Printed from https://fiscalreceipts.com/program/0605232A/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Hypersonics EMD
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $772.2M
- FY25
- $469.8M
- FY26
- $513.0M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $107.4M | $533.5M | $772.2M | ||
| Enacted | – | $0 | $111.5M | $633.5M | $900.9M | $469.8M | |
| Request | – | – | $111.5M | $633.5M | $900.9M | $538.0M | $513.0M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $900.9M for FY2024; the PB2026 book reports $772.2M actually spent — $128.7M below the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Hypersonic Weapon (LRHW)
This funding supports the fielding of critical enabling technologies and capabilities that address near-term and mid-term threats. It is directly aligned to the Army Long Range Precision Fires modernization priority. The LRHW system consists of the All Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5 inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains eight AUR+Cs, one BOC, and four TELs each carrying two AUR+Cs. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). This Program Element includes the development and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW and conducting Joint Flight Campaign (JFC) tests to evaluate overall system performance, with added focus on missile body and payload performance as well as incorporate capability improvements. Continued RDT&E investment is required beyond the initial prototype Battery to meet objective requirements and to maintain overmatch against evolving threats. Through implementation of planned Technology Insertions (TIs), the program will increase capability, upgrade the system to address obsolescence, and upgrade platform, launcher, and weapon control systems with mature technologies from Science and Technology (S&T). Qualification testing is required to validate these developmental changes. Soldier operational testing of new capability is also required. The FY 2026 cost of the Long Range Hypersonic Weapon (LRHW) Ground Support Equipment (GSE) Middle Tier of Acquisition effort is $17.9 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. FY 2026 funding provides for incremental funding of AUR+C test assets and AUR+C tactical loads and reloads, developmental engineering for GSE TI integration, funding for test activities and events, and systems engineering and program management.
Mission — Hypersonics EMD
This funding supports the fielding of critical enabling technologies and capabilities that address near-term and mid-term threats. It is directly aligned to the Army Long Range Precision Fires modernization priority. This Program Element includes the development and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW and conducting Joint Flight Campaign (JFC) tests to evaluate overall system performance with added focus on missile body and payload performance. The LRHW system consists of the All Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5 inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains eight AUR+Cs, one BOC, and four TELs each carrying two AUR+Cs. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). Continued RDT&E investment is required beyond the initial prototype Battery to meet objective requirements and to maintain overmatch against evolving threats. Through implementation of planned Technology Insertions (TIs), the program will increase capability, upgrade the system to address obsolescence, and upgrade platform, launcher, and weapon control systems with mature technologies from Science and Technology (S&T). Qualification testing is also required to validate these developmental changes. Soldier operational testing of new capability is also required. The FY 2026 cost of the Long Range Hypersonic Weapon (LRHW) Ground Support Equipment (GSE) Middle Tier of Acquisition effort is $17.9 million, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. The FY 2026 request was reduced by $1 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Justification
Accomplishments & Planned Programs (5)
All Up Round and Canister (AUR+C)
All Up Round plus Canister (AUR+C) Technology development, purchase of hardware, integration, assembly, test and delivery of the AUR+C.
System Engineering/Program Management
Includes the Government PM's office (civilian, SETA, and matrix personnel), OGAs, and software licenses/maintenance to support RDT&E efforts
Test and Evaluation
Test and Evaluation Test and evaluation includes test planning, execution and analysis of Joint Flight Campaigns (JFC) and Army operational and developmental tests.
Ground Support Equipment (GSE)
Provides for planning and integration efforts for LRHW GSE, LRHW technology development and deployment, and additional training development (enhances existing and incorporates detailed operator and maintainer skills). Designs training aid devices, simulations, and simulator in accordance with the system training plan. Develops the overall Systems Integration and training for the AUR+C and the TI-22 AURTA (LTL-1) capability in the LRHW System Integration Laboratory (LSIL) in supports of JFC-5C mission execution for the LRHW program.
Common Hypersonic Glide Body (CHGB)
Common Hypersonic Glide Body (CHGB) with Thermal Protection System (TPS) Development, purchase of hardware, integration, assembly, test and delivery of the CHGB system for the AUR+C. Remain technologically capable to support CHGB production for requiring services.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $772.2M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $469.8M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $469.8M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $513.0M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $513.0M |
Budget Details(R-2/P-40 facts)
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| HX2: Hypersonic Weapon (LRHW) | $772.2M | $469.8M | $513.0M | $513.0M |
| Program Element | $772.2M | $469.8M | $513.0M | $513.0M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →