Skip to content
Fiscal Receipts

Standard Missile Improvements

NavyRDT&EReconciledPE0604366N
What it is
Standard Missile Improvements (0604366N) is a Navy research & development line funded in the Research, Development, Test and Evaluation, Navy account. Its J-book detail breaks the line into 3 projects.
What changed
+$124.7M FY25→26 R-1 TOA · PB2026
Who gets it
No single contractor is published as this line's leader. 2 linked award records are listed below. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. Why the crosswalk is partial.

Budget figures

FY24 Actuals
$366.2MR-1 TOA · PB2026
FY25 Total
$288.3MR-1 TOA · PB2026
FY26 Request
$413.0MR-1 TOA · PB2026
FY25→26 Change
+$124.7MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $366.2MFY25: $288.3MFY26: $413.0MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$366.2M
FY25$288.3M
FY26$413.0M

All series figures: R-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.
12 fiscal years of this program as published (FY2015–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line rises across the span. The grid below is the same data as text, one cited figure per cell.FY2015 actuals — PB2017 editionFY2016 actuals — PB2018 editionFY2017 actuals — PB2019 editionFY2018 actuals — PB2020 editionFY2019 actuals — PB2021 editionFY2020 actuals — PB2022 editionFY2021 actuals — PB2023 editionFY2022 actuals — PB2024 editionFY2023 actuals — PB2025 editionFY2024 actuals — PB2026 editionFY2016 enacted — PB2017 editionFY2017 enacted — PB2018 editionFY2018 enacted — PB2019 editionFY2019 enacted — PB2020 editionFY2020 enacted — PB2021 editionFY2021 enacted — PB2022 editionFY2022 enacted — PB2023 editionFY2023 enacted — PB2024 editionFY2024 enacted — PB2025 editionFY2025 enacted — PB2026 editionFY2017 request — PB2017 editionFY2018 request — PB2018 editionFY2019 request — PB2019 editionFY2020 request — PB2020 editionFY2021 request — PB2021 editionFY2022 request — PB2022 editionFY2023 request — PB2023 editionFY2024 request — PB2024 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY15FY18FY20FY22FY24FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY15FY16FY17FY18FY19FY20FY21FY22FY23FY24FY25FY26
Actuals$50.2M$111.3M$113.6M$114.8M$199.5M$196.1M$295.6M$341.4M$298.3M$366.2M
Enacted$115.6M$120.6M$158.6M$190.9M$195.3M$305.8M$343.5M$309.9M$418.2M$288.3M
Request$120.6M$158.6M$165.9M$232.4M$386.2M$343.5M$319.9M$418.2M$468.3M$413.0M

blank = series not published for this year; – = absent from that edition.

Asked vs spent: the PB2021 book requested $386.2M for FY2021; the PB2023 book reported $295.6M as actual total obligation authority — $90.6M below the request. 295.6 − 386.2 = -90.6 USD millions — the compact figures above are rounded for reading.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Standard Missile Improvements

STANDARD Missile (SM) is Navy's premier Integrated Air and Missile Defense (IAMD) capability providing ship's self-defense and Fleet area-defense against great power competition advanced threats. The SM active family of missiles (FoM) includes Medium Range (MR) SM-2 BLK IIIC, Extended Range (ER) SM-6 BLK I, IA, IAU and Long-range (LR) SM-6 BLK IB. This SM active FoM evolution improves primary mission areas for IAMD and evolved to include additional multi-mission defensive and offensive hypersonic kinetic capabilities. Today the SM-2 BLK IIICU, SM-6 BLK IAU and SM-6 BLK IB are aligned with the Joint Warfare Concept (JWC), Joint Concept for Fires (JCF), the Navy's Navigation Plan Implementation Framework (NIF), and Navy Distributed Maritime Operations (DMO) to deliver the Navy and the Joint Force transformative capabilities addressing Combatant Commander and Chairman of the Joint Chief of Staff (JCS) highest capability gaps and capability requirements to support the Joint Operating Environment (JOE) for 2030 and 2045. The Standard Missile 2 BLK IIIC (SM-2 Block IIIC) is a transformation from medium range (MR) semi-active to MR active capability incorporating the SM-6 BLK I active seeker and delivering improved capabilities against the most challenging Air Warfare (AW) threats. The program was designated an Accelerated Acquisition (AA) program by the CNO/ASN RDA on November 14, 2017. The SM-2 Block IIIC Middle Tier Acquisition (MTA) program (previously known as accelerated acquisition program) delivered Initial Capability in 1Q FY 2023. The SM-2 BLK IIIC is transitioning from an MTA program into a Major Capability Acquisition (MCA) program for SM-2 BLK IIICU upon approval of the Acquisition Program Baseline (APB). As part of the SM-6 Family of Missiles, SM-2 Block IIICU will provide the fleet with a Medium Range (MR) active missile capability. SM-2 Block IIICU is intended to project power, provide area defense, and contribute to raid annihilation. The SM-2 Block IIICU combines the tested legacy of SM-2 propulsion stack and ordnance with capability improvements developed in the SM-6 Block I Program to improve overall missile performance via an ECP to the existing SM-6. The SM-2 Block IIICU Program was designated an ACAT II Program on 18 April 2022. The Standard Missile-6 (SM-6) BLK IB is an upgrade of the SM-6 BLK IAU, which provides long-range fires capability by implementing improved software and replacing the existing Mk 104 Dual-Thrust Rocket Motor (DTRM) with a new 21-inch rocket motor to extend the range. The SM-6 BLK IB delivers to the Navy and Joint Force a transformative multi-domain, multi-mission offensive hypersonic kinetic capability. As a result of internal deliberations, the SM-6 Blk IB program is currently on a strategic pause and only efforts to develop the 21-inch rocket motor are currently active.

Mission — Standard Missile Improvement

"Future Combat System Integration S-Band Radar (AMDR-S) for DDG 51 Flight III ships, with other platforms/Combat System baselines, will include requirements review/updates and analysis, verification; technical documentation, design review and working group Subject Matter Expert (SME) support, missile/radar integration, missile test hardware procurement, risk assessment, safety, test and evaluation planning, analysis, and data collection. Deliverables include interface control documents (ICDs) changes, missile specifications changes, and engineering documents updates to support AEGIS Baseline 10 (BL10) Integrated Program Review (IPR) Process Engineering Development Model (EDM) testing; Combat Systems Engineering Development Site (CSEDS), Moorestown, NJ; Combat System/missile integration testing at Pacific Missile Range Facility/Advanced Radar Detection Laboratory (PMRF/ARDEL) Kauai, HI and Sudbury, MA; Waterfront Integration Testing (WIT) and Electromagnetic Environmental Effects (E3) and Hazard of Electromagnetic Radiation to Ordnance (HERO) testing, analysis, and reports for BL10 DDG 51 FLT III FY 2022-2023; Developmental Testing and Operational Testing (DT/OT), analysis, and reports for BL10 DDG 51 FLT III FY 2023-2024 and Integrated Air Missile Defense Testing in FY 2026/2027. The Standard Missile 2 BLK IIIC (SM-2 BLK IIIC) is a transformation from medium range (MR) semi-active to MR ""active"" capability incorporating the SM-6 Blk I active seeker and delivering improved capabilities against the most challenging Air Warfare (AW) threats. The program was designated an Accelerated Acquisition (AA) program by the CNO/ASN RDA on November 14, 2017. The SM-2 BLK IIIC Middle Tier Acquisition (MTA) program (previously known as accelerated acquisition program) delivered Initial Capability in 1Q FY 2023. The SM-2 BLK IIIC plans to transition from an MTA program into a Major Capability Acquisition (MCA) program for SM-2 BLK IIICU upon approval of the Acquisition Program Baseline (APB). The FY 2023 and 2024 funding allows for the SM-2 BLK IIIC program to transition to a SM-2 BLK IIICU program with integration of the electronics unit upgrade and is being conducted in coordination with the international community via FMS cases. The SM-2 BLK IIIC/IIICU is the primary Anti-Air Warfare (AAW) weapon for the FFG 62 class of ships. The addition of the MR IIIC/IIICU active seeker capability does not require missile illuminators as previously required for legacy semi-active missiles."

Mission — SM-6 Blk IB

The STANDARD Missile 6 BLK IB provides an extended range capability for SM-6 and would provide a key contribution to the protection of Joint U.S. Forces in support of the National Defense Strategy. SM-6 BLK IB addresses valid Joint, Fleet, and Navy Urgent Operational Needs and existing Joint Requirements Oversight Council (JROC)-approved requirements. This missile aligns with the STANDARD Missile roadmap and takes advantage of the Navy's investment in the AEGIS Weapon System (AWS) and leverages advanced missile technology from the SM-6 Family of Missiles and a new 21-inch rocket motor. This program will prototype a new rocket motor in a competitive demonstration effort under a Middle Tier of Acquisition Program. Pending a missile development restart decision, the program will integrate extended range communications into the missile and conduct an extended range demonstration of the SM-6 BLK IB missile under a prototyping effort. Upon completion of the prototyping efforts, the program would transition to a major capability Acquisition program to complete system integration, qualification, developmental testing and operational test.

Mission — Standard Missile 6 Program

"The STANDARD Missile 6 Electronics Unit (EU) funding is for the design, systems engineering, analysis, integration, and test of replaced obsolete components. This effort is jointly funded with the Missile Defense Agency for a shared approach to obsolescence and improved capability in defense of the sea base. Initial funding provided for the requirements generation, risk reduction/mitigation, and establishment of development facilities necessary for the commencement of the obsolescence project. The Missile Defense Agency was the contracting office for the risk reduction/mitigation and establishment of development facilities which completed in FY 2020. The USN development effort began in FY 2021, continues into FY 2026 and remains a jointly funded effort with the Missile Defense Agency. This effort will deliver a SM-6 BLK IAU Engineering Change Proposal in Q4 FY 2027 to continue production of SM-6 BLK IA Missiles with the Upgraded Electronics Unit. SM-6 Systems Integration and Fleet Engagement (SIFE) leverages existing missile technology and advanced missile technology. It aligns missile technology roadmaps across the services (NAVSEA, NAVAIR, USAF, USMC and USA) and missile variants within the services, taking advantage of the Navy's investment in the AEGIS Weapons System (AWS) and Cooperative Engagement Capability (CEC). This program will provide an extended range engagement capability to provide the air superiority and the umbrella of protection for joint U.S. forces and allies against the full spectrum of manned-fixed and rotary-wing aircraft, unmanned aerial vehicles, and land attack and anti-ship cruise missiles in flight. This program contributes to the continuous protection of forward deployed ground maneuver forces as well as theater rear assets supporting mission requirements discussed in the National Security Strategy (NSS), Secretary of Defense National Defense Strategy (NDS), Chairman of the Joint Chiefs' National Military Strategy (NMS), Capstone Concept for Joint Operations (CCJO), Joint Requirements Oversight Council (JROC) Integrated Air and Missile Defense (IAMD) Initial Capability Document (ICD), the JROC IAMD Joint Integrating Concept (JIC), JROC IAMD Operational Concept; the Theater and Air Missile Defense ICD (TAMD MDA-ICD), the Chairman of the Joint Chiefs of Staff Joint IAMD Vision 2020/2030 and the Joint Publication 3-01 Countering Air and Missile Threats; the Navy's Integrated Fire Control Naval Integrating Capability Concept (NIFC-NICC), the JROC Operational Requirements Document (ORD) for SM-6 Block 1, and the JROC SM-6 Capability Production Document. SIFE includes the research, development, test and evaluation necessary to incorporate the software in production missiles. SM-6 funding for AEGIS integration will verify compatibility with the Aegis builds that will use the full performance of the advanced missile. The SIFE project will directly support the Future Capabilities Demonstration (FCD). The initial completed FCD project was a high priority mission requirements requested by Combatant Commanders by improving the SM-6 Missile's capability. The project is continuing analyses and trade studies required for Fleet employment, future enhancements and expansion of the mission capabilities for the SM-6 Block IA missile and perform the necessary missile software development to support mission capability improvement."

Justification

Accomplishments & Planned Programs (2)

Standard Missile-2 BLK IIICU TTP

Transition to Production (TTP) is typically funded either fully with procurement or a combination of RDTE and procurement, thus the corresponding split between WPN BLI 2356 supports the RDTE investment of TTP under PU 0439. TTP enables the Prime vendor the ability to transition from development to production with the intent to increase production throughput and capacity to meet increasing demands from the Navy.

SM-6 BLK IAU TTP

Transition to Production (TTP) is typically funded either fully with procurement or a combination of RDTE and procurement, thus the corresponding split between WPN BLI 2234 supports the RDTE investment of TTP under PU 3092. TTP enables the Prime vendor the ability to transition from development to production with the intent to increase production throughput and capacity to meet increasing demands from the Navy.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, NavyNFY24 Actuals$366.2M
Research, Development, Test and Evaluation, NavyNFY25 Enacted$288.3M
Research, Development, Test and Evaluation, NavyNFY25 Total$288.3M
Research, Development, Test and Evaluation, NavyNFY26 Disc. Request$413.0M
Research, Development, Test and Evaluation, NavyNFY26 Total$413.0M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$3.62B$366.2M$288.3M$413.0M$413.0M
0439: Standard Missile Improvement$1.51B$35.6M$66.7M$85.8M$85.8M
2063: SM-6 Blk IB$614.2M$162.7M$162.3M$83.2M$83.2M
3092: Standard Missile 6 Program$1.50B$167.8M$59.4M$243.9M$243.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Related awards

Award linkage is shown for 32 of 200 profiled companies — high- and medium-confidence USAspending matches, each row labeled; medium is the weaker evidence. why partial award coverage? →

Rows marked medium rest on evidence weaker than a program-level match, and of more than one kind. An account-based row, where the award drew from the same appropriation account as this program, is an association, not evidence that this program paid for the contract. Where the evidence is instead an FPDS acquisition-program tag or a subaward description, the program is established but which of its budget lines paid is not. An announcement link a recorded review did not leave standing is medium too. Only high rows rest on the contract naming this program with a recorded review upholding it and no recorded rejection or refutation applying.

RecipientPIIDConfidence
RAYTHEON COMPANYN0002413C5403medium
RAYTHEON COMPANYN0002417C5410medium

Contractor concentration

No concentration index is published for this line. This line's high-confidence links do not clear the floor for a published concentration index — at least 3 awards across 2 contractor families holding positive obligations, with positive net linked dollars. An index below that floor is a fact about the sample, not about the market. Whatever further links this line carries are medium-confidence, and what each medium evidence path does and does not establish is set out in the methodology. Both bases are in the downloadable warehouse.

Lobbying mentions

8 mentions from the Senate LDA disclosure database.

PHILLIPS 66Standard|Improvements2026matched 2+ title words

H.R. 1346, Nationwide Consumer and Fuel Retailer Choice Act of 2025; H.R. 3109, REFINER Act; S. 3759, Security…

PHILLIPS 66Standard|Improvements2026matched 2+ title words

*draft* legislation supporting year around E15 and Small Refinery Exemption reform; H.R. 7148 - Consolidated…

PHILLIPS 66Standard|Improvements2025matched 2+ title words

SA #3397 to S. 2296, the National Defense Authorization FY 2026; H.R. 1346, S. 593, Nationwide Consumer and Fuel…

PHILLIPS 66Standard|Improvements2025matched 2+ title words

S. 996, Preserving Choice in Vehicle Purchases Act of 2025; H.R. 1346, S. 593, Nationwide Consumer and Fuel Retailer…

PHILLIPS 66Standard|Improvements2025matched 2+ title words

S. 996, Preserving Choice in Vehicle Purchases Act of 2025; SA #3397 to S. 2296, the National Defense Authorization FY…

PHILLIPS 66Standard|Improvements2025matched 2+ title words

S. 996, Preserving Choice in Vehicle Purchases Act of 2025; H.R. 1346, S. 593, Nationwide Consumer and Fuel Retailer…

LOCKHEED MARTIN CORPORATIONMissile|Improvements2024matched 2+ title words

S 2226/HR 2670 - National Defense Authorization Act for Fiscal Year 2024 including issues related to aircraft…

LOCKHEED MARTIN CORPORATIONMissile|Improvements2024matched 2+ title words

S (not yet introduced)/HR 8774 - Department of Defense Appropriations Act, 2025 including issues related to aircraft…

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Standard Missile Improvements. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.