Printed from https://fiscalreceipts.com/program/0604604A/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Medium Tactical Vehicles
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $17.6M |
| FY25 | $3.56M |
| FY26 | $18.5M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $202.0K | $0 | $0 | $5.80M | $3.90M | $0 | $8.21M | $9.18M | $21.4M | $17.6M | ||
| Enacted | $0 | $0 | $6.04M | $3.70M | $0 | $8.21M | $9.52M | $22.2M | $28.2M | $3.56M | ||
| Request | $0 | $6.04M | $3.70M | $2.15M | $8.52M | $11.4M | $22.2M | $28.2M | $15.1M | $18.5M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $28.2M for FY2024; the PB2026 book reported $17.6M as actual total obligation authority — $10.7M below the request. 17.561 − 28.226 = -10.665 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Medium Tactical Vehicles
This Program Element (PE) supports continued modernization of the Army's Family of Medium Tactical Wheeled Vehicle (FMTV) fleet: 4x4 and 6x6 Cargo, Tractor, Load Handling System (LHS), Wrecker, Expandable Van, Shop Van, and Dump Truck variants with payloads ranging from 2.5-tons to 10-tons and associated companion trailers. Modernization includes upgrades in survivability, safety, modularity, fuel efficiency, power generation, reliability, maintainability, mobility, autonomous operation, and other emerging technologies that enhance warfighter capability. The Family of Medium Tactical Wheeled Vehicles perform the majority of the Army's local haul, line haul, and unit resupply missions throughout theater as multi-purpose transportation vehicles in combat, combat support, and combat service support units. The FMTV also serves as a host platform for Long Range Precision Fires (LRPF), Air and Missile Defense (AMD), and Counter - Unmanned Aerial Systems (C-UAS) supporting Fire Control and Communication modules, Engagement Operation Centers (EOC), Electronic Control Systems (EOS), and other support areas for maintenance/personnel. This PE supports development and integration of export power capability for AMD units: PM THAAD (Terminal High Altitude Area Defense), Patriot Missile System, Sentinel Integrated Fire Protection Capability (IFPC), and Integrated Battle Command System (IBCS)/Integrated Fire Control Network (IFCN). Furthermore, this PE supports prototyping to enable soldier demonstration in Transformation in Contact units. FY 2026 Project H07 Base funds in the amount of $3.503 million will be used for development and integration of Improved Vehicle Safety Technologies, including active safety technologies such as front collision warning, collision mitigation, lane keeping assist, adaptive cruise control, and 360-degree situational awareness. FY 2026 Project H07 Base funds in the amount of $15.000 million will be used for development and integration of Vehicle Integrated Power Kits (VIPK) that provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support. The FY 2026 request was reduced by $0.018 million for civilian personnel to optimize the workforce in compliance with Executive Order 14210, "Implementing the President's Department of Government Efficiency Workforce Optimization Initiative."
Mission — Family Of Med Tac Veh
The FMTVA2 Production and Engineering Change Proposal (ECP) modernization effort restores vehicle performance that was lost due to the addition of armor protection kits as the threat to tactical vehicles and the Family of Medium Tactical Vehicles (FMTV) has increased. The FMTVA2 also addresses Space, Weight, Power, and Cooling (SWaP-C) constraints from having to host an increasing amount of C4ISR and Counter-IED equipment. PD MTV is executing the FMTVA2 effort documented in a signed Acquisition Decision Memorandum by the AAE on 16 November 2015. The FMTVA1P2 ended production in FY 2021 and represents the highest density FMTV model with over 40,000 vehicles fielded to date. The FMTVA1P2 will remain in the tactical vehicle fleet until 2040 and beyond. To ensure supportability of the FMTVA1P2 through FY 2040 and beyond, the PD MTV, as lifecycle managers for the system, shall address potential obsolescence issues with the powertrain and Material Handling Equipment used on the FMTV. Increasing survivability and crew protection of the FMTVA1P2 comes at the expense of decreased vehicle mobility and performance in soft soil and winter environments. The FMTVA1P2 is being asked to carry more weight than what it was originally designed for. Low risk, highly commercial improvements to the FMTVA1P2 driveline, suspension, and tires can be made to minimize the loss in mobility performance. FY 2026 Project H07 Base funds in the amount of $3.503 million will be used for development and integration of Improved Vehicle Safety Technologies, including active safety technologies such as front collision warning, collision mitigation, lane keeping assist, adaptive cruise control, and 360-degree situational awareness. FY 2026 Project H07 Base funds in the amount of $15.000 million will be used for development and integration of Vehicle Integrated Power Kits (VIPK) that provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support.
Justification
Accomplishments & Planned Programs (5)
FMTVA2 Production and ECP Modernization Effort
Funding used to support the continued evolution of the future FMTV fleet as well as tech insertion opportunities to keep the current FMTV fleet relevant on today's battlefield.The FMTVA2 production and ECP modernization effort restores vehicle performance that was lost due to the addition of armor protection kits as the threat to tactical vehicles and the FMTV has increased. Live Fire test assets are needed to support Live Fire Testing required per Chapter 139, Title 10 USC. Operational Testing required per Chapter 141, Title 10 USC.
FMTV LVAD Next Generation Model
Updates to the FMTV Low Velocity Air Drop (LVAD) are needed to address obsolescence issues and to modernize the fleet.
Climate Change Initiatives
Funding will be used to develop Demand Reduction Engineering Change Proposals for MTV and HTV Fleets including Anti-Idle, On-Board Vehicle Power, Advanced Hybrid Propulsion, and Fuel Sense 2.0. Funding will also be used to develop technologies associated with Demand Reduction/Hybridization including battery modernization, power and energy management, and increased capability at extreme temperatures. Due to Army Transformation Initiative (ATI) all actives will be suspended at the conclusion of FY25.
SBIR/STTR Transfer
Funding transferred in accordance with Title 15 USC §638.
Vehicle Integrate Power Kits
Vehicle Integrated Power Kits (VIPK) prototype development onto the FMTV A2. VIPK will provide exportable power generated by FMTV platforms to improve mobility and agility for rapid emplacement/displacement of dismount operations and fire support.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Army | A | FY24 Actuals | $17.6M |
| Research, Development, Test and Evaluation, Army | A | FY25 Enacted | $3.56M |
| Research, Development, Test and Evaluation, Army | A | FY25 Total | $3.56M |
| Research, Development, Test and Evaluation, Army | A | FY26 Disc. Request | $18.5M |
| Research, Development, Test and Evaluation, Army | A | FY26 Total | $18.5M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|
| Program Element | $17.6M | $3.56M | $18.5M | $18.5M |
| H07: Family Of Med Tac Veh | $17.6M | $3.56M | $18.5M | $18.5M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
4 mentions from the Senate LDA disclosure database.
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Renewable Fuels Standard RVO Annual Rule 2023, 2024, and 2025; Proposed Rule; Multi-Pollutant Emissions Standards for…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Medium Tactical Vehicles. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J104
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J83
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J89
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J92
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J116
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J124
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J94
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J95
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J96
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J95
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTE - Vol 3 - Budget Activity 5A · www.asafm.army.mil
PDF page 170