What it is
Unified Network Transport — a research & development program run by Army.
What changed
-$2.65M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$47.2M
FY25 Total
$31.8M
FY26 Request
$29.2M
FY25→26 Change
-$2.65M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $47.2MFY25: $31.8MFY26: $29.2MFY24FY25FY26
FY24
$47.2M
FY25
$31.8M
FY26
$29.2M
Decade view — each figure cites its own President's Budget edition
FY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY18FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$28.5M$39.2M$33.9M$35.6M$47.2M
Enacted$0$29.7M$39.2M$35.2M$37.0M$40.9M$31.8M
Request$39.6M$40.7M$35.4M$37.0M$40.9M$31.8M$29.2M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2020 book requested $39.6M for FY2020; the PB2022 book reports $28.5M actually spent — $11.1M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Integrated Tactical Network/Enterprise Network

This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Transport Layer. This line supports advanced component development activities that enable a converged Mission Command Network that operates seamlessly worldwide and in any environment. It includes the development of a standards-based network architecture that unifies enterprise and deployed network capabilities, and features a unified transport layer, network operations and other enabling functions that allows integration of disparate networks. The Army network will provide resiliency through path diversity and dynamic routing to ensure tactical units can communicate in hostile environments. It will provide multiple ways to communicate and give commanders the ability to have a network that delivers the right information and data at the right time during operations. It fully incorporates cyber and electronic warfare capabilities that support the employment of the network as a weapon system. FY 2026 funding will be used to inform design decisions for Army network modernization in the areas of resilient wideband satellite communications capabilities, non-traditional waveforms, narrowband waveforms, and implementation of Automated Primary Alternate Contingency and Emergency (PACE) communications through evaluation and technical maturation. Funds also support identification, maturation, demonstration, and evaluation of Technology Readiness Level (TRL) 6+ systems and subsystem components including, but not limited to, resilient, alternate Beyond Line of Sight (BLOS) capability in support of legacy high frequency waveforms. Funds also support development of Cyber Electromagnetic Activities (CEMA) situational understanding, development of an intelligent and threat-informed network and operational integration and interoperability functions. Additionally, funds support development of a modular open standards systems compliant architecture. Successful solutions identified through evaluation in a high fidelity and realistic operating environment will be transitioned to Programs of Record for integration and fielding. Funds will also support integration with solutions identified in other Army network priorities to ensure network dependencies are addressed. Funds will support highly scalable and robust waveforms with simplified network management for operations in congested or contested environments.

Mission Common Operating Environment (COE)

This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Applications Layer. This line supports advanced component development activities that will inform a modernized network by evaluating and maturing the use of cloud technologies, virtual augmentation, artificial intelligence, data convergence and analytics in the Common Operating Environment (COE). This includes processing and storage to improve the architecture support for mobile, secure and distributed operations. COE creates an approved set of standards, computing technologies, integrated data and databases, common graphics, and a unified set of mission command applications. It allows warfighters to adapt and configure the network as conditions change - which is outlined in the approved COE requirements documents. FY 2026 funds will be used to mature technologies to assess and evaluate the technical feasibility of solutions for enhanced planning and execution capabilities that enable better and rapid decision making at the speed of relevance. Funds will also support identification, maturation, demonstration, and evaluation of Technology Readiness Level (TRL) 6+ systems and subsystem components including, but not limited to, data discovery, synchronization, security, and analysis across multiple data silos and disparate data platforms to efficiently create a common and integrated data layer to support Joint and Coalition Interoperability requirements. Funds will also support integration with solutions identified in other Army network priorities to ensure network dependencies are addressed.

Mission Command Post Mobility/Survivability

This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Infrastructure Layer. This line supports advanced component development activities that are aligned to Command Post mobility/survivability efforts that may transition to sponsoring programs that get integrated in the Army's future Command Posts. The technical maturation and evaluation allow for Command Post disaggregation capabilities to inform future designs and support Command Post survivability against near peer competitors. FY 2026 funds will be used to mature, prototype, and evaluate emerging technologies that will inform design choices for the Army's Command Post infrastructure. Funds also support identification, maturation, demonstration, and evaluation of Technology Readiness Level (TRL) 6+ systems and subsystem components including, but not limited to, a desired end state of resilient communications, adaptable computing and infrastructure, electromagnetic signature management, electromagnetic signature awareness, and distributed collaboration to support Joint and Coalition Interoperability requirements in addition to Multi-Domain Operations (MDO) in Denied, Disconnected, Intermittent, and Limited (DDIL) network conditions. Successful solutions identified through evaluation in a high fidelity and realistic operating environment will be transitioned to Programs of Record for integration and fielding. Funds will also support integration with solutions identified in other Army network priorities to ensure network dependencies are addressed.

Mission Unified Network Transport

This funding supports the Army's Next Generation Command and Control (NGC2) initiative to modernize Command and Control (C2) systems, Infrastructure, Applications, and Transport Layers. The Program Executive Office Command, Control, Communications-Network (PEO C3N) is responsible for programming, managing and executing these projects and ensuring these funds are aligned to advanced component development activities supporting the Army's Network Modernization requirements. PEO C3N, in partnership with the Command and Control Cross-Functional Team (C2-CFT), prioritizes technology demonstrations, focused evaluations, and expert analyses to inform future requirements, mature technologies, and deliver new capabilities. Efforts funded from these projects will inform technology transitions, research and development, and user assessments, and then rapidly transition to appropriate Programs of Record or be established as a new program. Unified Network Transport provides the ground domain network connectivity of Joint All Domain Command and Control (JADC2) and enables Unified Action Partner interoperability through integration with the Mission Partner Environment (MPE). Interoperability is the ability to routinely act together coherently, effectively and efficiently to achieve tactical, operational, and strategic objectives. Interoperability between disparate forces allows coalitions to produce greater combat power than the sum of their parts by leveraging relative strengths while mitigating relative weaknesses. FY 2026 funds will support identification, maturation, demonstration, and evaluation of Technology Readiness Level (TRL) 6+ systems and subsystem components including, but not limited to, resilient Line of Sight (LOS) and beyond Line of Sight (BLOS) communications, information management systems, cyber electromagnetic activities (CEMA) situational understanding and operations, intelligent and threat-informed networking, cloud technologies, virtual augmentation, artificial intelligence/ machine learning (AI/ML), and data convergence and analytics in the Common Operating Environment to achieve modernized Unified Network capabilities required for the Army's Command Control (C2) strategy for Infrastructure, Applications, and Transport. Successful solutions identified through evaluation in a high fidelity and realistic operating environment will be transitioned to Programs of Record for integration and fielding. Funds will also support integration with solutions identified in other Army network priorities to ensure network dependencies are addressed. The FY 2026 request was reduced by $2.553 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, "Implementing the President's Department of Government Efficiency Cost Efficiency Initiative."

Justification

Accomplishments & Planned Programs (6)

Program Management

Program management includes overall management of program execution, major events, reporting, funding execution, and contract management, as well as participation in program planning and Integrated Product Team meetings with key stakeholders.

Project BT5: Integrated Tactical Network/Integrated Enterprise Network

This funding is used to identify and acquire technologies to address gaps associated with the Unified Network for evaluation and demonstration in the overall Integrated Network. The Unified Network enables a converged Mission Command Network that operates seamlessly worldwide and in any environment. This will require the creation of a standards-based network architecture that effectively integrates enterprise and deployed network capabilities across domains and environments and features a unified transport layer that permits "plug and play" for specific network capabilities. This project addresses the following operational requirements: Converged Mission Command Network, Network Augmentation / Extension, and Synthetic Training Environment.

Program Management

Program management includes overall management of program execution, major events, reporting, funding execution, and contract management, as well as participation in program planning and Integrated Product Team meetings with key stakeholders.

BT3 Common Operating Environment

This funding is used to identify and acquire technologies to address gaps associated with the Common Operating Environment (COE), in the overall Integrated Network. This project creates an approved set of standards, computing technologies, integrated data and databases and common graphics and a unified set of mission command applications. It will also support collaboration using a common picture with joint and coalition mission partners. This project also delivers an integrated body of requirements that meet operational needs.

Program Management

Program management includes overall management of program execution, major events, reporting, funding execution, and contract management, as well as participation in program planning and Integrated Product Team meetings with key stakeholders.

BT2 Command Post Mobility and Survivability

This funding is used to identify and acquire technologies for evaluation that address gaps associated with the Command Post (CP) in the overall Integrated Tactical Network. The project will focus on developing and obtaining approval of requirements for integrated command posts, then delivering these integrated command post designs to Army units. The project also addresses the operational requirement of Deployable, Integrated, and Mobile Command Post and integrates Knowledge Management.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, ArmyAFY24 Actuals$47.2M
Research, Development, Test and Evaluation, ArmyAFY25 Enacted$31.8M
Research, Development, Test and Evaluation, ArmyAFY25 Total$31.8M
Research, Development, Test and Evaluation, ArmyAFY26 Disc. Request$29.2M
Research, Development, Test and Evaluation, ArmyAFY26 Total$29.2M

Budget Details(R-2/P-40 facts)

ProjectFY24 ActualsFY25 TotalFY26 BaseFY26 Request
BT2: Command Post Mobility/Survivability$5.76M$5.01M$3.84M$3.84M
BT3: Common Operating Environment (COE)$6.38M$7.06M$5.82M$5.82M
BT5: Integrated Tactical Network/Enterprise Network$35.1M$19.8M$19.5M$19.5M
Program Element$47.2M$31.8M$29.2M$29.2M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →