Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $21.2M |
| FY25 | $9.77M |
| FY26 | $26.7M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $32.5M | $73.4M | $24.7M | $9.43M | $5.46M | $12.0M | $10.0M | $3.33M | $18.8M | $21.2M | ||
| Enacted | $75.5M | $6.35M | $9.58M | $5.55M | $12.5M | $10.2M | $3.34M | $18.8M | $21.3M | $9.77M | ||
| Request | $6.35M | $9.58M | $5.55M | $12.5M | $10.2M | $3.34M | $26.6M | $21.3M | $12.8M | $26.7M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2017 book requested $6.35M for FY2017; the PB2019 book reported $24.7M as actual total obligation authority — $18.4M above the request. 24.73 − 6.35 = 18.38 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — LX (R)
LPD 17 Flight II will replace LSD 41 Class ships and LSD 49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. This project includes efforts to reduce the cost of building and repairing ships, resolving obsolescence issues, and improving shipbuilding industry productivity through: advanced technology and processes with emphasis towards developing ship hull, mechanical, propulsion, electrical, aviation, warfare system, combat support system, sub-systems and components to maintain manpower, survivability, operational capabilities, and pursue affordability initiatives. This program element includes the planning & documentation for Developmental Test and Evaluation (DT&E), Live Fire Test & Evaluation (LFT&E), Operational Evaluation (OPEVAL), and Follow-on Operational Test and Evaluation (FOT&E) tests required for LPD 17 Flight II. These test events will be conducted on the lead Flight II Ship (LPD 30) or where configuration supports capabilities on earlier ships (LPD 28 or LPD 29). The test events will be conducted as needed on Flight II Follow Ship (LPD 31) for verification of correction of deficiencies (VCD) from the lead Flight II Ship (LPD 30). Per signed Acquisition Decision Memorandum, LPD 17 Flight II will meet the Capabilities Development Document for LX(R) and shall subsume all previous LX(R) efforts. Name change endorsed in JROCM 093-21, from "Amphibious Ship Replacement LX(R)" to "LPD 17 San Antonio Class Amphibious Transport Dock FLT II." LPD 30 is the first ship of LPD 17 Flight II.
Mission — LPD Flight II Design & Total Integration
LPD 17 Flight II will replace LSD 41 Class ships and LSD 49 Class ships for embark, transport, control, insert, sustainment, and extract of Marine Air-Ground Task Force elements and supporting forces by helicopters, landing craft, and amphibious vehicles. This project includes efforts to reduce the cost of building and repairing ships, resolving obsolescence issues, and improving shipbuilding industry productivity through: advanced technology and processes with emphasis towards developing ship hull, mechanical, propulsion, electrical, aviation, warfare system, combat support system, sub-systems and components to maintain manpower, survivability, operational capabilities, and pursue affordability initiatives. This program element includes the planning & documentation for Developmental Test and Evaluation (DT&E), Live Fire Test & Evaluation (LFT&E), Operational Evaluation (OPEVAL), and Follow-on Operational Test and Evaluation (FOT&E) tests required for LPD 17 Flight II. These test events will be conducted on the lead Flight II Ship (LPD 30) or where configuration supports capabilities on earlier ships (LPD 28 or LPD 29). The test events will be conducted as needed on Flight II Follow Ship (LPD31) for verification of correction of deficiencies (VCD) from the lead Flight II Ship (LPD 30).
Justification
No accomplishments or planned-program narratives in this line's J-book detail — some exhibits carry figures without per-project prose.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $21.2M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $9.77M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $9.77M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $26.7M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $26.7M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $143.0M | $21.2M | $9.77M | $26.7M | $26.7M |
| 2474: LPD Flight II Design & Total Integration | $143.0M | $21.2M | $9.77M | $26.7M | $26.7M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not LX (R). No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J331
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J291
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J320
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J329
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J341
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J355
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J326
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J316
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J314
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J316
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil