Printed from https://fiscalreceipts.com/program/0604454N/ — data as of July 28, 2026. Every figure is citation-backed; see the page online for per-number provenance.
LX (R)
Budget Figures
FY2026 award data is a partial year — USASpending awards are reported on a rolling basis and the fiscal year does not close until September 30. why partial FY2026 data? →
- FY24
- $21.2M
- FY25
- $9.77M
- FY26
- $26.7M
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $32.5M | $73.4M | $24.7M | $9.43M | $5.46M | $12.0M | $10.0M | $3.33M | $18.8M | $21.2M | ||
| Enacted | $75.5M | $6.35M | $9.58M | $5.55M | $12.5M | $10.2M | $3.34M | $18.8M | $21.3M | $9.77M | ||
| Request | $6.35M | $9.58M | $5.55M | $12.5M | $10.2M | $3.34M | $26.6M | $21.3M | $12.8M | $26.7M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $6.35M for FY2017; the PB2019 book reports $24.7M actually spent — $18.4M above the request.
Program Lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — LPD Flight II Design & Total Integration
LPD 17 Flight II will replace LSD 41 Class ships and LSD 49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. This project includes efforts to reduce the cost of building and repairing ships, resolving obsolescence issues, and improving shipbuilding industry productivity through: advanced technology and processes with emphasis towards developing ship hull, mechanical, propulsion, electrical, aviation, warfare system, combat support system, sub-systems and components to maintain manpower, survivability, operational capabilities, and pursue affordability initiatives. This program element includes the planning & documentation for Developmental Test and Evaluation (DT&E), Live Fire Test & Evaluation (LFT&E), Operational Evaluation (OPEVAL), and Follow-on Operational Test and Evaluation (FOT&E) tests required for LPD 17 Flight II. These test events will be conducted on the lead Flight II Ship (LPD 30) or where configuration supports capabilities on earlier ships (LPD 28 or LPD 29). The test events will be conducted as needed on Flight II Follow Ship (LPD31) for verification of correction of deficiencies (VCD) from the lead Flight II Ship (LPD 30).
Mission — LX (R)
LPD 17 Flight II will replace LSD 41 Class ships and LSD 49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. This project includes efforts to reduce the cost of building and repairing ships, resolving obsolescence issues, and improving shipbuilding industry productivity through: advanced technology and processes with emphasis towards developing ship hull, mechanical, propulsion, electrical, aviation, warfare system, combat support system, sub-systems and components to maintain manpower, survivability, operational capabilities, and pursue affordability initiatives. This program element includes the planning & documentation for Developmental Test and Evaluation (DT&E), Live Fire Test & Evaluation (LFT&E), Operational Evaluation (OPEVAL), and Follow-on Operational Test and Evaluation (FOT&E) tests required for LPD 17 Flight II. These test events will be conducted on the lead Flight II Ship (LPD 30) or where configuration supports capabilities on earlier ships (LPD 28 or LPD 29). The test events will be conducted as needed on Flight II Follow Ship (LPD 31) for verification of correction of deficiencies (VCD) from the lead Flight II Ship (LPD 30). Per signed Acquisition Decision Memorandum, LPD 17 Flight II will meet the Capabilities Development Document for LX(R) and shall subsume all previous LX(R) efforts. Name change endorsed in JROCM 093-21, from "Amphibious Ship Replacement LX(R)" to "LPD 17 San Antonio Class Amphibious Transport Dock FLT II." LPD 30 is the first ship of LPD 17 Flight II.
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget Line Items(workbook-cited)
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $21.2M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $9.77M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $9.77M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $26.7M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $26.7M |
Budget Details(R-2/P-40 facts)
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $143.0M | $21.2M | $9.77M | $26.7M | $26.7M |
| 2474: LPD Flight II Design & Total Integration | $143.0M | $21.2M | $9.77M | $26.7M | $26.7M |
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 17 of 1741 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying Mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
No research dossier for this program — dossiers cover 50 of 1741 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →