Aircraft Survivability Development

ARDT&EFully Reconciled0605051A
What it is
Aircraft Survivability Development — a research & development program run by Army.
What changed
+$5.96M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$24.0M
FY25 Total
$38.2M
FY26 Request
$44.2M
FY25→26 Change
$5.96M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $24.0MFY25: $38.2MFY26: $44.2MFY24FY25FY26
FY24
$24.0M
FY25
$38.2M
FY26
$44.2M
Decade view — each figure cites its own President's Budget edition
FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$77.4M$121.5M$169.8M$56.1M$130.2M$99.4M$60.1M$18.4M$24.0M
Enacted$78.1M$124.2M$61.0M$56.9M$132.5M$99.2M$61.8M$19.1M$24.9M$38.2M
Request$114.2M$61.0M$56.9M$142.0M$100.5M$65.6M$19.1M$24.9M$38.2M$44.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2018 book requested $61.0M for FY2018; the PB2020 book reports $169.8M actually spent — $108.8M above the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Improved Threat Detection System (ITDS)

The ITDS (Improved Threat Detection System) budget line includes funding to support the development and integration of improved Aircraft Survivability Equipment (ASE) products onto current US Army Aviation platforms as well as Future Long Range Assault Aircraft (FLRAA) and future platforms. ITDS will detect, classify, cue, and declare on existing and emerging Electro-Optical/Infra-red (EO/IR) Guided Man-Portable Air Defense Systems (MANPADS), Drone Class I - IV, Loitering Ammunitions, Rocket Propelled Grenades (RPG)/ unguided rockets, Anti-Tank Guided Missiles (ATGM), Ballistic munitions, Unmanned Aerial System (UAS), and Lasers. ITDS will provide missile threat handoff to the appropriate countermeasure system (Common Infrared Countermeasure (CIRCM) and/or expendable countermeasure). ITDS will explore opportunities to improve the expendable countermeasure system. ITDS will use an incremental approach to align with PM ASE's System of Systems approach, align both agnostic detect and defeat capabilities, implement a modular open system architecture, integrate to the FLRAA digital backbone, improve full coverage against evolving threats in hostile environments, support counter UAS, and incorporate multi-function sensor suite to support other aircraft enabling technologies. Additional key attributes include: Geo-location of threats, Support Degraded Visual Environment and Navigation, Multiple Threat Detection, Declaration for Simultaneous Warning. Justification: ITDS: FY2026 Base RDTE dollars in the amount of $31.342 million will fund design and demonstration testing, prototype application hosting, sensor characterization and flight test, digital simulation modelling assessments, aircraft integration strategies, reliability, manufacturing, and technical readiness assessments. References: - MDD Request for the ITDS Program of Record, Aviation Capability Development and Integration Directorate (Aviation CDID), 6 July 2021. - MDD Request for the ITDS Program of Record, DCS, G-8, 14 March 2022. - Assignment of an Army Office of Primary Responsibility (OPR) for the ITDS Capability, Assistant Secretary of the Army (Acquisition, Logistics and Technology) (ASA(ALT)), 18 April 2022. - Improved Threat Detection Investment Acquisition Decision Memorandum (ADM), ASA(ALT), 1 July 2024.

Mission Aircraft Survivability Equipment Development

This funding line is a key enabler of the Army Modernization Priorities in support of FLRAA. The objective of the ASE Development project is to improve RF ASE for Army aviation. APR-39 RWR detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. The MDA approved Phases 1 and 2 of a 3-phased path forward. Phase 1, APR-39C(V)1/4, serves as an obsolescence / sustainment upgrade to the Processor LRU of APR-39A(V) RWR implemented to ensure that the currently fielded system remains viable until affordable improved RF ASE capability can be pursued in Phases 2 and 3. Phase 2A is where RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 significantly improves the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, MRWR, is an Army ECP to APR-39D(V)2, approved in the ADM signed June 24, 2019. This ECP implements enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA and the Enduring Fleet. Phase 3 adds Radio Frequency Electronic Counter Measures (RFECM) focusing on detecting and jamming incoming RF signals. RFCM will provide aircraft with an extra level of security against RF threats to include UAS/Drone technology. Justification: FY 2026 Base RDT&E funding of $8.159 million supports APR-39E(V)2 Hardware and Software System Development, and Systems Engineering and Program Management.

Mission Aircraft Survivability Development

This funding line is a key enabler of the Army Modernization Priorities in support of the Aircraft Survivability Equipment (ASE) as well as Future Long-Range Assault Aircraft (FLRAA). The Aircraft Survivability Development program includes Projects titled Aircraft Survivability Equipment Development (ER7), Common Missile Warning System (CMWS) (ER8), and Improved Threat Detection System (ITDS) (ITD). This program previously included funding for Joint Urgent Operational Needs Statement (JUONS) SO-0010, Headquarters Department of the Army (HQDA) Directed Requirement for Advanced Threat Warner (ATW) portion of Phase 3 ATW/Common Infrared Countermeasures Quick Reaction Capability (ATW/CIRCM QRC), and Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC). As of FY2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. ER7: Aircraft Survivability Development. The objective of the ASE Development project is to improve Radio Frequency (RF) ASE for Army Aviation. APR-39 Radar Warning Receiver (RWR) detects, categorizes, and prioritizes RF emitters and provides a visual / aural alert to aircrew members warning them of targeting by RF-guided weapons. The Milestone Decision Authority (MDA) approved Phases 1 and 2 of a 3-phased path forward. Phase 1, APR-39C(V)1/4, serves as an obsolescence / sustainment upgrade to the Processor Line Replaceable Unit (LRU) for AN/APR-39A(V) RWR implemented to ensure that the currently fielded system remains viable until affordable improved RF ASE capability can be pursued in Phases 2 and 3. Phase 2A is RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 will significantly improve the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, Modernized Radar Warning Receiver (MRWR), is an Army Engineering Change Proposal (ECP) to APR-39D(V)2, approved in the Acquisition Decision Memorandum (ADM) signed June 24, 2019. This ECP will implement enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats faced by legacy platforms in a near peer contest. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA. Phase 3 adds active Radio Frequency Electronic Countermeasures (RF-ECM) capability for selected aircraft with Material Development Decision (MDD) planned in the future. Justification: FY 2026 Base RDT&E funding of $8.159 million supports APR-39E(V)2 Hardware and Software System Development, and Systems Engineering and Program Management (SEPM). ER8: Common Missile Warning System (CMWS). The CMWS program is a missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR)-seeking missiles and will alert aircrews to the presence of certain incoming munitions. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and IR Laser Jamming (currently Common Infrared Countermeasures (CIRCM) -multiple platforms and Advanced Threat Infrared Countermeasures (ATIRCM)-equipped CH-47 platform only). In addition, CMWS ECU receives munitions detection data from the EOMS which it also passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. CMWS Generation 3 (Gen 3) ECU in conjunction with ongoing software development efforts will address outstanding materiel release conditions and ensure protection against emerging IR-guided missile threats. Due to evolving threats, CMWS will remain in the Army inventory until replaced by a future program. Continuing systems engineering, integration, and testing along with software support will maintain capability to rapidly respond as threats evolve in order to ensure protection against IR-guided missile threats. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. As of FY 2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. LIMWS QRC addresses the HQDA Directed Requirement to provide a greater capability than CMWS, the current program, to bridge the gap between CMWS and the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is required to provide increased detection range, improved detection in clutter, more agile algorithms to rapidly respond to emerging threats, and eliminates the need for sensor alignments. Justification: CMWS/LIMWS QRC: FY 2026 Base RDTE dollars in the amount of $4.681 million will fund Algorithm Analysis, Threat and Vulnerability Analysis, and Systems Engineering and Program Management (SEPM). ITD: Improved Threat Detection System (ITDS). The ITDS (Improved Threat Detection System) budget line includes funding to support the development and integration of improved Aircraft Survivability Equipment (ASE) products onto current US Army Aviation platforms as well as Future Long Range Assault Aircraft (FLRAA) and future platforms. ITDS will detect, classify, cue, and declare on existing and emerging Electro-Optical/Infra-red (EO/IR) Guided Man-Portable Air Defense Systems (MANPADS), Class I - IV Drones, Loitering Ammunitions, Rocket Propelled Grenades (RPG)/ unguided rockets, Anti-Tank Guided Missiles (ATGM), Ballistic munitions, Unmanned Aerial System (UAS), and Lasers. ITDS will provide missile threat handoff to the appropriate countermeasure system (Common Infrared Countermeasure (CIRCM) and/or expendable countermeasure). ITDS will explore opportunities to improve the expendable countermeasure system. ITDS will use an incremental approach to align with PM ASE's System of Systems approach, align both agnostic detect and defeat capabilities, implement a modular open system architecture, integrate to the FLRAA digital backbone, improve full coverage against evolving threats in hostile environments, support counter UAS, and incorporate multi-function sensor suite to support other aircraft enabling technologies. Additional key attributes include: Geo-location of threats, Support Degraded Visual Environment and Navigation, Multiple Threat Detection, Declaration for Simultaneous Warning. Justification: ITDS: FY2026 Base RDTE dollars in the amount of $31.342 million will fund design and demonstration testing, prototype application hosting, sensor characterization and flight test, digital simulation modelling assessments, aircraft integration strategies, reliability, prototypes, manufacturing, and technical readiness assessments. References: - Joint Staff, J-8 Deputy Director for Requirements (DOR) memorandum, April 24, 2015 - Phase 2a SOCOM JUONs SO-0010, Joint Rapid Acquisition Cell (JRAC) memorandum, May 29, 2015 - Directed Requirement for the Phase 3 Advanced Threat Warner and Common Infrared Countermeasure Quick Reaction Capability (ATW/CIRCM QRC) to Support Joint Urgent Operational Need (JUON) SO-0010, CIRCM Critical Intelligence Parameters Breach, December 18, 2015 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, March 26, 2017 - Update to the Directed Requirement for the United States Special Operations Command Joint Urgent Operational Needs SO-0010 Threat Detection and Countermeasures to Enemy Man Portable Air Defense System Capability, November 16, 2018 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, November 16, 2018 - Aircraft Survivability Equipment (ASE) Modernization Fielding Guidance, Change 1, November 19, 2018 - Acquisition Decision Memorandum (ADM) for Radio Frequency (RF) Project Manager Aircraft Survivability Equipment (PM ASE) Engineering Change Proposal (ECP) for Radar Warning Receiver AN/APR39-D(V)2 to AN/APR39-E(V)2, June 24, 2019 by PEO IEW&S. - MDD Request for the ITDS Program of Record, Aviation Capability Development and Integration Directorate (Aviation CDID), 6 July 2021. - MDD Request for the ITDS Program of Record, DCS, G-8, 14 March 2022. - Assignment of an Army Office of Primary Responsibility (OPR) for the ITDS Capability, Assistant Secretary of the Army (Acquisition, Logistics and Technology) (ASA(ALT)), 18 April 2022. - Improved Threat Detection Investment Acquisition Decision Memorandum (ADM), ASA(ALT), 1 July 2024. The FY 2026 request was reduced by $0.91 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Mission Common Missile Warning System (CMWS)

The Common Missile Warning System (CMWS) program is a missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR) seeking missiles and will alert aircrews to the presence of certain incoming munitions. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by the CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and IR Laser Jamming (currently Common Infrared Countermeasures (CIRCM) and Advanced Threat Infrared Countermeasures (ATIRCM) equipped CH-47 platform only). In addition, CMWS ECU receives munitions detection data from the EOMS which it also passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. The CMWS Generation 3 (Gen 3) ECU in conjunction with ongoing software development efforts will address outstanding materiel release conditions and ensure protection against emerging IR-guided missile threats. Due to evolving threats, CMWS will remain in the Army inventory until replaced by a future program. Continuing systems engineering, integration, and testing along with software support will maintain capability to rapidly respond as threats evolve in order to ensure protection against IR-guided missile threats. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. As of FY 2025, the ATW and JUONS RDT&E efforts have been completed, and aircraft deployed with JUONS have been de-modified. Phase 4 Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC) addresses the Headquarters Department of the Army (HQDA) Directed Requirement to provide a greater capability than CMWS, the current Program of Record (POR), to bridge the gap between CMWS and the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is required to provide increased detection range, improved detection in clutter, more agile algorithms to rapidly respond to emerging threats, and eliminates the need for sensor alignments. CMWS/LIMWS QRC: FY 2026 Base RDTE dollars in the amount of $4.681 million will fund Sensor and Algorithm Analysis, Threat and Vulnerability Analysis, and Systems Engineering and Program Management (SEPM).

Justification

Accomplishments & Planned Programs (4)

ITDS Product Development and Management Services

ITDS will use an incremental approach to align with PM ASE's System of Systems approach, including both detect and defeat capabilities, and integrate it onto an open system architecture digital backbone, improving full coverage against evolving threats in hostile environments.

Phase 4 LIMWS QRC

Limited Interim Missile Warning System Quick Reaction Capability (LIMWS QRC) is a follow-on solution to the Joint Urgent Operational Needs Statement (JUONS) SO-0010 to provide a greater capability than the current Program of Record (POR), Common Missile Warning System (CMWS), until the future threat detection system, the Improved Threat Detection System (ITDS). LIMWS is a Chief of Staff of the Army approved Directed Requirement issued by Army G-8 on March 26, 2017. LIMWS QRC provides an enhanced missile warning system to detect emerging and evolving enemy Man Portable Air Defense Systems (MANPADS) threats.

Phase 2 Radio Frequency Countermeasure (CM)

Phase 2A is RWR Modernization begins by adopting the United States Navy APR-39D(V)2 system. APR-39D(V)2 will significantly improve the RF threat coverage, automatic detection and identification of threat types, bearing, and lethality. Phase 2B, the APR-39E(V)2, MRWR, is an Army ECP to APR-39D(V)2, approved in the ADM signed June 24, 2019. This ECP will implement enhanced hardware and software upgrades to keep APR-39 technically relevant against new and emerging agile threats. APR-39E(V)2 is part of the suite of ASE mission equipment for FLRAA.

CMWS Product Development and Management Services

Research Development Test and Evaluation (RDTE) funding supports continuing development engineering threat and vulnerability analysis, Systems Engineering and Program Management (SEPM), and integration with other ASE Systems.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$24.0M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$38.2M
Research, Development, Test and Evaluation, ArmyAFY25 Total$38.2M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$44.2M
Research, Development, Test and Evaluation, ArmyAFY26 Total$44.2M

Budget Details(R-2/P-40 facts)

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
ER8: Common Missile Warning System (CMWS)$9.37M$5.10M$4.68M$4.68M
ER7: Aircraft Survivability Equipment Development$14.6M$4.70M$8.16M$8.16M
ITD: Improved Threat Detection System (ITDS)$28.4M$31.3M$31.3M
Program Element$24.0M$38.2M$44.2M$44.2M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →