FRDT&EPartial Reconciliation0605223F
What it is
Advanced Pilot Training — a research & development program run by Air Force.
What changed
-$76.2M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$58.8M
FY25 Total
$248.6M
FY26 Request
$172.4M
FY25→26 Change
-$76.2M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $58.8MFY25: $248.6MFY26: $172.4MFY24FY25FY26
FY24
$58.8M
FY25
$248.6M
FY26
$172.4M
Decade view — each figure cites its own President's Budget edition
FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$8.20M$10.4M$7.11M$82.6M$236.8M$328.4M$216.8M$182.3M$32.5M$58.8M
Enacted$10.4M$12.4M$106.0M$245.5M$340.4M$248.2M$188.9M$33.6M$77.3M$248.6M
Request$12.4M$106.0M$265.5M$348.5M$248.7M$188.9M$37.1M$77.3M$84.0M$172.4M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2021 book requested $248.7M for FY2021; the PB2023 book reports $216.8M actually spent — $31.9M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Advanced Trainer Replacement T-7A

The Advanced Pilot Training (APT)/T-7A Red Hawk program will replace the Air Education Training Command's (AETC) aging T-38C fleet with new aircraft, Ground Based Training System (simulators, training devices, computer based training systems, academics, etc.), Maintenance Training System, and support infrastructure currently used in the fighter/bomber advanced Specialized Undergraduate Pilot Training track as well as in the Introduction to Fighter Fundamentals program. The APT/T-7A Red Hawk program acquisition strategy was approved by OSD (AT&L) in December 2016. In addition, the APT/T-7A Red Hawk Team completed their Development Request for Proposal (RFP) Release Defense Acquisition Board and subsequently released the RFP to industry on 30 December 2016. The Program completed source selection evaluations and Milestone B and awarded a Fixed Price Incentive Firm (FPIF) Indefinite Delivery/Indefinite Quantity (ID/IQ) contract to The Boeing Company on 27 September 2018. The Maintenance Training System (MTS) effort is a Delivery Order under a separate ID/IQ Contract and was competitively awarded on 11 April 2025 to Pinnacle Solutions, LLC. The T-7A MTS will provide maintainers with the foundational skills and core competencies required to maintain the T-7A aircraft and its associated subsystems. The MTS will be a blended training solution to include: a.) a suite of Maintenance Training Devices (MTDs) with associated support equipment; b.) Interactive Multimedia Instruction (IMI)/courseware and training material; c.) smart classrooms to facilitate instructor-led training; and d.) support environments to manage training schedules, student data, and updates to all training capabilities. The T-7A MTS program will encompass the design, development, integration, and test of the most efficient and effective combination of training capabilities, as well as Contractor Logistics Support (CLS) performance. Funding contained in this platform's documentation directly aids AETC flying training enterprise to continue its overall future pilot production increase that began in FY 2020, thus reducing the USAF Pilot Shortage. The service originally planned to award Boeing its first Low Rate Initial Production (LRIP) production contract to build the seven T-7s in FY 2025. The service will now award a contract for 14 LRIP Aircraft in FY 2026 under a revised acquisition strategy . This new strategy will procure four additional T-7 production Relevant Test Vehicles (PRTVs) using FY 2025 research and development funds that will be delivered in FY 2026. The Incentive Strategy will expedite closure of EMD testing, increase Boeing's production readiness at its facility in St Louis, MS, and accelerate entrance into Initial Operational Test and Evaluation (IOT&E) at Randolph Air Force Base in Texas. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. This program element may include necessary civilian pay expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program element 0605829F, 0605831F, 0605833F, or 0605898F. In FY 2024 $2.423 million was expended for civilian pay expenses in this program element, and in FY 2025 $2.695 million is forecasted for civilian pay expenses in this program element. The FY 2026 request was reduced by $1.814 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative." This program is in Budget Activity 5, System Development and Demonstration (SDD) because it has passed Milestone B approval and is conducting engineering and manufacturing development tasks aimed at meeting validated requirements prior to full rate production.

Justification

Accomplishments & Planned Programs (1)

Advanced Pilot Training (APT) Program

The Advanced Pilot Training (APT) / T-7A Red Hawk program has an approved acquisition strategy, completed Milestone B, and has progressed into the Engineering and Manufacturing Development (EMD) phase. The effort includes development, test, studies, analysis, acquisition documentation, market research activities, and engineering changes to reduce risk and support the acquisition strategy and engineering and manufacturing development.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY24 Actuals$58.8M
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$248.6M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$248.6M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$172.4M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$172.4M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.07B$58.8M$248.6M$172.4M$172.4M
655340: Advanced Trainer Replacement T-7A$1.07B$58.8M$248.6M$172.4M$172.4M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.