Nuclear Delivery Systems Prototyping
Budget figures
FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →
Budget trajectory
| Fiscal year | Amount |
|---|---|
| FY24 | $0J-book detail · PB2026 |
| FY25 | $39.1MR-1 TOA · PB2026 |
| FY26 | $56.9MR-1 TOA · PB2026 |
Decade view
P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition
The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.
● actuals (line) · ○ enacted · ◇ request — gaps are editions the program is absent from, never interpolated.
| Series | FY25 | FY26 |
|---|---|---|
| Enacted | $39.1M | |
| Request | $39.1M | $56.9M |
blank = series not published for this year; – = absent from that edition.
Program lineage
No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.
Description
Mission — Prototyping
The Air-delivered Nuclear Delivery System project addresses a United States Strategic Command capability gap resulting from a congressionally directed study which led to endorsement of the Department of Defense's Deputy's Management Action Group and initiation of this project. The Department of Air Force is working with the Department of Energy's National Nuclear Security Administration and its National Laboratories to quickly develop and demonstrate a prototype Air-Delivered system based on fielded technologies to close this gap in the near term. The project requires close Department of Air Force and Department of Energy interagency coordination to produce a prototype that will enable rapid transition to a fielded system. Early development will include Modeling and Simulation analysis of several Nuclear Explosive Package options to refine the proposed Nuclear Explosive Package. The Air-Delivered Nuclear Delivery System must meet nuclear weapon's environmental standards from storage to weapon detonation, while meeting reliability and target defeat requirements. The Air Force will provide test resources to include ground test facilities, F-15E test aircraft, and B-2 test aircraft, and will work with the aircraft Program Offices to identify aircraft integration requirements including any potential Operational Flight Program software and hardware changes. The Air Force will procure and provide the National Nuclear Security Administration with the components necessary to produce Prototype Weapon Assemblies for capturing environments and demonstrating functionality in high-fidelity ground and air tests. Ground tests may include static ejection, vibration and thermal, cable pull-down, sled tests, and other environments testing. Flight tests will be performed by Air Force F-15E developmental flight test aircraft, with final prototype demonstrations planned to fly on B-2 aircraft. Considerations in the development of the prototype include nuclear surety, maintenance and logistics, refinement of requirements (Military Characteristics), and producibility. After successful flight test demonstration of the prototype, the program will mature developmental hardware to nuclear system "diamond stamp” quality, ensure nuclear surety standards are met, and mature aircraft interfaces including Aircraft Monitor and Control functions. The Air Force Research Laboratory is focused on high-impact, multi-domain science, technology, and prototyping solutions that drive innovation now while laying the groundwork for the Air and Space Force to win the future fight. The Air Force Research Laboratory effectively synchronizes the Department of Air Force science and technology enterprise and workforce to align towards the most consequential DAF priorities and accelerate the delivery of game-changing science, technology, and prototypes. In order to manage, execute, and deliver capabilities, this program element may include necessary civilian pay expenses; expenses to support the operation and maintenance of facilities; as well as expenses related to travel, supplies, IT hardware, software and support, and administrative contractor services. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.
Justification
Accomplishments & Planned Programs (1)
Air-Delivered Nuclear Delivery System
Develop and demonstrate a prototype air-delivered nuclear delivery system in coordination with the Department of Energy National Nuclear Security Administration and its National Laboratories.
Budget line items(workbook-cited)
P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.
Exhibit R-1
| Account | Org | Type | Amount |
|---|---|---|---|
| Research, Development, Test and Evaluation, Air Force | F | FY25 Enacted | $39.1M |
| Research, Development, Test and Evaluation, Air Force | F | FY25 Total | $39.1M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Disc. Request | $56.9M |
| Research, Development, Test and Evaluation, Air Force | F | FY26 Total | $56.9M |
Budget Details(R-2/P-40 facts)
J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.
Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.
| Project | All Prior Years | FY24 Actuals | FY25 Total | FY26 Base | FY26 Request |
|---|---|---|---|---|---|
| Program Element | $0 | $0 | $39.1M | $56.9M | $56.9M |
| 643360: Prototyping | $0 | $0 | $39.1M | $56.9M | $56.9M |
Follow the dollar
No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →
Awards
No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.
Lobbying mentions
No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.
Oversight
Department-level designation (not specific to this program)
GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Nuclear Delivery Systems Prototyping. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.
Program dossier
No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →
Primary sources
Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.
Budget totals · TOA sources
FY2026 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · M554
Complete workbook · unchanged saved copy. Saves as PB2026_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
FY2025 Department of Defense Budget: RDT&E Programs (R-1) · comptroller.war.gov
Exhibit R-1 · L570
Complete workbook · unchanged saved copy. Saves as PB2025_DoD_R-1_Research-Development-Test-Evaluation.xlsx.
Detailed budget justification
The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.
FY2026 Air Force Research and Development Test and Evaluation, Vol. I · www.saffm.hq.af.mil
PDF page 13