What it is
Mine Development (0604601N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 3 projects.
What changed
-$23.0M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$101.3MR-1 TOA · PB2026
FY25 Total
$84.4MR-1 TOA · PB2026
FY26 Request
$61.5MR-1 TOA · PB2026
99.8% reconciliation

$130.0K discretionary + $61.3M one-time reconciliation. Discretionary change vs FY2025 enacted: -99.8%.

FY25→26 Change
-$23.0MR-1 TOA · PB2026

Two official figures, one label— reconciled below

Fiscal Receipts uses P-1/R-1 workbook total obligation authority (TOA) as the headline figure sitewide. The workbook TOA includes budget rows that the R-2/P-40 J-book program line excludes — advance procurement in an ordinary year, and in FY2026 the one-time reconciliation appropriation as well. Each row below names the one it is. How the two bases relate →

FY26 Request · $61.5M TOA − $130.0K J-book line = 61.3M (61.46 − 0.13 = 61.33) — $61.3M of one-time FY2026 reconciliation money accounts for this gap — not advance procurement

Figures in the sentence are rounded for reading; the parenthesised arithmetic is the same subtraction in USD millions, at the precision where it closes.

Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends lower than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $101.3MFY25: $84.4MFY26: $61.5MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$101.3M
FY25$84.4M
FY26$61.5M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$11.0M$12.6M$14.9M$24.6M$22.1M$54.4M$74.8M$37.1M$68.1M$101.3M
Enacted$15.1M$15.3M$25.6M$21.7M$56.5M$84.8M$37.8M$60.8M$104.7M$84.4M
Request$10.5M$25.6M$25.8M$29.0M$92.6M$76.0M$60.8M$104.7M$79.4M$61.5M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2022 book requested $76.0M for FY2022; the PB2024 book reported $37.1M as actual total obligation authority — $39.0M below the request. 37.054 − 76.027 = -38.973 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Mine Development

Project 0267 funds the Quickstrike MOD 3, Quickstrike-Extended Range (ER), and Clandestine Delivered Mine (CDM) MK68 programs. Project 2993 adjustments are associated with sensor upgrades to allow the Hammerhead system to prosecute additional targets. The Mines Improvement PE provides resources to develop naval mine systems used to establish and maintain control of essential sea areas. Naval mines are used to deny sea areas or inflict damage on adversary shipping to hinder, disrupt, and deny adversary operations. Naval mining is employed to reduce the adversary's threat to friendly forces and preserve access. Mining complements and performs an essential part of other warfare areas; particularly strike, anti-submarine, and anti-surface warfare. Resources are utilized for developing and deploying improvements to the portfolio of naval mines.

Mission — Mine Improvements

Naval mines are used to deter or control adversary movements, including surface ships and submarines. Funding supports the capability to maintain effectiveness of mines facing new threat targets with increasing emphasis on major regional conflicts and near peer threats. The three major project areas are: 1) Quickstrike (QS) Mod 3: QS MOD 3 improves effectiveness of existing mines against modern threats by using a programmable Target Detection Device (TDD) MK-71. QS MOD 3 utilizes modeling and analysis to improve target detection and response by developing optimized mine settings and firing algorithms. Minefield planning improvements include new targeting algorithms, mine settings, and corresponding damage data for weapon /target pairs into existing minefield planning software. 2) QS-ER: QS-ER adds GPS-enabled tail kit and a wing kit to the (QS) series to reduce risk to delivery aircraft by enabling precision mine placement and mid-range standoff delivery. Aerial delivery development efforts address capabilities required by a Joint Emergent Operational Needs Statement (JEONS). 3) Clandestine Delivered Mine: Clandestine Delivered Mine MK68 (CDM MOD 0) provides a required capability by converting legacy mining systems for delivery by Extra Large Unmanned Undersea Vehicles (XLUUV) and/or alternate platform in support of JEONS. This capability allows access to contested environments and reduces risk by using unmanned platforms. Upgrades to CDM incorporate the programmable TDD MK-71 and adds iterative command and control enhancements (MODs 1 and 2) through future upgrades for increased operational flexibility and safety for emplaced minefields. Additional efforts include transitioning an explosive section design into the CDM program that is in development under the Compact Encapsulated Effector (C-ENCAP) effort that is managed by the Office of Naval Research (ONR).

Mission — Encapsulated Effector

The Encapsulated Effector, Hammerhead, program complements existing shallow-water mines by providing maritime mining capability in deeper water depths. Based on the urgency of the requirement, the Hammerhead program utilizes Section 804 authority to streamline acquisition of an initial capability. The system uses existing kinetic payloads to engage enemy targets and provides a wide area of coverage per each weapon. The program uses a self-contained, propelled weapon to engage the target when a target is detected. The system uses modern sensing and processing technology to enable accurate targeting at increased range and maintains minefield resilience even as weapons are expended against targets. The result is expanded operating areas to restrict or deny adversary access to the intended area while using fewer weapons than traditional mines. Additional efforts include; transitioning an encapsulation system with different end effectors under the Compact Encapsulated Effector (C-ENCAP) future naval capability (FNC) that is managed by the Office of Naval Research (ONR).

Mission — Congressional Adds

Conduct operational demonstrations of notional powered mine delivery systems. FY25 Enacted Congressional Add.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$101.3M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$84.4M
Research, Development, Test and Evaluation, NavyNFY25 Total$84.4M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$130.0K
Research, Development, Test and Evaluation, NavyNFY26 Reconciliation$61.3M
Research, Development, Test and Evaluation, NavyNFY26 Total$61.5M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$386.3M$101.3M$84.4M$130.0K$130.0K
0267: Mine Improvements$292.7M$43.7M$15.3M$130.0K$130.0K
2993: Encapsulated Effector$93.7M$57.5M$64.1M$0$0
9999: Congressional Adds$0$0$5.00M$0$0

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 0604601N (Mine Development), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 0604601N (Mine Development), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNRDT&E appropriation0604601N61.5M FY26N0002421C6412THE BOEING COMPANY70.4MThe Boeing CompanyMO-01

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
MO-01$70.4M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
THE BOEING COMPANYN0002421C6412high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Mine Development. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.