What it is
Shipboard Aviation Systems (0604512N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 1 project.
What changed
+$23.0M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 1 linked award record is listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$10.2MR-1 TOA · PB2026
FY25 Total
$10.7MR-1 TOA · PB2026
FY26 Request
$33.7MR-1 TOA · PB2026
FY25→26 Change
+$23.0MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $10.2MFY25: $10.7MFY26: $33.7MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$10.2M
FY25$10.7M
FY26$33.7M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line falls across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$120.1M$117.4M$114.3M$174.0M$13.5M$14.5M$9.10M$8.89M$7.34M$10.2M
Enacted$120.2M$112.2M$177.9M$13.7M$14.6M$11.6M$8.92M$11.8M$10.4M$10.7M
Request$112.2M$177.9M$9.71M$10.6M$9.59M$8.92M$11.8M$10.4M$10.7M$33.7M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2023 book requested $11.8M for FY2023; the PB2025 book reported $7.34M as actual total obligation authority — $4.42M below the request. 7.344 − 11.759 = -4.415 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Shipboard Aviation Systems

CV Launch & Recover System - This Navy unique project addresses the System Development and Demonstration (SDD) of systems required to recover and launch Navy/Marine Corps Aircraft (Fixed/Rotary Wing and Vertical/Short Take Off and Landing) operating aboard aircraft carriers, amphibious assault ships, and air capable ships. This program element includes the following: (1) Aircraft Launch & Recovery Equipment Modernization (2) Aircraft Launch and Recovery Equipment Service Life Management program This program is funded under System Development and Demonstration because it includes projects that have passed Milestone B approval and conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.

Mission — CV/CVN Launch and Recover

This Navy unique project addresses the System Development and Demonstration (SDD) of systems required to recover and launch Navy/Marine Corps Aircraft (Fixed/Rotary Wing and Vertical/Short Take-Off and Landing) operating aboard aircraft carriers (CVN), amphibious assault ships and air capable ships. This program includes the following systems under Project 2232, including the funding of production representative models for: (1) Aircraft Launch & Recovery Equipment (ALRE) Modernization: ALRE Modernization encompasses efforts required to ensure continued functional performance, operational relevance, and cybersecurity accreditation for all product lines across the ALRE program. This includes efforts required to resolve emerging obsolescence issues (both hardware and software), implement fleet driven operational capability upgrades, and comply with cybersecurity requirements and computer task order requirements for security threat mitigation. Major categories include Visual Landing Aids (VLA), Information Systems, Launcher, Recovery, Marine Aviation Data Management System (MADMS) and Aviation Data Management and Control System (ADMACS). There are 48 fielded subsystems that are included in the major categories. The ALRE Gold Disk program provides diagnostic test routines for fleet technician troubleshooting capability on faulty circuit cards to identify the problem and perform the repair. VLA Long Range Line-Up (LRLS) is a solid state system required by CVNs Flight Deck Certification and provides visual cues for approaching fixed wing aircraft to ensure safe recovery of all platforms in all environments. Marine Aviation Data Management System (MADMS) is an integrated shipboard information system that provides near real-time situational awareness to key work centers by reducing data replication and provides discreet communications in support of air and surface operations on amphibious assault ships with process automation, distribution and display of information, and integration of key operational systems like weapons, combat cargo/surface ops, shipboard planning, flight ops, and flight deck management. (2) Aircraft Launch & Recovery Equipment (ALRE) Service Life Management Program (SLMP): The ALRE SLMP for Launcher and Recovery is required to sustain carrier aviation operations of higher energy aircraft launch and recoveries that are increasing loads on the ALRE systems, and that are affecting availability, maintainability and cost. This program will consist of service life assessment and extension initiatives and will establish the design foundation (structural, reliability, and maintainability analyses), permit appropriate assessment, track and focus design changes where most needed. Two SLMP prototypes were procured in FY 2018. The Nimitz class aircraft carriers operate Mark 7 arresting gear systems to capture and arrest Navy aircraft. The Mark 7 systems use a classic linear-piston cylinder setup to convert the kinetic energy of the aircraft into storage energy. Specifically, a control system is used to apply correct logic to piston-cylinder closing parameters depending upon the aircraft type that is being arrested. This is called Advanced Recovery Control (ARC). The current ARC system was designed with early 2000's technology and components that have reached their end-of-life and are not compliant with current cybersecurity protocols. To support continued operations through 2060, a series of developmental engineering changes are required for modernized control components, technology and cybersecurity. This is the ARC Block Upgrade.

Justification

Accomplishments & Planned Programs (1)

Aircraft Launch & Recovery Equipment (ALRE) Modernization

ALRE Modernization encompasses efforts required to ensure continued functional performance, operational relevance, and cybersecurity accreditation for all product lines across the ALRE program. This includes efforts required to resolve emerging obsolescence issues (both hardware and software), implement fleet driven operational capability upgrades, and comply with cybersecurity requirements and computer task order requirements for security threat mitigation. Major categories include Visual Landing Aids (VLA), Information Systems, Launcher, Recovery, Marine Aviation Data Management System (MADMS), and Aviation Data Management and Control System (ADMACS). There are 48 fielded subsystems included in the major categories. Note: - Implementation of MADMS was performed under an Engineering Change Proposal (ECP) to ADMACS in budget line item 4213 - Aircraft Support Equipment. System development efforts funded in RDTE&N allow continual development and modernization of MADMS software. - VLA Long Range Line of Sight (LRLS) efforts initiated in FY 2024 through FY 2025 in program element 0605217N - Common Avionics, project 0572 - JT Service/NV Std Avionics CP/SB funded in the Avionics Component Improvement Program (AvCIP).

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$10.2M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$10.7M
Research, Development, Test and Evaluation, NavyNFY25 Total$10.7M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$33.7M
Research, Development, Test and Evaluation, NavyNFY26 Total$33.7M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$1.12B$10.2M$10.7M$33.7M$33.7M
2232: CV/CVN Launch and Recover$1.12B$10.2M$10.7M$33.7M$33.7M

Follow the dollar

Appropriation → program element → top high-confidence awards → recipient families → congressional districts.

Follow-the-dollar covers 312 of 1,938 programs — only high-confidence budget→award links are shown. why coverage is partial? →

The program's money traced left to right: the N appropriation, program element 0604512N (Shipboard Aviation Systems), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.
The program's money traced left to right: the N appropriation, program element 0604512N (Shipboard Aviation Systems), its 1 largest high-confidence awards, the 1 recipient family behind them, and the 1 congressional district the work is recorded in. Read it for concentration — how few families and districts the awards run through. Amounts inside the diagram are illustrative per-award transaction sums; the table below carries the cited per-district obligations.APPROPRIATIONPROGRAM ELEMENTTOP AWARDSRECIPIENT FAMILIESDISTRICTSNRDT&E appropriation0604512N33.7M FY26N6833523C0248NORTHROP GRUMMAN SYSTEMS CO…43.9MNorthrop Grumman Corporat…MD-02

The diagram illustrates the cited table below — amounts shown in the diagram are transaction sums per award (no citation chips); the per-district obligations in the table cite USAspending queries.

The diagram as text: one row per congressional district in the diagram, the recipient families shown there, and that district's cited program obligations.
DistrictProgram obligations
MD-02$43.9M

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

RecipientPIIDConfidence
NORTHROP GRUMMAN SYSTEMS CORPORATIONN6833523C0248high

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Shipboard Aviation Systems. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.