Printed from https://fiscalreceipts.com/program/0604530N/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Advanced Arresting Gear (AAG)
Watch this program
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $10.0M |
| FY25 | $9.14M |
| FY26 | $32.0M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $0 | $0 | $168.4M | $115.9M | $63.7M | $146.0K | $150.0K | $10.0M | ||
| Enacted | – | $0 | $172.2M | $122.5M | $65.8M | $147.0K | $151.0K | $10.7M | $9.14M | |
| Request | – | – | $184.1M | $123.5M | $65.8M | $147.0K | $151.0K | $10.7M | $9.14M | $32.0M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2019 book requested $184.1M for FY2019; the PB2021 book reported $168.4M as actual total obligation authority — $15.7M below the request. 168.4 − 184.1 = -15.7 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Advanced Arresting Gear (AAG)
The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provide the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier-based tail hook-equipped air vehicles well into the 21st century. The AAG program will undergo future system improvements to address safety, obsolescence, and reliability, to include but not limited to AAG Software Stability, AAG Depot Planning, AAG Software Support Activity (SSA), and Reliability Improvement ECPs. The Software Stability development efforts will address software deficiencies, stability and reliability issues documented in a System Safety Risk Assessment (SSRA) for AAG software, and in a separate investigative report by a NAVAIR Independent Review Team (IRT). Development efforts will mitigate specific findings related to non-deterministic behavior and latency of the software that contribute to the SSRA Hazard rating (1D-Serious). Per IRT report recommendations, these efforts will address findings via software modernization and re-architecture, with new software adhering to improved Level or Rigor (LOR) standards and processes. AAG Depot Planning efforts will include analysis of test bench and depot repair Support Equipment, final updates to logistics product information and maintenance task analysis, and develop Overhaul work instruction, repair procedures, and overhaul intervals. AAG SSA funding provides development and execution of a high-level hybrid SSA planning document to ensure software test activities and procedures are implemented for AAG. Reliability improvements will be accomplished with the development of ECPs including but not limited to ECP-0120 Charging Power Supply, and pECP-027 AAG Water Twister Drain & Fill Kit. The Ford Class AAG Fourth Engine Low-Cost Alternative Using Super Capacitor Hardware (FLASH) provides for the development and fielding of an alternative to forced retrofit of the 4th Engine Energy Absorption Subsystem (EAS) on all Ford Class CVNs. This program is funded under System Development and Demonstration because it includes projects passed Milestone B approval and conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Mission — Advanced Arresting Gear
The Advanced Arresting Gear (AAG) program designed, developed, tested and fielded an aircraft arrestment system to replace the legacy Mark 7 arresting gear. AAG systems are being installed on all new construction aircraft carriers. AAG will provides the U.S. Navy with improved operational capability, while reducing operating and support costs. The AAG system will recover all existing and projected carrier based tail hook-equipped air vehicles well into the 21st century. The AAG program will undergo future system improvements to address safety, obsolescence, and reliability, to include but not limited to AAG Software Stability, AAG Depot Planning, AAG Software Support Activity (SSA), and Reliability Improvement ECPs. The Software Stability development efforts will address software deficiencies, stability and reliability issues documented in a System Safety Risk Assessment (SSRA) for AAG software, and in a separate investigative report by a NAVAIR Independent Review Team (IRT). Development efforts will mitigate specific findings related to non-deterministic behavior and latency of the software that contribute to the SSRA Hazard rating (1D-Serious). Per IRT report recommendations, these efforts will address findings via software modernization and re-architecture, with new software adhering to improved Level or Rigor (LOR) standards and processes. Completion of AAG Depot Planning includes analysis of test bench and depot repair Support Equipment, final updates to logistics product information and maintenance task analysis, and develop Overhaul work instruction, repair procedures, and overhaul intervals. Previous Depot Planning efforts provided initial analysis and completion of Functional Requirements document (FRD). Depot Planning is approximately 85% complete, and does not have to be 100% complete to begin Depot Standup procurements. AAG SSA funding provides development and execution of a high-level hybrid SSA planning document to ensure software test activities and procedures are implemented for AAG. The Ford Class AAG Fourth Engine Low-Cost Alternative Using Super Capacitor Hardware (FLASH) provides for the development and fielding of an alternative to forced retrofit of the 4th Engine Energy Absorption Subsystem (EAS) on all Ford Class CVNs. Reliability improvements will be accomplished with the development of ECPs addressing AAG Production Impacts, including but not limited to ECP-0120 Charging Power Supply, and pECP-027 AAG Water Twister Drain & Fill Kit.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $10.0M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $9.14M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $9.14M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $32.0M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $32.0M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $348.3M | $10.0M | $9.14M | $32.0M | $32.0M |
| 2367: Advanced Arresting Gear | $348.3M | $10.0M | $9.14M | $32.0M | $32.0M |
Follow the dollar
Appropriation → program element → top high-confidence awards → recipient families → congressional districts.
Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →
The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.
| District | Program obligations |
|---|---|
| CA-50 | $775.9M |
Related awards
Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →
| Recipient | PIID | Confidence |
|---|---|---|
| GENERAL ATOMICS | N0001921F0818 | high |
| GENERAL ATOMICS | N0001922C0033 | high |
Contractor concentration
No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Advanced Arresting Gear (AAG). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J383
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J374
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J386
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J398
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J372
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J363
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J362
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J364
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil