Skip to content
Fiscal Receipts

Medium Tactical Vehicles

ArmyRDT&EReconciledPE0604604A
What it is
Medium Tactical Vehicles (0604604A) is an Army research & development line funded in the Research, Development, Test and Evaluation, Army account. Its J-book detail breaks the line into 1 project.
What changed
+$14.9M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$17.6MR-1 TOA · PB2026
FY25 Total
$3.56MR-1 TOA · PB2026
FY26 Request
$18.5MR-1 TOA · PB2026
FY25→26 Change
+$14.9MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $17.6MFY25: $3.56MFY26: $18.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$17.6M
FY25$3.56M
FY26$18.5M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$202.0K$0$0$5.80M$3.90M$0$8.21M$9.18M$21.4M$17.6M
Enacted$0$0$6.04M$3.70M$0$8.21M$9.52M$22.2M$28.2M$3.56M
Request$0$6.04M$3.70M$2.15M$8.52M$11.4M$22.2M$28.2M$15.1M$18.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2024 book requested $28.2M for FY2024; the PB2026 book reported $17.6M as actual total obligation authority — $10.7M below the request. 17.561 − 28.226 = -10.665 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Medium Tactical Vehicles

This Program Element (PE) supports continued modernization of the Army's Family of Medium Tactical Wheeled Vehicle (FMTV) fleet: 4x4 and 6x6 Cargo, Tractor, Load Handling System (LHS), Wrecker, Expandable Van, Shop Van, and Dump Truck variants with payloads ranging from 2.5-tons to 10-tons and associated companion trailers. Modernization includes upgrades in survivability, safety, modularity, fuel efficiency, power generation, reliability, maintainability, mobility, autonomous operation, and other emerging technologies that enhance warfighter capability. The Family of Medium Tactical Wheeled Vehicles perform the majority of the Army's local haul, line haul, and unit resupply missions throughout theater as multi-purpose transportation vehicles in combat, combat support, and combat service support units. The FMTV also serves as a host platform for Long Range Precision Fires (LRPF), Air and Missile Defense (AMD), and Counter - Unmanned Aerial Systems (C-UAS) supporting Fire Control and Communication modules, Engagement Operation Centers (EOC), Electronic Control Systems (EOS), and other support areas for maintenance/personnel. This PE supports development and integration of export power capability for AMD units: PM THAAD (Terminal High Altitude Area Defense), Patriot Missile System, Sentinel Integrated Fire Protection Capability (IFPC), and Integrated Battle Command System (IBCS)/Integrated Fire Control Network (IFCN). Furthermore, this PE supports prototyping to enable soldier demonstration in Transformation in Contact units. FY 2026 Project H07 Base funds in the amount of $3.503 million will be used for development and integration of Improved Vehicle Safety Technologies, including active safety technologies such as front collision warning, collision mitigation, lane keeping assist, adaptive cruise control, and 360-degree situational awareness. FY 2026 Project H07 Base funds in the amount of $15.000 million will be used for development and integration of Vehicle Integrated Power Kits (VIPK) that provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support. The FY 2026 request was reduced by $0.018 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."

Mission — Family Of Med Tac Veh

The FMTVA2 Production and Engineering Change Proposal (ECP) modernization effort restores vehicle performance that was lost due to the addition of armor protection kits as the threat to tactical vehicles and the Family of Medium Tactical Vehicles (FMTV) has increased. The FMTVA2 also addresses Space, Weight, Power, and Cooling (SWaP-C) constraints from having to host an increasing amount of C4ISR and Counter-IED equipment. PD MTV is executing the FMTVA2 effort documented in a signed Acquisition Decision Memorandum by the AAE on 16 November 2015. The FMTVA1P2 ended production in FY 2021 and represents the highest density FMTV model with over 40,000 vehicles fielded to date. The FMTVA1P2 will remain in the tactical vehicle fleet until 2040 and beyond. To ensure supportability of the FMTVA1P2 through FY 2040 and beyond, the PD MTV, as lifecycle managers for the system, shall address potential obsolescence issues with the powertrain and Material Handling Equipment used on the FMTV. Increasing survivability and crew protection of the FMTVA1P2 comes at the expense of decreased vehicle mobility and performance in soft soil and winter environments. The FMTVA1P2 is being asked to carry more weight than what it was originally designed for. Low risk, highly commercial improvements to the FMTVA1P2 driveline, suspension, and tires can be made to minimize the loss in mobility performance. FY 2026 Project H07 Base funds in the amount of $3.503 million will be used for development and integration of Improved Vehicle Safety Technologies, including active safety technologies such as front collision warning, collision mitigation, lane keeping assist, adaptive cruise control, and 360-degree situational awareness. FY 2026 Project H07 Base funds in the amount of $15.000 million will be used for development and integration of Vehicle Integrated Power Kits (VIPK) that provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support.

Justification

Accomplishments & Planned Programs (5)

FMTVA2 Production and ECP Modernization Effort

Funding used to support the continued evolution of the future FMTV fleet as well as tech insertion opportunities to keep the current FMTV fleet relevant on today's battlefield.The FMTVA2 production and ECP modernization effort restores vehicle performance that was lost due to the addition of armor protection kits as the threat to tactical vehicles and the FMTV has increased. Live Fire test assets are needed to support Live Fire Testing required per Chapter 139, Title 10 USC. Operational Testing required per Chapter 141, Title 10 USC.

FMTV LVAD Next Generation Model

Updates to the FMTV Low Velocity Air Drop (LVAD) are needed to address obsolescence issues and to modernize the fleet.

Climate Change Initiatives

Funding will be used to develop Demand Reduction Engineering Change Proposals for MTV and HTV Fleets including Anti-Idle, On-Board Vehicle Power, Advanced Hybrid Propulsion, and Fuel Sense 2.0. Funding will also be used to develop technologies associated with Demand Reduction/Hybridization including battery modernization, power and energy management, and increased capability at extreme temperatures. Due to Army Transformation Initiative (ATI) all actives will be suspended at the conclusion of FY25.

SBIR/STTR Transfer

Funding transferred in accordance with Title 15 USC §638.

Vehicle Integrate Power Kits

Vehicle Integrated Power Kits (VIPK) prototype development onto the FMTV A2. VIPK will provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$17.6M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$3.56M
Research, Development, Test and Evaluation, ArmyAFY25 Total$3.56M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$18.5M
Research, Development, Test and Evaluation, ArmyAFY26 Total$18.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$17.6M$3.56M$18.5M$18.5M
H07: Family Of Med Tac Veh$17.6M$3.56M$18.5M$18.5M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

4 mentions from the Senate LDA disclosure database.

PHILLIPS 66Medium|Vehicles2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Medium|Vehicles2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Medium|Vehicles2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

PHILLIPS 66Medium|Vehicles2024matched 2+ title words

Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Medium Tactical Vehicles. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.