What it is
Nuclear Delivery Systems Prototyping (0604336F) is an Air Force research & development line funded in the Research, Development, Test and Evaluation, Air Force account. Its J-book detail breaks the line into 1 project.
What changed
+$17.8M FY25→26 R-1 TOA · PB2026
Who gets it
No company is linked to this line. Award records do not carry the program element, so the crosswalk is silent here — why.

Budget figures

FY24 Actuals
$0J-book detail · PB2026
FY25 Total
$39.1MR-1 TOA · PB2026
FY26 Request
$56.9MR-1 TOA · PB2026
FY25→26 Change
+$17.8MR-1 TOA · PB2026
Data coverage

FY2026 award data is a partial year — USAspending reports awards on a rolling basis, and this corpus runs through 2026-09-04. why partial FY2026 data? →

Budget trajectory

The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.
The program's 3 summary figures for FY24 to FY26, plotted in fiscal-year order: this line ends higher than it starts. The points are the summary cards above, not a separate derivation; the table beside the chart carries each figure with its own citation.FY24: $0FY25: $39.1MFY26: $56.9MFY24FY25FY26
Budget trajectory: one row per fiscal year, carrying the summary figure the sparkline plots. Every figure opens its own citation.
Fiscal yearAmount
FY24$0J-book detail · PB2026
FY25$39.1MR-1 TOA · PB2026
FY26$56.9MR-1 TOA · PB2026

Decade view

P-1/R-1 workbook TOA basis, shown compact in $B/$M (the workbook records USD thousands); each figure cites its own President's Budget edition

2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.
2 fiscal years of this program as published (FY2025–FY2026): a line through the actuals (filled dots), with the enacted (hollow circles) and request (diamonds) markers each edition reported. Read it for direction, not for precision — this program's actuals line is too short to show a direction. The grid below is the same data as text, one cited figure per cell.FY2025 enacted — PB2026 editionFY2025 request — PB2025 editionFY2026 request — PB2026 editionFY25FY26

The vertical scale does not start at zero: the baseline sits just below this program’s smallest year, so a low point on this line is not a small amount. Read the shape for direction and the grid below for the figures.

● actuals (line)  ·  ○ enacted  ·  ◇ request — gaps are editions the program is absent from, never interpolated.

Decade series values by fiscal year and President's Budget edition: one row per series (actuals, enacted, request), one column per fiscal year. Every figure opens its own citation.
SeriesFY25FY26
Enacted$39.1M
Request$39.1M$56.9M

blank = series not published for this year; – = absent from that edition.

Program lineage

No predecessor/successor lineage was recorded for this program element — no FY-to-FY transfer into or out of this line was stated in the ingested J-books, and none was inferred from the program structure.

Description

Mission — Prototyping

The Air-delivered Nuclear Delivery System project addresses a United States Strategic Command capability gap resulting from a congressionally directed study which led to endorsement of the Department of Defense's Deputy's Management Action Group and initiation of this project. The Department of Air Force is working with the Department of Energy's National Nuclear Security Administration and its National Laboratories to quickly develop and demonstrate a prototype Air-Delivered system based on fielded technologies to close this gap in the near term. The project requires close Department of Air Force and Department of Energy interagency coordination to produce a prototype that will enable rapid transition to a fielded system. Early development will include Modeling and Simulation analysis of several Nuclear Explosive Package options to refine the proposed Nuclear Explosive Package. The Air-Delivered Nuclear Delivery System must meet nuclear weapon's environmental standards from storage to weapon detonation, while meeting reliability and target defeat requirements. The Air Force will provide test resources to include ground test facilities, F-15E test aircraft, and B-2 test aircraft, and will work with the aircraft Program Offices to identify aircraft integration requirements including any potential Operational Flight Program software and hardware changes. The Air Force will procure and provide the National Nuclear Security Administration with the components necessary to produce Prototype Weapon Assemblies for capturing environments and demonstrating functionality in high-fidelity ground and air tests. Ground tests may include static ejection, vibration and thermal, cable pull-down, sled tests, and other environments testing. Flight tests will be performed by Air Force F-15E developmental flight test aircraft, with final prototype demonstrations planned to fly on B-2 aircraft. Considerations in the development of the prototype include nuclear surety, maintenance and logistics, refinement of requirements (Military Characteristics), and producibility. After successful flight test demonstration of the prototype, the program will mature developmental hardware to nuclear system "diamond stamp” quality, ensure nuclear surety standards are met, and mature aircraft interfaces including Aircraft Monitor and Control functions. The Air Force Research Laboratory is focused on high-impact, multi-domain science, technology, and prototyping solutions that drive innovation now while laying the groundwork for the Air and Space Force to win the future fight. The Air Force Research Laboratory effectively synchronizes the Department of Air Force science and technology enterprise and workforce to align towards the most consequential DAF priorities and accelerate the delivery of game-changing science, technology, and prototypes. In order to manage, execute, and deliver capabilities, this program element may include necessary civilian pay expenses; expenses to support the operation and maintenance of facilities; as well as expenses related to travel, supplies, IT hardware, software and support, and administrative contractor services. This effort is in Budget Activity 4, Advanced Component Development and Prototypes (ACD&P), because efforts are necessary to evaluate integrated technologies, representative modes or prototype systems in a high fidelity and realistic operating environment.

Justification

Accomplishments & Planned Programs (1)

Air-Delivered Nuclear Delivery System

Develop and demonstrate a prototype air-delivered nuclear delivery system in coordination with the Department of Energy National Nuclear Security Administration and its National Laboratories.

Budget line items(workbook-cited)

P-1/R-1 workbook Total Obligation Authority basis (USD thousands) · PB2026.

Exhibit R-1

AccountOrgTypeAmount
Research, Development, Test and Evaluation, Air ForceFFY25 Enacted$39.1M
Research, Development, Test and Evaluation, Air ForceFFY25 Total$39.1M
Research, Development, Test and Evaluation, Air ForceFFY26 Disc. Request$56.9M
Research, Development, Test and Evaluation, Air ForceFFY26 Total$56.9M

Budget Details(R-2/P-40 facts)

J-book detail basis (R-2/P-40, USD millions) · PB2026 — a different accounting basis from the P-1/R-1 workbook TOA above; where the two disagree, the reconciliation strip under Budget figures shows both.

Wider than this screen — swipe the table sideways for the remaining fiscal-year columns.

ProjectAll Prior YearsFY24 ActualsFY25 TotalFY26 BaseFY26 Request
Program Element$0$0$39.1M$56.9M$56.9M
643360: Prototyping$0$0$39.1M$56.9M$56.9M

Follow the dollar

No follow-the-dollar view — this program's awards haven't been crosswalked at high confidence (flows cover 312 of 1,938 programs). why coverage is partial? →

Awards

No awards are linked to this program element at high or medium confidence — the budget→award crosswalk only asserts links it can defend, and this line has none yet.

Lobbying mentions

No Senate LDA lobbying filing in the tracked data mentions this program element by code or alias.

Oversight

Department-level designation (not specific to this program)

GAO lists 5 high-risk areas for DOD as a whole. That designation covers the department, not Nuclear Delivery Systems Prototyping. No program-specific GAO finding for this line is in the ingested data. See the DOD oversight record.

Program dossier

No research dossier for this program — dossiers cover 50 of 1,938 programs, the largest fully J-book-detailed lines by FY2026 requested dollars. why no dossier here? →

Primary sources

Open any budget figure for its exact receipt. Verified line items lead with the highlighted government PDF; original spreadsheets download with their budget edition and exhibit in the filename.

Budget totals · TOA sources

Detailed budget justification

The related TOA spreadsheets above use a different accounting basis from R-2/P-40 detail. Their amounts are not assumed to match these detailed sources.