Printed from https://fiscalreceipts.com/program/0605051A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Aircraft Survivability Development
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $24.0M |
| FY25 | $38.2M |
| FY26 | $44.2M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $77.4M | $121.5M | $169.8M | $56.1M | $130.2M | $99.4M | $60.1M | $18.4M | $24.0M | ||
| Enacted | $78.1M | $124.2M | $61.0M | $56.9M | $132.5M | $99.2M | $61.8M | $19.1M | $24.9M | $38.2M | ||
| Request | $114.2M | $61.0M | $56.9M | $142.0M | $100.5M | $65.6M | $19.1M | $24.9M | $38.2M | $44.2M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2018 book requested $61.0M for FY2018; the PB2020 book reported $169.8M as actual total obligation authority — $108.8M above the request. 169.8 − 61.0 = 108.8 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Aircraft Survivability Development
This funding line is a key enabler of the Army Modernization Priorities in support of the Aircraft Survivability Equipment (ASE) as well as Future Long-Range Assault Aircraft (FLRAA). The Aircraft Survivability Development program includes Projects titled Aircraft Survivability Equipment Development (ER7), Common Missile Warning System (CMWS) (ER8), and Improved Threat Detection System (ITDS) (ITD). This program previously included funding for Joint Urgent Operational Needs Statement (JUONS) SO-0010, Headquarters Department of the Army (HQDA) Directed Requirement for Advanced Threat Warner (ATW) portion of Phase 3 ATW/Common Infrared Countermeasures Quick Reaction Capability (ATW/CIRCM QRC), and Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC). As of FY2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. ER7: Aircraft Survivability Development. The objective of the ASE Development project is to improve Radio Frequency (RF) ASE for Army Aviation. APR-39 Radar Warning Receiver (RWR) detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. The Milestone Decision Authority (MDA) approved Phases 1 and 2 of a 3-phased path forward. Phase 1, APR-39C(V)1/4, serves as an obsolescence / sustainment upgrade to the Processor Line Replaceable Unit (LRU) for AN/APR-39A(V) RWR implemented to ensure that the currently fielded system remains viable until affordable improved RF ASE capability can be pursued in Phases 2 and 3. Phase 2A is RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 will significantly improve the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, Modernized Radar Warning Receiver (MRWR), is an Army Engineering Change Proposal (ECP) to APR-39D(V)2, approved in the Acquisition Decision Memorandum (ADM) signed June 24, 2019. This ECP will implement enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats faced by legacy platforms in a near peer contest. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA. Phase 3 adds active Radio Frequency Electronic Countermeasures (RF-ECM) capability for selected aircraft with Material Development Decision (MDD) planned in the future. Justification: FY 2026 Base RDT&E funding of $8.159 million supports APR-39E(V)2 Hardware and Software System Development, and Systems Engineering and Program Management (SEPM). ER8: Common Missile Warning System (CMWS). The CMWS program is a missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR)-seeking missiles and will alert aircrews to the presence of certain incoming munitions. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and IR Laser Jamming (currently Common Infrared Countermeasures (CIRCM) -multiple platforms and Advanced Threat Infrared Countermeasures (ATIRCM)-equipped CH-47 platform only). In addition, CMWS ECU receives munitions detection data from the EOMS which it also passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. CMWS Generation 3 (Gen 3) ECU in conjunction with ongoing software development efforts will address outstanding materiel release conditions and ensure protection against emerging IR-guided missile threats. Due to evolving threats, CMWS will remain in the Army inventory until replaced by a future program. Continuing systems engineering, integration, and testing along with software support will maintain capability to rapidly respond as threats evolve in order to ensure protection against IR-guided missile threats. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. As of FY 2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. LIMWS QRC addresses the HQDA Directed Requirement to provide a greater capability than CMWS, the current program, to bridge the gap between CMWS and the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is required to provide increased detection range, improved detection in clutter, more agile algorithms to rapidly respond to emerging threats, and eliminates the need for sensor alignments. Justification: CMWS/LIMWS QRC: FY 2026 Base RDTE dollars in the amount of $4.681 million will fund Algorithm Analysis, Threat and Vulnerability Analysis, and Systems Engineering and Program Management (SEPM). ITD: Improved Threat Detection System (ITDS). The ITDS (Improved Threat Detection System) budget line includes funding to support the development and integration of improved Aircraft Survivability Equipment (ASE) products onto current US Army Aviation platforms as well as Future Long Range Assault Aircraft (FLRAA) and future platforms. ITDS will detect, classify, cue, and declare on existing and emerging Electro-Optical/Infra-red (EO/IR) Guided Man-Portable Air Defense Systems (MANPADS), Class I - IV Drones, Loitering Ammunitions, Rocket Propelled Grenades (RPG)/ unguided rockets, Anti-Tank Guided Missiles (ATGM), Ballistic munitions, Unmanned Aerial System (UAS), and Lasers. ITDS will provide missile threat handoff to the appropriate countermeasure system (Common Infrared Countermeasure (CIRCM) and/or expendable countermeasure). ITDS will explore opportunities to improve the expendable countermeasure system. ITDS will use an incremental approach to align with PM ASE's System of Systems approach, align both agnostic detect and defeat capabilities, implement a modular open system architecture, integrate to the FLRAA digital backbone, improve full coverage against evolving threats in hostile environments, support counter UAS, and incorporate multi-function sensor suite to support other aircraft enabling technologies. Additional key attributes include: Geo-location of threats, Support Degraded Visual Environment and Navigation, Multiple Threat Detection, Declaration for Simultaneous Warning. Justification: ITDS: FY2026 Base RDTE dollars in the amount of $31.342 million will fund design and demonstration testing, prototype application hosting, sensor characterization and flight test, digital simulation modelling assessments, aircraft integration strategies, reliability, prototypes, manufacturing, and technical readiness assessments. References: - Joint Staff, J-8 Deputy Director for Requirements (DOR) memorandum, April 24, 2015 - Phase 2a SOCOM JUONs SO-0010, Joint Rapid Acquisition Cell (JRAC) memorandum, May 29, 2015 - Directed Requirement for the Phase 3 Advanced Threat Warner and Common Infrared Countermeasure Quick Reaction Capability (ATW/CIRCM QRC) to Support Joint Urgent Operational Need (JUON) SO-0010, CIRCM Critical Intelligence Parameters Breach, December 18, 2015 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, March 26, 2017 - Update to the Directed Requirement for the United States Special Operations Command Joint Urgent Operational Needs SO-0010 Threat Detection and Countermeasures to Enemy Man Portable Air Defense System Capability, November 16, 2018 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, November 16, 2018 - Aircraft Survivability Equipment (ASE) Modernization Fielding Guidance, Change 1, November 19, 2018 - Acquisition Decision Memorandum (ADM) for Radio Frequency (RF) Project Manager Aircraft Survivability Equipment (PM ASE) Engineering Change Proposal (ECP) for Radar Warning Receiver AN/APR39-D(V)2 to AN/APR39-E(V)2, June 24, 2019 by PEO IEW&S. - MDD Request for the ITDS Program of Record, Aviation Capability Development and Integration Directorate (Aviation CDID), 6 July 2021. - MDD Request for the ITDS Program of Record, DCS, G-8, 14 March 2022. - Assignment of an Army Office of Primary Responsibility (OPR) for the ITDS Capability, Assistant Secretary of the Army (Acquisition, Logistics and Technology) (ASA(ALT)), 18 April 2022. - Improved Threat Detection Investment Acquisition Decision Memorandum (ADM), ASA(ALT), 1 July 2024. The FY 2026 request was reduced by $0.91 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."
Mission — Aircraft Survivability Equipment Development
This funding line is a key enabler of the Army Modernization Priorities in support of FLRAA. The objective of the ASE Development project is to improve RF ASE for Army aviation. APR-39 RWR detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. The MDA approved Phases 1 and 2 of a 3-phased path forward. Phase 1, APR-39C(V)1/4, serves as an obsolescence / sustainment upgrade to the Processor LRU of APR-39A(V) RWR implemented to ensure that the currently fielded system remains viable until affordable improved RF ASE capability can be pursued in Phases 2 and 3. Phase 2A is where RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 significantly improves the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, MRWR, is an Army ECP to APR-39D(V)2, approved in the ADM signed June 24, 2019. This ECP implements enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA and the Enduring Fleet. Phase 3 adds Radio Frequency Electronic Counter Measures (RFECM) focusing on detecting and jamming incoming RF signals. RFCM will provide aircraft with an extra level of security against RF threats to include UAS/Drone technology. Justification: FY 2026 Base RDT&E funding of $8.159 million supports APR-39E(V)2 Hardware and Software System Development, and Systems Engineering and Program Management.
Mission — Common Missile Warning System (CMWS)
The Common Missile Warning System (CMWS) program is a missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR) seeking missiles and will alert aircrews to the presence of certain incoming munitions. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by the CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and IR Laser Jamming (currently Common Infrared Countermeasures (CIRCM) and Advanced Threat Infrared Countermeasures (ATIRCM) equipped CH-47 platform only). In addition, CMWS ECU receives munitions detection data from the EOMS which it also passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. The CMWS Generation 3 (Gen 3) ECU in conjunction with ongoing software development efforts will address outstanding materiel release conditions and ensure protection against emerging IR-guided missile threats. Due to evolving threats, CMWS will remain in the Army inventory until replaced by a future program. Continuing systems engineering, integration, and testing along with software support will maintain capability to rapidly respond as threats evolve in order to ensure protection against IR-guided missile threats. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. As of FY 2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. Phase 4 Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC) addresses the Headquarters Department of the Army (HQDA) Directed Requirement to provide a greater capability than CMWS, the current Program of Record (POR), to bridge the gap between CMWS and the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is required to provide increased detection range, improved detection in clutter, more agile algorithms to rapidly respond to emerging threats, and eliminates the need for sensor alignments. CMWS/LIMWS QRC: FY 2026 Base RDTE dollars in the amount of $4.681 million will fund Sensor and Algorithm Analysis, Threat and Vulnerability Analysis, and Systems Engineering and Program Management (SEPM).
Mission — Improved Threat Detection System (ITDS)
The ITDS (Improved Threat Detection System) budget line includes funding to support the development and integration of improved Aircraft Survivability Equipment (ASE) products onto current US Army Aviation platforms as well as Future Long Range Assault Aircraft (FLRAA) and future platforms. ITDS will detect, classify, cue, and declare on existing and emerging Electro-Optical/Infra-red (EO/IR) Guided Man-Portable Air Defense Systems (MANPADS), Drone Class I - IV, Loitering Ammunitions, Rocket Propelled Grenades (RPG)/ unguided rockets, Anti-Tank Guided Missiles (ATGM), Ballistic munitions, Unmanned Aerial System (UAS), and Lasers. ITDS will provide missile threat handoff to the appropriate countermeasure system (Common Infrared Countermeasure (CIRCM) and/or expendable countermeasure). ITDS will explore opportunities to improve the expendable countermeasure system. ITDS will use an incremental approach to align with PM ASE's System of Systems approach, align both agnostic detect and defeat capabilities, implement a modular open system architecture, integrate to the FLRAA digital backbone, improve full coverage against evolving threats in hostile environments, support counter UAS, and incorporate multi-function sensor suite to support other aircraft enabling technologies. Additional key attributes include: Geo-location of threats, Support Degraded Visual Environment and Navigation, Multiple Threat Detection, Declaration for Simultaneous Warning. Justification: ITDS: FY2026 Base RDTE dollars in the amount of $31.342 million will fund design and demonstration testing, prototype application hosting, sensor characterization and flight test, digital simulation modelling assessments, aircraft integration strategies, reliability, manufacturing, and technical readiness assessments. References: - MDD Request for the ITDS Program of Record, Aviation Capability Development and Integration Directorate (Aviation CDID), 6 July 2021. - MDD Request for the ITDS Program of Record, DCS, G-8, 14 March 2022. - Assignment of an Army Office of Primary Responsibility (OPR) for the ITDS Capability, Assistant Secretary of the Army (Acquisition, Logistics and Technology) (ASA(ALT)), 18 April 2022. - Improved Threat Detection Investment Acquisition Decision Memorandum (ADM), ASA(ALT), 1 July 2024.
Justification
Accomplishments & Planned Programs (4)
Phase 2 Radio Frequency Countermeasure (CM)
Phase 2A is RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 will significantly improve the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, MRWR, is an Army ECP to APR-39D(V)2, approved in the ADM signed June 24, 2019. This ECP will implement enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA.
CMWS Product Development and Management Services
Research Development Test and Evaluation (RDTE) funding supports continuing development engineering threat and vulnerability analysis, Systems Engineering and Program Management (SEPM), and integration with other ASE Systems.
Phase 4 LIMWS QRC
Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC) is a follow-on solution to the Joint Urgent Operational Needs Statement (JUONS) SO-0010 to provide a greater capability than the current Program of Record (POR), Common Missile Warning System (CMWS), until the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is a Chief of Staff of the Army approved Directed Requirement issued by Army G-8 on March 26, 2017. LIMWS QRC provides an enhanced missile warning system to detect emerging and evolving enemy Man Portable Air Defense Systems (MANPADS) threats.
ITDS Product Development and Management Services
ITDS will use an incremental approach to align with PM ASE's System of Systems approach, including both detect and defeat capabilities, and integrate it onto an open system architecture digital backbone, improving full coverage against evolving threats in hostile environments.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $24.0M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $38.2M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $38.2M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $44.2M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $44.2M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $24.0M | $38.2M | $44.2M | $44.2M |
| ER7: Aircraft Survivability Equipment Development | $14.6M | $4.70M | $8.16M | $8.16M |
| ER8: Common Missile Warning System (CMWS) | $9.37M | $5.10M | $4.68M | $4.68M |
| ITD: Improved Threat Detection System (ITDS) | — | $28.4M | $31.3M | $31.3M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
2 mentions from the Senate LDA disclosure database.
Department of Defense Appropriations Act of 2024 (HR 4365/S 2587; PL 118-47) and Further Consolidated Appropriations…
Department of Defense Appropriations Act of 2025 (HR 8774/S XXXX); provisions regarding R&D-Army, Navy/USMC, Air…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Aircraft Survivability Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J142
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J124
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J135
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J138
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J161
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J168
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J137
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J135
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J134
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J132
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 3 - Budget Activity 5A · www.asafm.army.mil
PDF page 332