LSIL) in supports of JFC-5C mission execution for the LRHW program.

Test and Evaluation

Test and Evaluation Test and evaluation includes test planning, execution and analysis of Joint Flight Campaigns (JFC) and Army operational and developmental tests.

System Engineering/Program Management

Includes the Government PM's office (civilian, SETA, and matrix personnel), OGAs, and software licenses/maintenance to support RDT&E efforts

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$772.2M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$469.8M
Research, Development, Test and Evaluation, ArmyAFY25 Total$469.8M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$513.0M
Research, Development, Test and Evaluation, ArmyAFY26 Total$513.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$772.2M$469.8M$513.0M$513.0M
HX2: Hypersonic Weapon (LRHW)$772.2M$469.8M$513.0M$513.0M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Hypersonics EMD. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.