Printed from https://fiscalreceipts.com/program/0604378N/ — built September 26, 2026. Every figure is citation-backed; see the page online for per-number provenance.
Naval Integrated Fire Control - Counter Air Systems Engineering
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $78.1M |
| FY25 | $41.4M |
| FY26 | $39.9M |
All series figures: R-1 TOA · PB2026
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY15 | FY16 | FY17 | FY18 | FY19 | FY20 | FY21 | FY22 | FY23 | FY24 | FY25 | FY26 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Actuals | $14.9M | $23.0M | $25.1M | $24.8M | $32.5M | $28.9M | $41.9M | $49.1M | $44.9M | $78.1M | ||
| Enacted | $23.7M | $25.8M | $25.4M | $33.4M | $30.1M | $42.0M | $50.2M | $45.9M | $66.4M | $41.4M | ||
| Request | $25.8M | $25.4M | $33.4M | $33.4M | $44.5M | $46.1M | $45.9M | $66.4M | $41.4M | $39.9M |
blank = series not published for this year; – = absent from that edition.
Asked vs spent: the PB2024 book requested $66.4M for FY2024; the PB2026 book reported $78.1M as actual total obligation authority — $11.6M above the request. 78.06 − 66.44 = 11.62 USD millions — the compact figures above are rounded for reading.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Nav Integrated Fire Control - Counter Air Sys E
PU 2757 All domain Long Range Networked Fires (LRNF) is a cross organizational Systems Engineering, Integration and Test (SEIT) project to coordinate and align the acquisition enterprise for the delivery of effective and interoperable long range kill chains. This effort will coordinate development and validation of all kill chain components across key enabler programs that include sensors, networks, transport architectures, radios, weapons, platforms, and combat systems across warfighting domains. The project will include joint architecture and Battle Management Command and Control (BMC2) development and maturation, including integration of the key enabler programs to optimize current and emerging capabilities across Navy and other mission partners. Development and execution of the LRNF integrated System of Systems (SoS) acquisition approach will prioritize nearer term fielding of effective capabilities, while continuing to mature solutions and informing investments across the portfolio. 3159 Naval Integrated Fire Control (NIFC) SEI&T project is a systems engineering effort to extend the Naval Integrated Air and Missile Defense battlespace out to the maximum kinematic range of our weapons for the air, surface, and strike warfare missions. This includes targets beyond the detection range of the shooter. The NIFC project exploits capabilities inherent in existing systems, optimizes current and emerging technologies in component system upgrades, integrates them together, and performs kill chain tests, forming an interoperable System of Systems (SoS) to maximize future defense capabilities. As directed by OPNAV, the project is focused on SEI&T efforts to integrate the From The Sea (FTS) family of kill chains which includes an elevated sensor, platform, fire control system, and missile, along with introducing other networks and sensors coordinating with other DOD activities as appropriate. Along with executing NIFC Inc 2 developmental test & fielding the SEIT supports the design of the current kill chain and system configuration and architectures. Future NIFC efforts (e.g. NIFC Inc 3) includes SEIT activities across a broad range of systems and architectures. 3242 Naval Integrated Fire Control (NIFC) From the Air (FTA) SEI&T project is a systems engineering effort to integrate NIFC FTA capabilities within "Pillar Programs" (F/A-18 & EA-18G, E-2D, F-35, Link-16 and Tactical Targeting Network Technology Data Links, and all USN air launched Air-to-Air and Air-to-Surface weapons). Based on the advancing threat, there remains an imperative to improve lethality, survivability and interoperability by extending the battlespace out to the maximum kinematic range of our weapons for the air, surface, and strike warfare missions. The NIFC FTA project leverages capabilities inherent in existing systems, optimizes current and emerging technologies in platform system upgrades, and integrates them together to form interoperable System of Systems (SoS) to maximize offensive and defensive FTA integrated capabilities. As directed from OPNAV, the project is focused on development of Air Warfare, Surface Warfare, and Strike Warfare FTA effects chains. This PU will support efforts that include decomposing SoS requirements into Mission Technical Baselines (MTBs) and Integrated Capability Technical Baselines (ICTBs) for requirement allocation to Pillar Programs. Additionally, this PU will support NIFC pillar program coordination to provide performance predictions, performance assessments, and SoS risk reduction activities through Live, Virtual, and Constructive (LVC) events, SoS exercises, and development of Requirements Test and Verification Matrices (RTVMs) to support Developmental and Operational Test for the individual platforms. In lieu of a traditional Test and Evaluation Master Plan (TEMP), NIFC FTA test strategies will be developed to identify resources required to evaluate NIFC FTA capabilities, and describe how NIFC FTA capabilities will be evaluated prior to fleet delivery. JUSTIFICATION FOR BUDGET ACTIVITY: This program is funded under SYSTEM DEVELOPMENT AND DEMONSTRATION because it includes those projects that have passed Milestone B approval and are conducting engineering and manufacturing development tasks aimed at meeting validated requirement prior to full-rate production decision.
Mission — All Domain Long Range Naval Integrated Fire Control (LR-NIFC)
All domain Long Range Networked Fires (LRNF) is a cross organizational Systems Engineering, Integration and Test (SEIT) project to coordinate and align the acquisition enterprise for the delivery of effective and interoperable long range kill chains. This effort will coordinate development and validation of all kill chain components across key enabler programs that include sensors, networks, transport architectures, radios, weapons, platforms, and combat systems across warfighting domains. The project will include joint architecture and Battle Management Command and Control (BMC2) development and maturation, including integration of the key enabler programs to optimize current and emerging capabilities across Navy and other mission partners. Development and execution of the LRNF integrated System of Systems (SoS) acquisition approach will prioritize nearer term fielding of effective capabilities, while continuing to mature solutions and informing investments across the portfolio.
Mission — Naval Integrated Fire Control-Counter Air SE&I
3159 Naval Integrated Fire Control (NIFC) Systems Engineering Integration and Test (SEI&T) project is a systems engineering capability-based integration effort to extend the Naval Integrated Air and Missile Defense battlespace out to the maximum kinematic range of our weapons for the air, surface warfare missions. This includes targets beyond the detection range of the shooter. The NIFC project exploits capabilities inherent in existing systems, optimizes current and emerging technologies in component system upgrades, integrates them together, and performs kill chain tests, forming an interoperable System of Systems (SoS) to maximize future defense capabilities. As directed by OPNAV, the project is focused on SEI&T efforts to integrate the From The Sea (FTS) family of kill chains which includes a sensor-data/track-data network, one or more distributed sensors, a weapon, and a weapon control system. NIFC Inc 3 introduces other networks and sensors coordinating with other DoD activities as appropriate. NIFC Increment 3 includes SEIT activities across a broad range of systems and architectures, developmental test and fielding, and the design of effects chain architectures (referred to as ARC) within various system configurations.
Mission — NIFC-CA Supported by Airborne Platforms
Naval Integrated Fire Control (NIFC) From the Air (FTA) Systems Engineering Integration and Test (SEI&T) project is a systems engineering effort to integrate NIFC FTA capabilities within "Pillar Programs" (F/A-18 & EA-18G, E-2D, F-35, Link-16 and Tactical Targeting Network Technology Data Links, and all USN air launched Air-to-Air and Air-to-Surface weapons). Based on the advancing threat, there remains an imperative to improve lethality, survivability and interoperability by extending the battlespace out to the maximum kinematic range of our weapons for the air, surface, and strike warfare missions. The NIFC FTA project leverages capabilities inherent in existing systems, optimizes current and emerging technologies in platform system upgrades, and integrates them together to form interoperable System of Systems (SoS) to maximize offensive and defensive FTA integrated capabilities. As directed from OPNAV, the project is focused on development of Air Warfare, Surface Warfare, and Strike Warfare FTA effects chains. This PU will support efforts that include decomposing SoS requirements into Model Based Systems Engineering products including Mission Technical Baselines (MTBs), Integrated Capability Technical Baselines (ICTBs) and associated digital architectures for requirement allocation to Pillar Programs. Additionally, this PU will support NIFC pillar program coordination to provide performance predictions, performance assessments, and SoS risk reduction activities through Live, Virtual, and Constructive (LVC) events, SoS exercises, and development of Requirements Test and Verification Matrices (RTVMs) to support Developmental and Operational Test for the individual platforms, with T&E results summarized in a Mission Assessment Report. Performance assessments include data collection and analysis on Carrier Air Wings in deployment workups in order understand the effectiveness of the fielded SoS and the operators who employ them. In lieu of a traditional Test and Evaluation Master Plan (TEMP), NIFC FTA test strategies will be developed to identify resources required to evaluate NIFC FTA capabilities, and describe how NIFC FTA capabilities will be evaluated prior to fleet delivery.
Mission — Congressional Adds
Congressional ADD for Stratospheric Balloon High Altitude Testing efforts. Integrate and demonstrate the Navy's Minimum Viable Payload in the stratosphere to support a persistent datalink network demand signal from the fleet.
Justification
Accomplishments & Planned Programs (4)
Development, Integration, and fielding of effective all domain Long Range Networked Fires.
All domain Long Range Networked Fires (LRNF) is a cross organizational Systems Engineering, Integration and Test (SEIT) project to coordinate and align the acquisition enterprise for the delivery of effective and interoperable long range kill chains. This effort will coordinate development and validation of all kill chain components across key enabler programs that include sensors, networks, transport architectures, radios, weapons, platforms, and combat systems across warfighting domains. The project will include joint architecture and Battle Management Command and Control (BMC2) development and maturation, including integration of the key enabler programs to optimize current and emerging capabilities across Navy and other mission partners. Development and execution of the LRNF integrated System of Systems (SoS) acquisition approach will prioritize nearer term fielding of effective capabilities, while continuing to mature solutions and informing investments across the portfolio.
Integration and Test (I&T) Integrated Product Team (IPT)
The Integration and Test (I&T) Integrated Product Team (IPT) develops and executes the test plan to assess the operational capability, performs risk reduction testing leveraging various component system tests. Test data will be used over time to verify, validate, and accredit the simulation federation.
Engineering Management And System Definition
Engineering management and system definition including the development of the Systems Performance Document (SPD), System of Systems (SoS) functional allocations, requirements, traceability, SoS trades studies, SoS information exchange requirements, interface specifications, and sensor network capability analysis. Provides for complete kill chain performance analysis and interface verification through development of a federation of simulations provided directly from the Programs of Record (PORs). Programs of Record include an elevated sensor, fire control system, platform and missile, as well as an expanding set of sensors and networks. NIFC Increment 3 adds multiple new sensors, networks, and weapons to the kill chain including Tactical Air Support (TACAIR) integration, (Electronic Warfare), and Battle management development and improvement. Federated SoS simulations support architecture development, scenario development, predictive analysis for testing, and define capabilities and limitations of FTS kill chain performance analysis and interface verification through development of a federation of simulations provided directly from the FTS PORs and future enhancements.
NIFC From the Air (FTA) Capabilities Effectiveness and Integration
Develops and executes multi-platform cross-domain offensive and defensive kinematic and non-kinematic effects chains.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Navy | N | FY24 Actuals | $78.1M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Enacted | $41.4M |
| Research, Development, Test and Evaluation, Navy | N | FY25 Total | $41.4M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Disc. Request | $39.9M |
| Research, Development, Test and Evaluation, Navy | N | FY26 Total | $39.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $430.3M | $78.1M | $41.4M | $39.9M | $39.9M |
| 2757: All Domain Long Range Naval Integrated Fire Control (LR-NIFC) | $0 | $23.9M | $0 | $0 | $0 |
| 3159: Naval Integrated Fire Control-Counter Air SE&I | $397.6M | $29.3M | $29.0M | $28.9M | $28.9M |
| 3242: NIFC-CA Supported by Airborne Platforms | $32.7M | $11.4M | $12.5M | $11.0M | $11.0M |
| 9999: Congressional Adds | $0 | $13.5M | $0 | $0 | $0 |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
Showing 25 of 37 from the Senate LDA disclosure database.
National Defense Authorization Act, 2027 (HR 8800/S 4784); provisions regarding R&D - Navy, US Marine Corps, Air…
National Defense Authorization Act, 2027 (HR XXXX/S XXXX); provisions regarding R&D - Navy, US Marine Corps, Air…
S. 4784, H.R. 8880, National Defense Authorization Act. S. 4615, H.R. 9624, Intelligence Authorization Act. Defense…
National Defense Authorization Act (No Bill Number). Intelligence Authorization Act (No Bill Number). Defense…
P.L. 119-60 - National Defense Authorization Act FY26, National Defense Authorization Act FY27 (bills pending)…
H.R. 8800/S. 4784 - National Defense Authorization Act FY27, H.R. 9495 - Department of Defense Appropriations Act FY27…
S.2296 - National Defense Authorization Act for Fiscal Year 2026 H.R. 3838, the Streamlining Procurement for Effective…
National Defense Authorization Act for Fiscal Year 2027 JADC2 Cybersecurity. Cloud Acquisition policy/funding; DoD…
Department of Defense Appropriations Act, 2026 (HR 4016/ S 2572); provisions regarding R&D - Navy, Air Force, Space…
S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…
S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…
S. 2296, National Defense Authorization Act. S. 2342, Intelligence Authorization Act. Defense Appropriations. Quantum…
National Defense Authorization Act (no bill number). Intelligence Authorization Act (no bill number) Defense…
National Defense Authorization Act FY26, Department of Defense Appropriations Act FY26, Intelligence Authorization Act…
H.R. 3838/S. 2296 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations…
P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…
H.R. 3838 - National Defense Authorization Act FY26 (Senate bill pending), H.R. 4016 - Department of Defense…
P.L. 119-60 - National Defense Authorization Act FY26, H.R. 4016/S. 2572 - Department of Defense Appropriations Act…
S.5618 - FoRGED Act (FOSTERING REFORM AND GOVERNMENT EFFICIENCY IN DEFENSE) National Defense Authorization Act JADC2…
Cybersecurity Border security technology Artificial Intelligence Countering Weapons of Mass Destruction Counter…
S.2296 - National Defense Authorization Act for Fiscal Year 2026 H.R. 3838, the Streamlining Procurement for Effective…
Cybersecurity Border security technology Artificial Intelligence Countering Weapons of Mass Destruction Counter…
S.2296 - National Defense Authorization Act for Fiscal Year 2026 H.R. 3838, the Streamlining Procurement for Effective…
H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…
H.R. 2670, S. 2226, National Defense Authorization Act of 2024. H.R. 3932, S. 2103 Intelligence Authorization Act for…
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Naval Integrated Fire Control - Counter Air Systems Engineering. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J374
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2017 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J326
Complete workbook · unchanged saved copy. Saves as PB2017_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2018 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J356
Complete workbook · unchanged saved copy. Saves as PB2018_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2019 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J367
Complete workbook · unchanged saved copy. Saves as PB2019_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2020 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J379
Complete workbook · unchanged saved copy. Saves as PB2020_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2021 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J390
Complete workbook · unchanged saved copy. Saves as PB2021_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2022 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J364
Complete workbook · unchanged saved copy. Saves as PB2022_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2023 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J355
Complete workbook · unchanged saved copy. Saves as PB2023_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2024 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J354
Complete workbook · unchanged saved copy. Saves as PB2024_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · J356
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
RDTEN BA1-3 Book · www.secnav.navy.mil