Advanced Arresting Gear (AAG)

NRDT&EPartial Reconciliation0604530N
What it is
Advanced Arresting Gear (AAG) — a research & development program run by Navy.
What changed
+$22.9M FY25→26
Who gets it
No award linkage at high confidence.

Budget Figures

FY24 Actuals
$10.0M
FY25 Total
$9.14M
FY26 Request
$32.0M
FY25→26 Change
$22.9M

FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →

Budget Trajectory
FY24: $10.0MFY25: $9.14MFY26: $32.0MFY24FY25FY26
FY24
$10.0M
FY25
$9.14M
FY26
$32.0M
Decade view — each figure cites its own President's Budget edition
FY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY17FY26

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

SeriesFY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$0$0$168.4M$115.9M$63.7M$146.0K$150.0K$10.0M
Enacted$0$172.2M$122.5M$65.8M$147.0K$151.0K$10.7M$9.14M
Request$184.1M$123.5M$65.8M$147.0K$151.0K$10.7M$9.14M$32.0M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2019 book requested $184.1M for FY2019; the PB2021 book reports $168.4M actually spent — $15.7M below the request.

Program Lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission Advanced Arresting Gear (AAG)

The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provide the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier-based tail hook-equipped air vehicles well into the 21st century. The AAG program will undergo future system improvements to address safety, obsolescence, and reliability, to include but not limited to AAG Software Stability, AAG Depot Planning, AAG Software Support Activity (SSA), and Reliability Improvement ECPs. The Software Stability development efforts will address software deficiencies, stability and reliability issues documented in a System Safety Risk Assessment (SSRA) for AAG software, and in a separate investigative report by a NAVAIR Independent Review Team (IRT). Development efforts will mitigate specific findings related to non-deterministic behavior and latency of the software that contribute to the SSRA Hazard rating (1D-Serious). Per IRT report recommendations, these efforts will address findings via software modernization and re-architecture, with new software adhering to improved Level or Rigor (LOR) standards and processes. AAG Depot Planning efforts will include analysis of test bench and depot repair Support Equipment, final updates to logistics product information and maintenance task analysis, and develop Overhaul work instruction, repair procedures, and overhaul intervals. AAG SSA funding provides development and execution of a high-level hybrid SSA planning document to ensure software test activities and procedures are implemented for AAG. Reliability improvements will be accomplished with the development of ECPs including but not limited to ECP-0120 Charging Power Supply, and pECP-027 AAG Water Twister Drain & Fill Kit. The Ford Class AAG Fourth Engine Low-Cost Alternative Using Super Capacitor Hardware (FLASH) provides for the development and fielding of an alternative to forced retrofit of the 4th Engine Energy Absorption Subsystem (EAS) on all Ford Class CVNs. This program is funded under System Development and Demonstration because it includes projects passed Milestone B approval and conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.

Mission Advanced Arresting Gear

The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provides the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier based tail hook-equipped air vehicles well into the 21st century. The AAG program will undergo future system improvements to address safety, obsolescence, and reliability, to include but not limited to AAG Software Stability, AAG Depot Planning, AAG Software Support Activity (SSA), and Reliability Improvement ECPs. The Software Stability development efforts will address software deficiencies, stability and reliability issues documented in a System Safety Risk Assessment (SSRA) for AAG software, and in a separate investigative report by a NAVAIR Independent Review Team (IRT). Development efforts will mitigate specific findings related to non-deterministic behavior and latency of the software that contribute to the SSRA Hazard rating (1D-Serious). Per IRT report recommendations, these efforts will address findings via software modernization and re-architecture, with new software adhering to improved Level or Rigor (LOR) standards and processes. Completion of AAG Depot Planning includes analysis of test bench and depot repair Support Equipment, final updates to logistics product information and maintenance task analysis, and develop Overhaul work instruction, repair procedures, and overhaul intervals. Previous Depot Planning efforts provided initial analysis and completion of Functional Requirements document (FRD). Depot Planning is approximately 85% complete, and does not have to be 100% complete to begin Depot Standup procurements. AAG SSA funding provides development and execution of a high-level hybrid SSA planning document to ensure software test activities and procedures are implemented for AAG. The Ford Class AAG Fourth Engine Low-Cost Alternative Using Super Capacitor Hardware (FLASH) provides for the development and fielding of an alternative to forced retrofit of the 4th Engine Energy Absorption Subsystem (EAS) on all Ford Class CVNs. Reliability improvements will be accomplished with the development of ECPs addressing AAG Production Impacts, including but not limited to ECP-0120 Charging Power Supply, and pECP-027 AAG Water Twister Drain & Fill Kit.

Justification

No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.

Budget Line Items(workbook-cited)

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$10.0M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$9.14M
Research, Development, Test and Evaluation, NavyNFY25 Total$9.14M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$32.0M
Research, Development, Test and Evaluation, NavyNFY26 Total$32.0M

Budget Details(R-2/P-40 facts)

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
2367: Advanced Arresting Gear$348.3M$10.0M$9.14M$32.0M$32.0M
Program Element$348.3M$10.0M$9.14M$32.0M$32.0M

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying Mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →