Printed from https://fiscalreceipts.com/program/0605037A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Evidence Collection and Detainee Processing
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
Insufficient trajectory data for sparkline (only FY26 available).
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $206.0K | – | – | – | – | – | – | ||
| Enacted | – | $0 | $214.0K | $0 | – | – | – | – | – | – | |
| Request | – | $214.0K | $0 | $0 | – | – | – | – | – | $4.62M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2018 book requested $214.0K for FY2018; the PB2020 book reported $206.0K as actual total obligation authority — $8.00K below the request. 0.2 − 0.2 = -0.0 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Evidence Collection and Detainee Processing
Detainee Management, Accountability, and Reporting (DMAR) (Project DM1) will be comprised of both an enterprise (connected) and stand-alone (denied/degraded) software instantiation that provides Military Police Commands with the capability and capacity to operate a national-level registry to account for detainees and generate reports on Detainee Operations to provide national and international organizations as required by law. DMAR will provide a high degree of situational understanding in Near Real Time (NRT) across Joint Domain Operations (JDO) during Detainee Operations. DMAR will replace the currently fielded systems, Detainee Information Management System - Fusion (DIMS-F) and Detainee Reporting System (DRS) which are obsolete and facing End of Useful Life (EUL).
Mission — Detainee Management, Accountability, and Reporting
Detainee Management, Accountability, and Reporting (DMAR) will be comprised of both an enterprise (connected) and stand-alone (denied/degraded) software instantiation that provides Military Police Commands with the capability and capacity to operate a national-level registry to account for detainees and generate reports on detainee operations to provide national and international organizations as required by law. DMAR will provide a high degree of situational understanding in Near Real Time (NRT) across Joint Domain Operations (JDO) during Detainee Operations. FY26 funds in the amount of $4.619M will be used to replace the currently fielded systems, Detainee Information Management System - Fusion (DIMS-F) and Detainee Reporting System (DRS). These systems are obsolete and facing End of Useful Life (EUL).
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $4.62M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $4.62M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY26 Base | FY26 Request |
|---|---|---|
| Program Element | $4.62M | $4.62M |
| DM1: Detainee Management, Accountability, and Reporting | $4.62M | $4.62M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Evidence Collection and Detainee Processing. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · P136
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J129
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J132
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J155
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 3 - Budget Activity 5A · www.asafm.army.mil