Skip to content
Fiscal Receipts

Offensive Anti-Surface Warfare Weapon Development

NavyRDT&EReconciledPE0604786N
What it is
Offensive Anti-Surface Warfare Weapon Development (0604786N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 3 projects.
What changed
-$60.6M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$253.1MR-1 TOA · PB2026
FY25 Total
$286.4MR-1 TOA · PB2026
FY26 Request
$225.8MR-1 TOA · PB2026
FY25→26 Change
-$60.6MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $253.1MFY25: $286.4MFY26: $225.8MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$253.1M
FY25$286.4M
FY26$225.8M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$181.7M$348.7M$301.6M$163.8M$141.4M$112.6M$45.5M$75.1M$217.0M$253.1M
Enacted$285.8M$313.1M$160.7M$139.3M$115.4M$46.8M$70.8M$223.8M$237.7M$286.4M
Request$252.4M$160.7M$143.1M$65.4M$35.8M$127.8M$124.2M$237.7M$341.9M$225.8M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2023 book requested $124.2M for FY2023; the PB2025 book reported $217.0M as actual total obligation authority — $92.8M above the request. 217.0 − 124.2 = 92.8 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Offensive Anti-Surface Warfare Weapon Dev

Offensive Anti-Surface Warfare (OASuW) is an offensive weapon system that is a vital component of the Joint Force Anti-Surface Warfare capability and incorporates new and emergent technologies to support an increased offensive strike capability utilizing multiple weapons. OASuW Increment 2 is a national imperative to maturing hypersonic capabilities. The program will provide the Navy a necessary weapon to address evolving long range high speed threats from near peer competitors. The OASuW program is part of the Navy's Long Range Fires (LRF) approach to address advanced threat capabilities in the Anti-Access/Area-Denial (A2AD) environment. LRF solutions enable individual system capabilities to be leveraged across an effects chain, placing the full spectrum of tactical capability in the hands of the warfighter. LRF solutions that push engagement distances beyond the launch platform's radar horizon and allows the U.S. Navy to operate in, and control, contested battle space in littoral waters and A2/AD environments are increasingly critical as more and more scenarios require compressed and coordinated fire control timelines. OASuW strategy pursues capability across multiple weapon systems to enhance warfighting capabilities. Project 3337 - Due to emerging threats, the fleet issued an Urgent Operational Needs Statement (UONS) that identified a capability gap for a long-range anti-ship missile to be filled by 2018. Directly supporting this UONS and significantly reducing Joint Force warfighting risks, the U.S. Navy initiated OASuW Increment 1 (OASuW-1), which leverages the Defense Advanced Research Projects Agency (DARPA)/Office of Naval Research Long Range Anti-Ship Missile (LRASM) demonstration program to deliver an Early Operational Capability (EOC) in the required timeframe. LRASM fills the most urgent air-launched capability gap to complement existing ASuW weapon systems and positions the Department of Defense to address evolving surface warfare threats. LRASM is integral to realizing the National Defense Strategy of combat-credible military forces to deter war, protect the security of our nation and to enable the Joint Force to win should deterrence fail. The development and acquisition of LRASM has been structured to be fielded at a pace relevant to maintain overmatch against long-term strategic competition. Specifically, LRASM directly contributes to building a more lethal force and is a critical enabler for joint lethality in contested environments; deterring adversaries from aggression; ensuring common domains remain open and maintaining favorable regional balances of power. Project 3343 - The Department of the Navy is developing OASuW Increment 2 to address weapon system requirements based on the OASuW Analysis of Alternatives (AoA). OASuW Inc. 2 will be a carrier-suitable, higher-speed, longer-range, air-launched weapon system providing superior Anti Surface Warfare capabilities. The program is part of the Navy's Long Range Fires investment approach to meet objectives of the National Defense Strategy. As a key component of this strategy, OASuW Inc. 2 will address advanced threats from engagement distances that allow the Navy to operate in, and control, contested battle space in littoral waters and Anti-Access/Area Denial (A2/AD) environments. The program will leverage and further advance foundational achievements in the joint Science and Technology (S&T) enterprise, making targeted investments in Navy integration of critical system attributes. User priorities, in the form of pacing the evolving maritime threat, will be the centerpiece of the system requirements and the associated development and fielding schedule. Additional details are classified. Project 3466 - The LRASM C-3 program is established to improve OASuW and incorporate a long range strike capability into the Navy's arsenal derived from the Navy's AGM-158C-1 LRASM and the Air Force's AGM-158 JASSM-ER. The Navy will integrate an AGM-158 derived weapon onto F/A-18 E/F aircraft. This funding line resources requirements for Navy increased LRASM capabilities and strike mission integration by upgrading the existing AGM-158C product to respond to rapidly changing threats. Budget Item Justification: This program is funded under ADVANCED COMPONENT DEVELOPMENT AND PROTOTYPES because it includes all efforts necessary to evaluate integrated technologies, representative models or prototype systems in a high fidelity and realistic operating environment.

Mission — Offensive Anti-Surface Warfare (OASuW) Weapon

Offensive Anti-Surface Warfare (OASuW) is an offensive weapon system that can be air, surface, and subsurface launched in the maritime battle space environment. OASuW is a vital component of the Joint Force Anti-Surface Warfare capability and incorporate new and emergent technologies to support an increased offensive future strike capability. Due to emerging threats, the fleet issued an Urgent Operational Needs Statement (UONS) that identified a capability gap for a long-range anti-ship missile to be filled by 2018. Directly supporting this UONS and significantly reducing Joint Force warfighting risks, the U.S. Navy initiated OASuW Increment 1 (OASuW-1), which leverages the Defense Advanced Research Projects Agency (DARPA)/Office of Naval Research Long Range Anti-Ship Missile (LRASM) demonstration program to deliver an Early Operational Capability (EOC) in the required timeframe. LRASM fills the most urgent air-launched capability gap to complement existing ASuW weapon systems and positions the Department of Defense to address evolving surface warfare threats. LRASM is integral to realizing the National Defense Strategy of combat-credible military forces to deter war, protect the security of our nation and to enable the Joint Force to win should deterrence fail. The development and acquisition of LRASM has been structured to be fielded at a pace relevant to maintain overmatch against long-term strategic competition. Specifically, LRASM directly contributes to building a more lethal force and is a critical enabler for joint lethality in contested environments; deterring adversaries from aggression; ensuring common domains remain open and maintaining favorable regional balances of power. OASuW-1 includes efforts to develop, integrate and test navigation software improvements and to develop mission validation tools to facilitate Network Enabled Weapon (NEW) employment.

Mission — Offensive Anti-Surface Warfare (OASuW) Weapon Increment II

The Department of the Navy is developing Offensive Anti-Surface Warfare Weapon Increment 2 (OASuW Inc 2), (PU 3343) to address weapon system requirements based on the OASuW Analysis of Alternatives (AoA). OASuW Inc 2 will be a carrier-suitable, higher-speed, longer-range, air-launched weapon system providing superior Anti-Surface Warfare capabilities. The program is part of the Navy's Long Range Fires investment approach to meet objectives of the National Defense Strategy. As a key component of this strategy, OASuW Inc 2 will address advanced threats from engagement distances that allow the Navy to operate in, and control, contested battle space in littoral waters and Anti-Access/Area Denial (A2/AD) environments. The program will leverage and further advance foundational achievements in the joint Science and Technology (S&T) enterprise, making targeted investments in Navy integration of critical system attributes. User priorities, in the form of pacing the evolving maritime threat, will be the centerpiece of the system requirements and the associated development and fielding schedule. Additional details are Classified.

Mission — LRASM C-3

The LRASM C-3 (PU 3466) is established to enhance the Navy's OASuW and incorporate a future long range strike capability into the Navy's arsenal derived from the Navy's AGM-158C-1 LRASM and the Air Force's AGM-158 JASSM-ER. The Navy will integrate an AGM-158 derived weapon with extended range, enhanced radio and survivability onto F/A-18 aircraft and partner with USAF to further the capabilities of the AGM-158 product line. This funding line resources requirements for future Navy strike mission integration and employment by upgrading the existing AGM-158C product to respond to rapidly changing threats.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$253.1M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$286.4M
Research, Development, Test and Evaluation, NavyNFY25 Total$286.4M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$225.8M
Research, Development, Test and Evaluation, NavyNFY26 Total$225.8M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.78B$253.1M$286.4M$225.8M$225.8M
3337: Offensive Anti-Surface Warfare (OASuW) Weapon$1.51B$0$15.0M$8.59M$8.59M
3343: Offensive Anti-Surface Warfare (OASuW) Weapon Increment II$147.1M$74.8M$16.6M$59.6M$59.6M
3466: LRASM C-3$115.7M$178.3M$254.8M$157.6M$157.6M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
LOCKHEED MARTIN CORPORATIONN0001922F0010medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

13 mentions from the Senate LDA disclosure database.

BAE SYSTEMS INCWarfare|Weapon2026matched 2+ title words

National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…

BAE SYSTEMS INCWarfare|Weapon2026matched 2+ title words

National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2026matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

PARSONS CORPORATIONSurface|Warfare2026matched 2+ title words

H.R. 9170; H.R. 8870, FY27 Transportation, Housing and Urban Development, and Related Agencies (THUD) Appropriations…

PARSONS CORPORATIONSurface|Warfare2026matched 2+ title words

S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21)/H.R. 7148, FY26 Transportation, Housing and Urban Development, and Related…

BAE SYSTEMS INCWarfare|Weapon2025matched 2+ title words

Department of Defense Appropriations Act, 2026 (HR 4016/S 2572); provisions regarding R&D - Navy, Air Force, Space…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2025matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2025matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2025matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

HUNTINGTON INGALLS INDUSTRIES INCORPORATEDSurface|Warfare2025matched 2+ title words

Carrier Replacement Program VCS CVN RCOH DDG-51 Class Multi-year Procurement DDG(X) DDG 1002 LHA and LPD Flight II…

PARSONS CORPORATIONSurface|Warfare2025matched 2+ title words

S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21), FY26 Transportation, Housing and Urban Development, and Related Agencies…

PARSONS CORPORATIONSurface|Warfare2025matched 2+ title words

S. 2465/H.R. 4552/H.R. 1 (P.L. 119-21), FY26 Transportation, Housing and Urban Development, and Related Agencies…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Offensive Anti-Surface Warfare Weapon Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.